DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

Dubai off-plan handovers in 2026 317 projects registered to end in 2026 · 63 completed · 238 under construction DLD projects register as of 1 November 2026 · sales to 5 November 2026

317 projects in the Dubai Land Department projects register have an end date in 2026. As of 1 November 2026, 63 are completed, 238 are under construction and 16 have not started. 140 of those under construction are past their DLD end date. These are the DLD end dates registered for each project, not handover forecasts.

Registered to end in 2026
317
projects · 63,126 units not yet completed
Completed
63
marked completed by DLD
Under construction
238
98 with the end date to come
Not started
16
Not yet active on the DLD register
Under construction, past end date
140
of 238 under construction

Source: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026.

DLD end dates by month

317 projects

Columns link to their monthly pages. Source: DLD projects register, export of 1 November 2026.

% built where the end date is still to come

98 projects

Projects under construction with a DLD end date later in 2026

0–24%: 1525–49%: 3450–74%: 3275–100%: 17

% built from the latest register reading. Source: DLD projects register, export of 1 November 2026.

DLD can change a project’s end date; the dates here are those in the latest export. In most completed projects the end date in the register equals the completion date, so a completed project counted here may have had a different end date before.

Not yet completed (254)254 projects with a 2026 DLD end date, by sales over 24 months

254 projects with a 2026 DLD end date, by sales over 24 months
ProjectArea Built DLD end dateTo DLD end date Units
Mag 777Al Hebiah Fourth 67.4% 15 Jan 2026 9 mo past 266
Azizi Venice 7Madinat Al Mataar 29.2% 28 Jan 2026 9 mo past 2,276
Biltmore SufouhAl Safouh First 87.6% 29 Jan 2026 9 mo past 477
Trussardi ResidencesJabal Ali First 36.2% 31 Jan 2026 9 mo past 142
Expo City Mangrove ResidencesMadinat Al Mataar 91.2% 31 Jan 2026 9 mo past 470
The GrandalaAl Satwa 90.7% 31 Jan 2026 9 mo past 86
Aria By BeyondMadinat Dubai Almelaheyah 84.9% 31 Jan 2026 9 mo past 192
Expo City ValleyMadinat Al Mataar 66% 31 Jan 2026 9 mo past 528
Keturah ResortAl Jadaf 15.3% 26 Feb 2026 — 231
Binghatti AmberhallAl Barsha South Fourth 70% 28 Feb 2026 8 mo past 710
Binghatti RubyAl Barsha South Fourth 65% 28 Feb 2026 8 mo past 628
161 Jumeirah LaneAl Satwa 70% 1 Mar 2026 8 mo past 161
Lodge Residences by Riviera AzureAl Barsha South Fourth 63.3% 1 Mar 2026 8 mo past 56
One CrescentPalm Jumeirah 80.1% 1 Mar 2026 8 mo past 25
Uh West By EllingtonAl Thanyah Fifth 83.7% 3 Mar 2026 7 mo past 381
Pier 8Marsa Dubai 70.1% 8 Mar 2026 7 mo past 341
Samana Waves 2Al Barsha South Fourth 52.1% 20 Mar 2026 7 mo past 173
Sportz By DanubeAl Hebiah Fourth 80.2% 30 Mar 2026 7 mo past 1,110
Uh East By EllingtonAl Thanyah Fifth 62.8% 30 Mar 2026 7 mo past 381
Best Town VillasAl Barsha South Fifth 76.1% 30 Mar 2026 7 mo past 3
Binghatti HavenAl Hebiah Fourth 76.1% 31 Mar 2026 7 mo past 501
Binghatti StarlightAl Jadaf 63.1% 31 Mar 2026 7 mo past 511
