Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

Dubai off-plan handovers in 2028 448 projects registered to end in 2028 · 0 completed · 264 under construction DLD projects register as of 1 November 2026 · sales to 5 November 2026

448 projects in the Dubai Land Department projects register have an end date in 2028. As of 1 November 2026, 0 are completed, 264 are under construction and 184 have not started. 0 of those under construction are past their DLD end date. These are the DLD end dates registered for each project, not handover forecasts.

Registered to end in 2028
448
projects · 112,428 units not yet completed
Completed
0
marked completed by DLD
Under construction
264
264 with the end date to come
Not started
184
Not yet active on the DLD register
Under construction, past end date
0
of 264 under construction

Source: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026.

DLD end dates by month

448 projects

Columns link to their monthly pages. Source: DLD projects register, export of 1 November 2026.

% built where the end date is still to come

264 projects

Projects under construction with a DLD end date later in 2028

0–24%: 22625–49%: 2550–74%: 1275–100%: 1

% built from the latest register reading. Source: DLD projects register, export of 1 November 2026.

DLD can change a project’s end date; the dates here are those in the latest export. In most completed projects the end date in the register equals the completion date, so a completed project counted here may have had a different end date before.

Not yet completed (448)448 projects with a 2028 DLD end date, by sales over 24 months

448 projects with a 2028 DLD end date, by sales over 24 months
ProjectArea Built DLD end dateTo DLD end date Units
Vivanti Residences by MeteoraAl Barsha South Fourth 0% 1 Jan 2028 14 mo to go 476
Kyomi ResidenceWarsan Fourth 0% 1 Jan 2028 14 mo to go 121
LioraPalm Deira 0% 1 Jan 2028 14 mo to go 56
Golf Grove by RegentMe'Aisem First 8.7% 2 Jan 2028 14 mo to go 98
Dubai Harbour Residences (Area 1)Marsa Dubai 30.3% 14 Jan 2028 14 mo to go 217
AugustaAl Yelayiss 2 5.3% 14 Jan 2028 14 mo to go 154
Dubai Harbour Residences (Area 3)Marsa Dubai 34.8% 14 Jan 2028 14 mo to go 159
Raffi By AziziJabal Ali First 2% 15 Jan 2028 14 mo to go 171
Arian By AziziJabal Ali Industrial Second 2% 16 Jan 2028 14 mo to go 631
Palm Jebel Ali - Frond APalm Jabal Ali 11.1% 17 Jan 2028 14 mo to go —
Palm Jebel Ali - Frond FPalm Jabal Ali 11.8% 17 Jan 2028 14 mo to go —
Palm Jebel Ali - Frond DPalm Jabal Ali 8.7% 17 Jan 2028 14 mo to go —
Palm Jebel Ali - Frond EPalm Jabal Ali 9.2% 17 Jan 2028 14 mo to go —
Palm Jebel Ali - Frond BPalm Jabal Ali 10% 17 Jan 2028 14 mo to go —
Palm Jebel Ali - Frond CPalm Jabal Ali 8.6% 17 Jan 2028 14 mo to go —
Flora IslePalm Deira 11.3% 18 Jan 2028 14 mo to go 251
