Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4245Under construction83 units

Ahs Tower ايه اتش اس تاور Trade Center Second by Ahs Tower Holding Development L.L.C S.O.C 67.4% built (DLD register as of 1 November 2026) DLD end date Jan 2027 2 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Towers along Sheikh Zayed Road above the road interchange
Area photo: Sheikh Zayed Road, not this project
% built
67.4%
DLD register, 1 November 2026
Period elapsed
81%
Oct 2025 → Jan 2027
Latest sales
—
Fewer than 5 recent sales
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
67.4%Elapsed
81%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 67.4% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 67.4% built on 19 May 2026 (inspections: 2).
Every DLD inspection and every change in the register %, newest first
Date % built Source
19 May 2026 67.4% DLD inspection
11 December 2025 60.2% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 67.4% → 67.4%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Buildings
1
1 on construction permits
Permit status
Open
445333
Issued
21 August 2026
Consultant · contractor
BH NS ENGINEERING CONSULTANTS L.L.C · RATLS CONTRACTING L.L.C
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
No stage listed1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
4245
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai Municipality
DLD area
Trade Center Second
Units · villas
83 · 0
Start → DLD end
Oct 2025 → Jan 2027

Description in the DLD register: The Tower configuration B+G+70F+R Office Tower situated along Sheikh Zayed Road, Dubai, United Arab Emirates, that involves selling 80 No. Shell & Core Office Units.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

No off-plan sales are registered for this project since 2020, so there is no launch price.

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Rents in DLD area Trade Center Second

New Ejari rent contracts for apartments across DLD area Trade Center Second, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 65,000 39 -7.1%
1 BR AED 85,000 171 -9.6%
2 BR AED 110,250 236 -5.8%
3 BR AED 140,000 152 0%
4 BR AED 278,911 8 -22.5%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Looking for a unit in this or similar projects?

Tell us what you are looking for in Ahs Tower or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Not enough registered off-plan sales for an estimate (at least 5 of one bedroom count in 12 months).

Automated estimate, not a valuation

Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Ahs Tower? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Jan 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Jan 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Ahs Tower? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationTrade Center Second · Dubai Municipality community

Emirates Towers Metro Station · 90 mLifco Zabeel Supermarket · 180 mAl Satwa Park 3 · 590 mZoom · 630 mThe Gate Avenue · 690 mFinancial Centre Metro Station · 730 mInvisible Braces Dental And Skin Polyclinic · 730 mFicus Gardens · 800 malmaya supermarkets · 810 mHospital · 910 mGEMS Wellington Primary School · 1 kmWorld Trade Centre Metro Station · 1.1 kmAl Shhaab Schol for Basic Edication · 1.2 kmSalma al Ansaria School · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationEmirates Towers Metro Station · Red Metro line · 90 m
MallThe Gate Avenue · 690 m
SupermarketLifco Zabeel Supermarket · 180 m
HospitalInvisible Braces Dental And Skin Polyclinic · 730 m
SchoolGEMS Wellington Primary School · 1 km
ParkAl Satwa Park 3 · 590 m
BeachBeach · 2.7 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 46, with 7,930 units and villas.

2025: 562026: 1,4892027: 1,0512028: 1,7462029: 1,1882030: 1,8262031: 574

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Every project in Trade Center Second

Developer in DLD data Ahs Tower Holding Development L.L.C S.O.C · DLD developer no. 2539

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
83 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Ahs Tower

When is Ahs Tower's handover?

DLD lists an end date of Jan 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Ahs Tower past its DLD end date?

No. Its DLD end date is Jan 2027, 2 months after the register of 1 November 2026.

How far along is Ahs Tower?

67.4% built in the DLD register of 1 November 2026.

Who is the developer of Ahs Tower?

Ahs Tower Holding Development L.L.C S.O.C, as registered with DLD.

What is the DLD project number of Ahs Tower?

4245.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error