PELaGOS By IGOMarsa Dubai 84.2% 31 Mar 2026 7 mo past 296
Palatium ResidencesAl Barsha South Fourth 87.9% 31 Mar 2026 7 mo past 151
Mayflower ResidencesWarsan Fourth 96.1% 31 Mar 2026 7 mo past 99
Roma Residences by JRPAl Barsha South Fourth 76.8% 31 Mar 2026 7 mo past 80
The QuaysideBusiness Bay 54.6% 31 Mar 2026 7 mo past 119
Lua ResidencesWadi Al Safa 3 64.4% 31 Mar 2026 7 mo past 37
Orchid Residence 1Madinat Al Mataar 48.5% 31 Mar 2026 7 mo past 44
Niki Lauda TowerBusiness Bay 0.4% 31 Mar 2026 — 384
Binghatti HillviewsAl Barshaa South Second 32.6% 1 Apr 2026 7 mo past 1,575
Urban Park ResidencesAl Hebiah Fourth 67.6% 1 Apr 2026 7 mo past 187
Mackerel TowerPalm Deira 56.6% 1 Apr 2026 7 mo past 62
Eywa DubaiBusiness Bay 65.7% 1 Apr 2026 7 mo past 53
Allegro ResidencesPalm Deira 84.5% 7 Apr 2026 6 mo past 60
The Woodland ResidencesWadi Al Safa 3 75.4% 8 Apr 2026 6 mo past 30
Almaan 101Al Barsha South Fourth 50.9% 13 Apr 2026 6 mo past 102
Elysee HeightsAl Barsha South Fourth 81.3% 14 Apr 2026 6 mo past 193
Samana WavesAl Barsha South Fourth 90.6% 15 Apr 2026 6 mo past 197
Nad Al Sheba Gardens Phase 3Nad Al Shiba First 97% 19 Apr 2026 6 mo past 235
Dalmore TowerWadi Al Safa 5 95.1% 23 Apr 2026 6 mo past 120
Beach Oasis 2Al Hebiah Second 53.2% 30 Apr 2026 6 mo past 704
Binghatti TwilightAl Jadaf 55.4% 30 Apr 2026 6 mo past 277
Verdana Residence 2Dubai Investment Park First 20% 30 Apr 2026 6 mo past 239
Parkwood ResidencesAl Barsha South Fourth 57% 30 Apr 2026 6 mo past 174
Aura EliteNadd Hessa 44.3% 30 Apr 2026 6 mo past 86
Imperial ResidenceMe'Aisem First 43% 30 Apr 2026 6 mo past 137
ROVE HOME RESIDENCES by IRTHBurj Khalifa 62.7% 30 Apr 2026 6 mo past 349
Samana SkyrosAl Barshaa South Third 71.3% 30 Apr 2026 6 mo past 441
Samana Mykonos SignatureAl Barshaa South Third 86% 30 Apr 2026 6 mo past 300
Samana MykonosAl Hebiah Second 91.1% 30 Apr 2026 6 mo past 198
W1Jabal Ali First 70.2% 30 Apr 2026 6 mo past 83
WAREF residences by sido developmentAl Barsha South Fourth 81.1% 1 May 2026 6 mo past 228
Cavara 42Al Barshaa South Third 75.8% 2 May 2026 5 mo past 49
Alma GardensWadi Al Safa 2 50.3% 15 May 2026 5 mo past 80
Babette Sapphire ResidenceAl Jadaf 78.4% 15 May 2026 5 mo past 66
Terrazzo ResidencesAl Barsha South Fourth 95.2% 20 May 2026 5 mo past 211
Signature MansionsMe'Aisem First 86.9% 25 May 2026 5 mo past 18
Azizi Venice 14Madinat Al Mataar 30.3% 30 May 2026 5 mo past 3,438
One by BinghattiBusiness Bay 50.2% 30 May 2026 5 mo past 755
South Bay 2Madinat Al Mataar 93.8% 30 May 2026 5 mo past 145
08 Life ResidencesWarsan Fourth 64.9% 31 May 2026 5 mo past 107
Estrella By NexusWadi Al Safa 3 45.5% 31 May 2026 5 mo past 60
Skyhills II by HREAl Barsha South Fourth 96% 1 Jun 2026 5 mo past 526
Skyhills III by HREAl Barsha South Fourth 75.7% 1 Jun 2026 5 mo past 513
Time 2Wadi Al Safa 5 87.1% 1 Jun 2026 5 mo past 304
Primero Residences by Main RealtyJabal Ali First 21.1% 1 Jun 2026 — 86
Maison Cannelle Residences by Casa ModernaJabal Ali First 40.4% 1 Jun 2026 5 mo past 40
Residences Du Port, Dubai Marina, Autograph Collection ResidencesMarsa Dubai 71.1% 6 Jun 2026 4 mo past 74