Project 3883, Warsan FourthWarsan Fourth 0% 19 Jan 2028 14 mo to go —
Azizi RubyAl Barsha South Fourth 3% 23 Jan 2028 14 mo to go 264
Wellington Grand VillasWadi Al Safa 3 62.1% 24 Jan 2028 14 mo to go 22
Ajwan ResidencesMadinat Al Mataar 10% 27 Jan 2028 14 mo to go 122
Rose Gold Residences by Zee DevelopmentAl Barsha South Fourth 0% 30 Jan 2028 14 mo to go 175
Parkway By Prestige OneBukadra 10.9% 31 Jan 2028 14 mo to go 274
Wadi Hills by HREWadi Al Safa 5 7.7% 31 Jan 2028 14 mo to go 131
The First Collection at Dubai Studio CityAl Hebiah Second 31.9% 31 Jan 2028 14 mo to go 379
Wasl by AziziPalm Deira 2% 12 Feb 2028 15 mo to go 227
Azizi EmeraldUm Hurair Second 3% 13 Feb 2028 15 mo to go 102
Nad Al Sheba Gardens Phase 7Nad Al Shiba First 4% 15 Feb 2028 15 mo to go 272
Sunset Bay Grand By ImtiazPalm Deira 16.3% 15 Feb 2028 15 mo to go 98
ElmoraAl Satwa 0% 15 Feb 2028 15 mo to go 85
Art House Private Residences By VivaWadi Al Safa 3 0% 15 Feb 2028 15 mo to go 121
Nanma LotusMadinat Al Mataar 3.6% 15 Feb 2028 15 mo to go 79
Project 4431, Al Barshaa South ThirdAl Barshaa South Third 0% 15 Feb 2028 15 mo to go —
Golf Residences By Prestige OneAl Hebiah Fourth 35.7% 16 Feb 2028 15 mo to go 226
Project 4343, Palm DeiraPalm Deira 0% 20 Feb 2028 15 mo to go —
Damac Lagoons - ValenciaAl Hebiah Fifth 5.2% 28 Feb 2028 15 mo to go 1,558
Samana IBIZAWadi Al Safa 5 5.5% 28 Feb 2028 15 mo to go 455
IconicAl Safouh Second 34.9% 28 Feb 2028 15 mo to go 319
Mada'inMarsa Dubai 0% 28 Feb 2028 15 mo to go 214
Sky Gate TowerAl Barsha South Fifth 4.7% 29 Feb 2028 15 mo to go 431
Pearl House Iv By ImtiazAl Barsha South Fourth 17.9% 29 Feb 2028 15 mo to go 211
Ventana ResidencesWarsan Fourth 6.7% 29 Feb 2028 15 mo to go 127
Project 3413, Wadi Al Safa 5Wadi Al Safa 5 0% 29 Feb 2028 15 mo to go —
Mia TowerBukadra 0% 29 Feb 2028 15 mo to go 210
Zenith ResidencesWarsan Fourth 24.1% 1 Mar 2028 16 mo to go 267
Rabdan GardensAl Satwa 0% 1 Mar 2028 16 mo to go 90
Rabdan SquareNad Al Shiba First 1.2% 1 Mar 2028 16 mo to go 36
Renascent TowerWadi Al Safa 3 1.9% 1 Mar 2028 16 mo to go 52
Project 4596, Me'Aisem FirstMe'Aisem First 0% 1 Mar 2028 16 mo to go —
Project 4049, Wadi Al Safa 2Wadi Al Safa 2 0% 3 Mar 2028 16 mo to go —
Azizi WaresJabal Ali Industrial Second 2% 4 Mar 2028 16 mo to go 336
Villa del Garda ResidencesPalm Deira 0% 4 Mar 2028 16 mo to go 134
Bay Grove Residences, Dubai IslandsPalm Deira 12.3% 15 Mar 2028 16 mo to go 296
AVENEW888 - ModoMadinat Al Mataar 21.2% 15 Mar 2028 16 mo to go 224
Helvetia MarinePalm Deira 0% 15 Mar 2028 16 mo to go 63
At 85 ResidencesJabal Ali First 0% 15 Mar 2028 16 mo to go 261
AxillaAl Satwa 0% 20 Mar 2028 16 mo to go 54
The Orchard Place- Towers D&EAl Barsha South Fourth 0.8% 21 Mar 2028 16 mo to go 400