Beach Walk Residences 3 By ImtiazPalm Deira 97.3% 14 Jun 2026 4 mo past 82
Floarea VistaJabal Ali First 63% 14 Jun 2026 4 mo past 158
Binghatti MoonlightAl Jadaf 19.2% 15 Jun 2026 4 mo past 286
Urban LifeBusiness Bay 80% 15 Jun 2026 4 mo past 147
Onaya Residences by KayaAl Satwa 37.7% 27 Jun 2026 4 mo past 41
Binghatti EliteMe'Aisem First 53.3% 30 Jun 2026 4 mo past 1,745
Binghatti HillsideAl Barshaa South Second 80% 30 Jun 2026 4 mo past 411
Violet TowerAl Barsha South Fourth 90.2% 30 Jun 2026 4 mo past 287
Evergrin HouseAl Satwa 54.5% 30 Jun 2026 4 mo past 219
Ghaff Land ResidenceAl Hebiah Second 66.4% 30 Jun 2026 4 mo past 168
Enso JadeAl Satwa 42.1% 30 Jun 2026 4 mo past 105
Burj Binghatti Jacob & Co. ResidencesBusiness Bay 52.1% 30 Jun 2026 4 mo past 325
Tulip Oasis 11Wadi Al Safa 3 93% 30 Jun 2026 4 mo past 108
Lucky Oasis ResidenceAl Barsha South Fourth 20% 30 Jun 2026 4 mo past 144
Casa Vista Residence By Golden WoodsAl Barsha South Fourth 90.1% 30 Jun 2026 4 mo past 90
Haven Bay ResidencesPalm Deira 82.9% 30 Jun 2026 4 mo past 64
Viewz 2 By DanubeAl Thanyah Fifth 65% 30 Jun 2026 4 mo past 564
Viewz 1 By DanubeAl Thanyah Fifth 66.5% 30 Jun 2026 4 mo past 564
Enso AmberAl Satwa 11.3% 30 Jun 2026 4 mo past 71
EthanNad Al Shiba First 63.7% 30 Jun 2026 4 mo past 48
Vitalia by PinnaclePalm Jumeirah 12.3% 30 Jun 2026 4 mo past 45
Ava At Palm Jumeirah By OmniyatPalm Jumeirah 95.9% 30 Jun 2026 4 mo past 17
The Waterside Villas By EllingtonWadi Al Safa 3 45% 30 Jun 2026 4 mo past 17
Lime Light Twin TowersAl Hebiah Fourth 71.1% 30 Jun 2026 4 mo past 734
Jouri HillsMe'Aisem First 78.5% 30 Jun 2026 4 mo past 154
Vayla ResidencesPalm Deira 22.1% 14 Jul 2026 3 mo past 53
Living Legends Phase 6Wadi Al Safa 3 76.7% 16 Jul 2026 3 mo past 648
AlayaAl Hebiah Fourth 91.5% 20 Jul 2026 3 mo past —
Cavara CentralAl Satwa 43.1% 23 Jul 2026 3 mo past 166
The Fifth TowerAl Barsha South Fourth 50.3% 24 Jul 2026 3 mo past 345
Aveline Residences by Citi DevelopersAl Barsha South Fourth 42.2% 26 Jul 2026 3 mo past 265
Bling Avenue 1Madinat Al Mataar 68.3% 28 Jul 2026 3 mo past 40
RYAH LIVING by ALYAKKAAl Hebiah Second 54.1% 30 Jul 2026 3 mo past 128
Views VII by Golden WoodsMadinat Al Mataar 90.4% 30 Jul 2026 3 mo past 68
Brand CentroAl Satwa 90% 30 Jul 2026 3 mo past 56
The Orchard PlaceAl Barsha South Fourth 42.7% 31 Jul 2026 3 mo past 418
Miami By SdAl Barsha South Fifth 71.3% 31 Jul 2026 3 mo past 115
Sls Residences At Palm JumeirahPalm Jumeirah 60% 31 Jul 2026 3 mo past 114
Tomorrow Commercial TowerAl Warsan First 70% 31 Jul 2026 3 mo past 133
Jardin AstralAl Satwa 45.1% 1 Aug 2026 3 mo past 44
Queen's GardenNad Al Shiba First 42.2% 1 Aug 2026 3 mo past 77
Mayfair Gardens By MajidAl Satwa 70.1% 14 Aug 2026 2 mo past 64
Iluka ResidencesPalm Deira 57.2% 15 Aug 2026 2 mo past 57
Weybridge Gardens 3Wadi Al Safa 5 23.9% 20 Aug 2026 2 mo past 208
Cove Edition Residence 1 By ImtiazWadi Al Safa 5 90.2% 25 Aug 2026 2 mo past 182
Evora ResidencesJabal Ali First 20.5% 29 Aug 2026 2 mo past 77
Cavara CircleAl Barsha South Fourth 51.5% 30 Aug 2026 2 mo past 71
The Lakeview Villas By EllingtonWadi Al Safa 3 20.1% 30 Aug 2026 2 mo past 22
Binghatti SkyhallBusiness Bay 31.1% 31 Aug 2026 2 mo past 728
Belle Reve By ZimayaAl Barsha South Fourth 80.5% 31 Aug 2026 2 mo past 190
Edgewater Residences 2Palm Deira 54.7% 31 Aug 2026 2 mo past 97
The Beachfront Villas By EllingtonWadi Al Safa 3 47.4% 31 Aug 2026 2 mo past 21
Sereno ResidencesAl Barsha South Fourth 22.4% 1 Sep 2026 2 mo past 94
77 Boulevard by BamAl Barsha South Fourth 18% 10 Sep 2026 1 mo past 58
Myra OnyxNad Al Hamar 85.9% 12 Sep 2026 1 mo past 60
Havelock HeightsAl Barsha South Fourth 40% 15 Sep 2026 — 156
Koyo Residence by Fuji PropertiesWadi Al Safa 3 30.7% 15 Sep 2026 1 mo past 44
Kyoto By ORO24Al Barshaa South Third 17% 20 Sep 2026 1 mo past 708
Project 4595, Madinat Al MataarMadinat Al Mataar 0% 22 Sep 2026 — 60
Mangrove 2Wadi Al Safa 3 37.8% 23 Sep 2026 1 mo past 18
Nova TowerAl Barshaa South Second 40.1% 26 Sep 2026 1 mo past 134
Cresswell PlazaMadinat Al Mataar 60.1% 28 Sep 2026 1 mo past 35
Oasis LoftNadd Hessa 50.1% 30 Sep 2026 1 mo past 164
Ag SquareWadi Al Safa 5 68.8% 30 Sep 2026 1 mo past 372
City Center ResidencesBurj Khalifa 72.3% 30 Sep 2026 1 mo past 384
Minati Homes 1Jabal Ali First 51.2% 30 Sep 2026 1 mo past 82
Exotica by Al MarinaAl Barsha South Fourth 41.1% 30 Sep 2026 1 mo past 93
Lincoln Star ResidenceMadinat Al Mataar 47.2% 30 Sep 2026 1 mo past 48
VOI Residence by HVM LivingMadinat Al Mataar 15.6% 30 Sep 2026 1 mo past 68
Natuzzi Harmony Residences by Peace HomesPalm Deira 43.7% 30 Sep 2026 1 mo past 50
Ocean TowerPalm Deira 30.3% 30 Sep 2026 1 mo past 165
Lanai IslandAl Hebiah Fourth 60.6% 30 Sep 2026 1 mo past —
Vue by Crystal BayAl Barsha South Fourth 68.2% 1 Oct 2026 1 mo past 176
Stellar Axis by Ajmal Estate DevelopersWarsan Fourth 26.7% 1 Oct 2026 1 mo past 122
Hearth Heights by Enawt Real Estate DevelopmentAl Barsha South Fourth 29.1% 1 Oct 2026 1 mo past 142
Project 3345, Al Barsha South FourthAl Barsha South Fourth 13% 1 Oct 2026 — —
MonarchAl Hebiah First 32.3% 1 Oct 2026 1 mo past 47
Hatimi Residences By FakhruddinPalm Deira 50.8% 2 Oct 2026 under 1 mo past 116
Central Park PlazaAl Wasl 43.7% 8 Oct 2026 under 1 mo past 212
The SereneMadinat Al Mataar 46.3% 13 Oct 2026 under 1 mo past 106
Golden Wood Views 5Al Barsha South Fourth 89.1% 14 Oct 2026 under 1 mo past 161
Cove Edition Residence 2 By ImtiazWadi Al Safa 5 60.1% 15 Oct 2026 under 1 mo past 260
Luminar Tower 1Al Barsha South Fifth 33.1% 15 Oct 2026 under 1 mo past 200
Stamn OneAl Satwa 42.1% 15 Oct 2026 under 1 mo past 77
Samha Residence 2Al Barsha South Fourth 52.1% 15 Oct 2026 under 1 mo past 175
Bay Residences Dubai IslandsPalm Deira 47.9% 15 Oct 2026 under 1 mo past 292
Almaara ResidencesJabal Ali First 65.5% 16 Oct 2026 under 1 mo past 59
Pure TownAl Barsha South Fourth 0% 22 Oct 2026 — 13
Luminar Tower 2Al Barsha South Fifth 30.8% 27 Oct 2026 under 1 mo past 168
Capital Horizon TerracesPalm Deira 4.4% 30 Oct 2026 under 1 mo past 63
Project 3813, Al Barsha South FourthAl Barsha South Fourth 31% 30 Oct 2026 — —
Binghatti AquariseBusiness Bay 21% 31 Oct 2026 under 1 mo past 1,592
A 99Wadi Al Safa 5 47.8% 31 Oct 2026 under 1 mo past 90