Maison Margiela ResidencesPalm Jumeirah 6.4% 27 Mar 2028 16 mo to go 25
One Sky Park By ImanAl Barsha South Fourth 21.7% 30 Mar 2028 16 mo to go 584
Essenlife ResidenceAl Barsha South Fifth 7.2% 30 Mar 2028 16 mo to go 357
Berkeley Square by Prestige OneAl Barsha South Fourth 3% 30 Mar 2028 16 mo to go 241
Holm OneAl Satwa 17.7% 30 Mar 2028 16 mo to go 218
Haven By Aldar 3Wadi Al Safa 5 68.9% 30 Mar 2028 16 mo to go 292
Aurelia ResidenceAl Hebiah Fourth 4.5% 30 Mar 2028 16 mo to go 280
Tresora by WadanAl Barsha South Fourth 0% 30 Mar 2028 16 mo to go 160
997 Residences by Reef Luxury DevelopmentPalm Deira 4.9% 30 Mar 2028 16 mo to go 63
Zyra HillsWarsan Fourth 0% 30 Mar 2028 16 mo to go 81
DAMAC Sun CityAl Yelayiss 1 36.5% 30 Mar 2028 16 mo to go —
Bearys WafiraUm Hurair Second 0% 30 Mar 2028 16 mo to go 90
Project 4383, Palm DeiraPalm Deira 0% 30 Mar 2028 16 mo to go —
Rove Home Dubai MarinaMarsa Dubai 7.8% 31 Mar 2028 16 mo to go 682
Samana Barari LagoonsWadi Al Safa 3 16.5% 31 Mar 2028 16 mo to go 601
Expo City Sidr ResidencesMadinat Al Mataar 25% 31 Mar 2028 16 mo to go 443
The central downtownAl Barshaa South Third 10.5% 31 Mar 2028 16 mo to go 1,254
StaxAl Barsha South Fourth 4.5% 31 Mar 2028 16 mo to go 530
AVENEW888-LOOMMadinat Al Mataar 1.6% 31 Mar 2028 16 mo to go 661
SerenovaNadd Hessa 1.6% 31 Mar 2028 16 mo to go 222
GREYGATE RESIDENCES by ADEAl Barsha South Fourth 10.9% 31 Mar 2028 16 mo to go 228
Gate Eleven ResidencesWadi Al Safa 3 30.6% 31 Mar 2028 16 mo to go 189
SeapointMarsa Dubai 36.8% 31 Mar 2028 16 mo to go 674
CamdenAl Yelayiss 2 7.2% 31 Mar 2028 16 mo to go 168
Divine Al BarariWadi Al Safa 3 20.3% 31 Mar 2028 16 mo to go 291
Belle Vie By ZimayaNadd Hessa 11% 31 Mar 2028 16 mo to go 116
The BoroughAl Barsha South Fourth 5.5% 31 Mar 2028 16 mo to go 157
The Watercrest By EllingtonWadi Al Safa 3 2.2% 31 Mar 2028 16 mo to go 84
Elanora by zoyaSaih Shuaib 2 0% 31 Mar 2028 16 mo to go 117
The Alba Residences by OmniyatPalm Jumeirah 8.4% 31 Mar 2028 16 mo to go 165
Stories By MirfaMadinat Al Mataar 0.5% 31 Mar 2028 16 mo to go 100
The CollectiveMadinat Al Mataar 5.7% 31 Mar 2028 16 mo to go 94
Ayaan Heights IBukadra 20.3% 31 Mar 2028 16 mo to go 130
Barari Parks By BahatWadi Al Safa 3 0.9% 31 Mar 2028 16 mo to go 52
Vedaire ResidencesNad Al Shiba First 0% 31 Mar 2028 16 mo to go 46
HavenciaWadi Al Safa 5 0% 31 Mar 2028 16 mo to go 286
Blossom 40Wadi Al Safa 3 0% 31 Mar 2028 16 mo to go 66
Taraf 3 ResidenceAl Barsha South Fourth 6.9% 31 Mar 2028 16 mo to go 151
Isla Residences by Chaimaa HoldingPalm Deira 0% 31 Mar 2028 16 mo to go 76
Residence 71Madinat Al Mataar 8.7% 31 Mar 2028 16 mo to go 43
California ResidencesWadi Al Safa 4 1.7% 1 Apr 2028 17 mo to go 372
Sera Gardens by VisionMe'Aisem First 0% 1 Apr 2028 17 mo to go 246