Mar CasaMadinat Dubai Almelaheyah 56.5% 31 Oct 2026 under 1 mo past 585
Soho The BerkeleyHadaeq Sheikh Mohammed Bin Rashid 46% 31 Oct 2026 under 1 mo past 129
California 2 by SDJabal Ali First 33.7% 31 Oct 2026 under 1 mo past 155
Whitestone ResidenceAl Satwa 3% 31 Oct 2026 under 1 mo past 47
Ag CentralWadi Al Safa 5 58.7% 31 Oct 2026 under 1 mo past 96
High Best TowerWadi Al Safa 3 90.6% 1 Nov 2026 under 1 mo past 88
Aura PrestigeNadd Hessa 40.1% 1 Nov 2026 under 1 mo past 81
Manhattan 2 by SDAl Barsha South Fourth 21.2% 1 Nov 2026 under 1 mo past 193
MAS Barsha ResidencyAl Barsha First 26.3% 21 Nov 2026 0 mo to go 242
The Vyne ResidencesAl Barsha South Fifth 80.4% 25 Nov 2026 0 mo to go 263
ElaraUm Suqaim Third 64.3% 25 Nov 2026 0 mo to go 238
Vivid TowerAl Barsha South Fifth 12.3% 30 Nov 2026 0 mo to go 147
SeascapeMadinat Dubai Almelaheyah 79.1% 30 Nov 2026 0 mo to go 395
Sea Legend One By Mvs Real EstatePalm Deira 22.2% 30 Nov 2026 0 mo to go 65
Mallside ResidenceHadaeq Sheikh Mohammed Bin Rashid 83.4% 30 Nov 2026 0 mo to go 148
Damac Hills - Gems Estates 1Al Hebiah Third 48.8% 30 Nov 2026 0 mo to go —
One BeverlyAl Barshaa South Third 72.9% 1 Dec 2026 1 mo to go 389
Trinity By KarmaAl Barshaa South Third 30.9% 1 Dec 2026 1 mo to go 309
The Eighty ThreeMadinat Al Mataar 60% 14 Dec 2026 1 mo to go 70
Bliss TowerWadi Al Safa 5 92.5% 15 Dec 2026 1 mo to go 131
Tavora Residences By Jhk Heights Real Estate DevelopmentWarsan Fourth 86.2% 15 Dec 2026 1 mo to go 95
Luxur Tower By ImtiazAl Barsha South Fourth 90% 15 Dec 2026 1 mo to go 361
Bhuvi ResidenceMadinat Al Mataar 31.6% 15 Dec 2026 1 mo to go 70
Sapphire 32 by Dar AlkaramaAl Barsha South Fourth 62.3% 15 Dec 2026 1 mo to go 232
Lusin Residences by Ermax DevelopmentAl Warsan First 35% 15 Dec 2026 1 mo to go 57
Rose Mirage 1Madinat Al Mataar 0% 20 Dec 2026 1 mo to go 64
Olivia ResidencesDubai Investment Park First 38.2% 24 Dec 2026 1 mo to go 231
The St. Regis Residences, Downtown DubaiBurj Khalifa 76.1% 25 Dec 2026 1 mo to go 1,108
Cove Edition Residence 3 By ImtiazWadi Al Safa 5 44% 25 Dec 2026 1 mo to go 260
Eden HillsHadaeq Sheikh Mohammed Bin Rashid 3.5% 25 Dec 2026 1 mo to go 281
Beach Walk Grand By ImtiazPalm Deira 53.2% 25 Dec 2026 1 mo to go 112
Seaside by Prestige OnePalm Deira 43% 25 Dec 2026 1 mo to go 121
Sunset Bay One By ImtiazPalm Deira 78% 25 Dec 2026 1 mo to go 66
Zenith Tower J1Al Barsha South Fourth 72.2% 25 Dec 2026 1 mo to go 76
Laya CourtyardAl Hebiah Second 50.6% 26 Dec 2026 1 mo to go 289
Baccarat Hotel and Residences, DubaiBurj Khalifa 21.2% 29 Dec 2026 1 mo to go 98
Evergrin House 2Al Satwa 10.3% 30 Dec 2026 1 mo to go 193
Al Haseen Residence 4Saih Shuaib 2 11.8% 30 Dec 2026 1 mo to go 248
Beachfront Gates 2Madinat Al Mataar 41.7% 30 Dec 2026 1 mo to go 162
Val By KascoAl Jadaf 72.6% 30 Dec 2026 1 mo to go 134
Reef 1000Wadi Al Safa 5 67.2% 30 Dec 2026 1 mo to go 126
Cresswell ViewsMadinat Al Mataar 60.2% 30 Dec 2026 1 mo to go 56
Liv LuxMarsa Dubai 87.1% 30 Dec 2026 1 mo to go 229
Verdania 3Wadi Al Safa 5 0% 30 Dec 2026 1 mo to go 142
Beachfront Gates 1Madinat Al Mataar 36.3% 30 Dec 2026 1 mo to go 74
Unique OneMadinat Al Mataar 0% 30 Dec 2026 1 mo to go 43
Project 4311, Warsan FourthWarsan Fourth 30% 30 Dec 2026 1 mo to go —
Binghatti SkyriseBusiness Bay 35.9% 31 Dec 2026 1 mo to go 3,358
Al Habtoor TowerBusiness Bay 90% 31 Dec 2026 1 mo to go 1,739
Binghatti HillcrestAl Barshaa South Third 60% 31 Dec 2026 1 mo to go 396
Lazord By LapisWadi Al Safa 3 27.6% 31 Dec 2026 1 mo to go 313
Tonino Lamborghini ResidencesNad Al Shiba First 60% 31 Dec 2026 1 mo to go 553
Verano By PrescottAl Hebiah Second 41.1% 31 Dec 2026 1 mo to go 269
Havelock ResidencesJabal Ali First 11.4% 31 Dec 2026 1 mo to go 230
Empire EstatesAl Barshaa South Third 60% 31 Dec 2026 1 mo to go 344
The Haven IIWadi Al Safa 3 56.3% 31 Dec 2026 1 mo to go 225
Reem by visionWadi Al Safa 2 70.4% 31 Dec 2026 1 mo to go 200
The PierMadinat Dubai Almelaheyah 48.4% 31 Dec 2026 1 mo to go 282
Soul by visionMe'Aisem First 77% 31 Dec 2026 1 mo to go 176
BiancaWadi Al Safa 2 56.1% 31 Dec 2026 1 mo to go 653
171 Garden HeightsAl Satwa 33.7% 31 Dec 2026 1 mo to go 159
Royal Regency SuitesBusiness Bay 56.2% 31 Dec 2026 1 mo to go 238
La BoutiqueAl Jadaf 52.5% 31 Dec 2026 1 mo to go 119
Canal HeightsBusiness Bay 36.3% 31 Dec 2026 1 mo to go 415
Moonsa Residences 2Warsan Fourth 1% 31 Dec 2026 1 mo to go 125
Marina ShoresMarsa Dubai 87.2% 31 Dec 2026 1 mo to go 447
Address The BayMarsa Dubai 70.1% 31 Dec 2026 1 mo to go 448
Mercedes-Benz Places | BinghattiBurj Khalifa 65.3% 31 Dec 2026 1 mo to go 163
Sunbliss Residences by Purvanchal Real Estate DevelopersJabal Ali First 32.4% 31 Dec 2026 1 mo to go 99
Bonds Avenue ResidencesPalm Deira 6.9% 31 Dec 2026 1 mo to go 75
Ocean Pearl By SDPalm Deira 25.1% 31 Dec 2026 1 mo to go 100
Palm Beach Towers - 2Palm Jumeirah 81.6% 31 Dec 2026 1 mo to go 321
The Cube Quarter ResidencesWadi Al Safa 3 57% 31 Dec 2026 1 mo to go 54
Palm Beach Towers -3Palm Jumeirah 74.3% 31 Dec 2026 1 mo to go 460
Palm Beach Towers -1Palm Jumeirah 82.8% 31 Dec 2026 1 mo to go 284
Sukoon by NuriNad Al Shiba First 46.8% 31 Dec 2026 1 mo to go 41
Hillmont Residences By EllingtonAl Barsha South Fourth 26.3% 31 Dec 2026 1 mo to go 145
Numa ReserveWadi Al Safa 3 10.3% 31 Dec 2026 1 mo to go 35
Livel ResidenzaAl Barsha South Fourth 20% 31 Dec 2026 1 mo to go 137
Wadi Villas by AristaWadi Al Safa 3 60.4% 31 Dec 2026 1 mo to go 30
Vita Grande By MeteoraAl Barsha South Fourth 63.8% 31 Dec 2026 1 mo to go 121
Orla By OmniyatPalm Jumeirah 70% 31 Dec 2026 1 mo to go 90
Lateral OneWadi Al Safa 5 72.1% 31 Dec 2026 1 mo to go 40
Vio ResidencesWarsan Fourth 6.4% 31 Dec 2026 1 mo to go 87
Mira Villas designed by Bentley HomeWadi Al Safa 3 31.8% 31 Dec 2026 1 mo to go 36
Greenfield LivingMadinat Al Mataar 33.3% 31 Dec 2026 1 mo to go 52
Cresswell HomesMadinat Al Mataar 28.9% 31 Dec 2026 1 mo to go 70
The MelgranoJumeirah Second 42.8% 31 Dec 2026 1 mo to go 14
18 Marlow RowAl Barsha South Fourth 51.9% 31 Dec 2026 1 mo to go 18
Fairway Villas 2Madinat Al Mataar 92.2% 31 Dec 2026 1 mo to go —
Golf TerracesMe'Aisem First 0% 31 Dec 2026 1 mo to go 60
Project 459, Al Thanyah FifthAl Thanyah Fifth 0% 31 Dec 2026 1 mo to go —

Months counted from the register date. Source: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026.

Completed63 projects with a 2026 DLD end date, marked completed by DLD

63 projects with a 2026 DLD end date, marked completed by DLD
ProjectAreaDLD end dateCompletedAgainst the end date Units
Volante 2Business Bay 2 Jan 2026 30 Sep 2025 3 mo before 52
LamaaUm Suqaim Third 27 Jan 2026 16 Jul 2026 5 mo after 372
FH ResidencyAl Barsha South Fifth 30 Jan 2026 6 Jul 2026 5 mo after 297
Koro OneAl Satwa 31 Jan 2026 24 Apr 2026 2 mo after 147
Mudon Al Ranim 3Al Hebiah Sixth 31 Jan 2026 1 Sep 2025 4 mo before 242
Altai TowerAl Barsha South Fifth 31 Jan 2026 21 Oct 2026 8 mo after 240
Peninsula FourBusiness Bay 1 Feb 2026 25 Jun 2026 4 mo after 1,038
Mag 330Wadi Al Safa 4 1 Feb 2026 14 May 2026 3 mo after 654
Celine By VisionWadi Al Safa 2 1 Feb 2026 22 Jan 2026 1 wk before 104
NAS3Al Barshaa South Third 1 Feb 2026 8 Apr 2026 2 mo after 288
ZaZEN IvyJabal Ali First 1 Feb 2026 11 May 2026 3 mo after 73
Royal RegencyBusiness Bay 28 Feb 2026 5 Nov 2025 3 mo before 165
VybBusiness Bay 28 Feb 2026 23 Jun 2026 3 mo after 181
Elegance TowerBurj Khalifa 28 Feb 2026 17 Sep 2026 6 mo after 296
Milestone ResidencesAl Barsha South Fifth 13 Mar 2026 5 Feb 2026 1 mo before 53
FernAl Wasl 21 Mar 2026 5 Oct 2026 6 mo after 214
Azizi Riviera 69Al Merkadh 30 Mar 2026 28 Nov 2025 4 mo before 123
Binghatti GhostAl Jadaf 31 Mar 2026 23 Sep 2026 5 mo after 785
Binghatti GroveAl Barsha South Fourth 31 Mar 2026 1 Oct 2026 6 mo after 404
Creek PalaceAl Khairan First 31 Mar 2026 31 Mar 2026 On the end date 337
Elbrus TowerAl Barsha South Fifth 31 Mar 2026 3 Sep 2026 5 mo after 270
Lilium TowerAl Barsha South Fifth 31 Mar 2026 1 Oct 2026 6 mo after 266
Lime GardensHadaeq Sheikh Mohammed Bin Rashid 31 Mar 2026 10 Sep 2025 6 mo before 293
Park Lane 2 By HeilbronnAl Barsha South Fourth 31 Mar 2026 13 Feb 2026 1 mo before 83
The Veranda Collection 2Al Barsha South Fourth 7 Apr 2026 4 Aug 2026 3 mo after 13
Binghatti ApexAl Barsha South Fourth 30 Apr 2026 23 Apr 2026 1 wk before 552
Hills ParkHadaeq Sheikh Mohammed Bin Rashid 30 Apr 2026 28 Oct 2025 6 mo before 450
JomanaUm Suqaim Third 30 Apr 2026 8 Sep 2026 4 mo after 326
Celia gardensNad Al Shiba First 15 May 2026 21 Sep 2026 4 mo after 44
Mudon Al Ranim 4Al Hebiah Sixth 31 May 2026 19 Jan 2026 4 mo before 134
Volna By KascoAl Jadaf 31 May 2026 22 Apr 2026 1 mo before 71
Beach Walk Residences 1Palm Deira 1 Jun 2026 19 May 2026 1 wk before 76
Sobha Hartland - Crest GrandeAl Merkadh 30 Jun 2026 15 Apr 2026 2 mo before 985
Condor Golf Links 18Al Hebiah Fourth 30 Jun 2026 19 Jan 2026 5 mo before 256
Tulip Oasis 10Wadi Al Safa 3 30 Jun 2026 29 Jun 2026 1 d before 130
Arabian Ranches lll - RayaWadi Al Safa 5 30 Jun 2026 29 Dec 2025 6 mo before 240
Address HillcrestHadaeq Sheikh Mohammed Bin Rashid 30 Jun 2026 30 Oct 2025 8 mo before —
Mudon Al Ranim 6Al Hebiah Sixth 30 Jul 2026 16 Jul 2026 2 wk before 242
Creek Beach - Savanna-Cedar-MangroveAl Khairan First 31 Jul 2026 7 Nov 2025 8 mo before 595
Solcasa ResidenceNad Al Shiba First 1 Aug 2026 21 Oct 2026 2 mo after 58
Pearl House III by ImtiazAl Barsha South Fourth 1 Aug 2026 26 Apr 2026 3 mo before 165
Sports View Residence By Al Helal Al ZahabyWarsan Fourth 4 Aug 2026 22 Jul 2026 1 wk before 124
ErinAl Wasl 10 Aug 2026 12 Jun 2026 1 mo before 200
Beach Walk Residences 2Palm Deira 10 Aug 2026 10 Aug 2026 On the end date 63
Valores ResidencesJabal Ali First 31 Aug 2026 28 Oct 2026 1 mo after 90
The Valley - Farm GardensAl Yufrah 1 31 Aug 2026 6 Apr 2026 4 mo before —
Gharbi I ResidencesAl Barshaa South Third 14 Sep 2026 21 Sep 2026 1 wk after 170
The Valley - EloraAl Yufrah 1 30 Sep 2026 13 Mar 2026 6 mo before 430
Mohammed Bin Rashid Al Maktoum City, District 11- Opal GardensWadi Al Safa 3 30 Sep 2026 21 Jul 2026 2 mo before 435
Park HorizonHadaeq Sheikh Mohammed Bin Rashid 30 Sep 2026 6 Oct 2025 11 mo before 306
Sobha Hartland Waves OpulenceAl Merkadh 30 Sep 2026 6 Aug 2026 1 mo before 363
Mudon Al Ranim 7Al Hebiah Sixth 30 Sep 2026 17 Sep 2026 1 wk before 248
Mudon Al Ranim 8Al Hebiah Sixth 30 Sep 2026 17 Sep 2026 1 wk before 228
Skyhills I by HREAl Barshaa South Second 1 Oct 2026 16 Jul 2026 2 mo before 1,145
The EDGEBusiness Bay 11 Oct 2026 27 Aug 2026 1 mo before 1,030
Arabian Ranches lll - AnyaWadi Al Safa 5 31 Oct 2026 9 Oct 2026 3 wk before 492
Creek Beach - Canopy - MoorAl Khairan First 30 Nov 2026 7 Nov 2025 12 mo before 444
Golf Residences by FortimoHadaeq Sheikh Mohammed Bin Rashid 15 Dec 2026 7 Jun 2026 6 mo before 200
Arabian Ranches lll - Anya 2Wadi Al Safa 5 30 Dec 2026 9 Oct 2026 2 mo before 362
ElviraHadaeq Sheikh Mohammed Bin Rashid 31 Dec 2026 1 Jul 2026 5 mo before 902
The Cove llAl Khairan First 31 Dec 2026 6 May 2026 7 mo before 806
Golf HeightsAl Thanyah Third 31 Dec 2026 18 Jun 2026 6 mo before 281
Beachgate by AddressMarsa Dubai 31 Dec 2026 22 Sep 2026 3 mo before 252

Completed: the completion date DLD records for the project. Source: DLD projects register, export of 1 November 2026.

Months of 2026

Other years: 2025 · 2027

Data: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026. The DLD end date is the date registered with DLD; your SPA may give another. Methodology