Lilian ResidencesMadinat Al Mataar 4.7% 1 Apr 2028 17 mo to go 66
Arlington Park Ii By MajidWadi Al Safa 5 0% 1 Apr 2028 17 mo to go 129
Project 4406, Warsan FourthWarsan Fourth 0% 1 Apr 2028 17 mo to go —
LuminaUm Hurair Second 11.4% 1 Apr 2028 17 mo to go 24
Oleander Residences by yooPalm Deira 2.5% 1 Apr 2028 17 mo to go 42
SianaSaih Shuaib 2 0% 4 Apr 2028 17 mo to go 98
Project 3652, Wadi Al Safa 3Wadi Al Safa 3 0% 5 Apr 2028 17 mo to go —
Bay Grove Residences C - Dubai IslandsPalm Deira 7.3% 10 Apr 2028 17 mo to go 360
Confident PrestonWadi Al Safa 2 0% 14 Apr 2028 17 mo to go 99
Nexara TowerAl Barsha South Fourth 20% 16 Apr 2028 17 mo to go 187
AD ResidencesAl Satwa 6.4% 17 Apr 2028 17 mo to go 140
Admire HeightsAl Barsha South Fifth 20% 24 Apr 2028 17 mo to go 78
J188Al Jadaf 0% 30 Apr 2028 17 mo to go 130
Palace Residences Dubai Hills EstateHadaeq Sheikh Mohammed Bin Rashid 50.7% 30 Apr 2028 17 mo to go 962
Sobha Seahaven Tower AMarsa Dubai 37% 30 Apr 2028 17 mo to go 333
Veda by AUM One Real Estate DevelopmentAl Barsha South Fourth 3.1% 30 Apr 2028 17 mo to go 69
The Tides By AmisPalm Deira 0% 30 Apr 2028 17 mo to go 83
Maravea ResidencesPalm Deira 0% 30 Apr 2028 17 mo to go 63
Project 4420, Wadi Al Safa 3Wadi Al Safa 3 0% 30 Apr 2028 17 mo to go —
SkyonMadinat Al Mataar 0% 30 Apr 2028 17 mo to go 52
Project 4575, Al JadafAl Jadaf 0% 30 Apr 2028 17 mo to go —
Longford Residences by Devan Real Estate DevelopmentAl Warsan First 32.7% 1 May 2028 18 mo to go 280
Vista Hub by DSI Prestige OneWadi Al Safa 3 0% 1 May 2028 18 mo to go 58
Project 4599, Palm DeiraPalm Deira 0% 1 May 2028 18 mo to go —
Project 4339, Jabal Ali FirstJabal Ali First 5% 1 May 2028 18 mo to go —
Project 4452, Al Barsha South FourthAl Barsha South Fourth 0% 1 May 2028 18 mo to go —
The Acres 2 & Estates 2Wadi Al Safa 7 14.9% 3 May 2028 18 mo to go —
ArmasMadinat Al Mataar 20.1% 14 May 2028 18 mo to go 64
Samana Hills SouthSaih Shuaib 2 12.1% 15 May 2028 18 mo to go 510
The Caden By PrescottBukadra 0.5% 15 May 2028 18 mo to go 229
Coventry 49Madinat Al Mataar 0% 15 May 2028 18 mo to go 51
Celestara ResidencesAl Barsha South Fourth 3.1% 19 May 2028 18 mo to go 121
LiaPalm Deira 4.1% 20 May 2028 18 mo to go 82
Samana ResortsMe'Aisem First 5.9% 30 May 2028 18 mo to go 969
Hayat 3Madinat Al Mataar 3.9% 30 May 2028 18 mo to go 144
Silena ResidencesPalm Deira 3.8% 30 May 2028 18 mo to go 137
Solanki OneWadi Al Safa 5 35.2% 30 May 2028 18 mo to go 133
Verdes by Haven 1Wadi Al Safa 5 17.7% 31 May 2028 18 mo to go 988
Athlon By Al Dar 1Wadi Al Safa 5 27.3% 31 May 2028 18 mo to go 893
SPARKLZ by DanubeJabal Ali First 7.8% 31 May 2028 18 mo to go 358
Damac Riverside Views - Marine 2Dubai Investment Park Second 12% 31 May 2028 18 mo to go 358
Ananda ResidencesAl Hebiah First 3.2% 31 May 2028 18 mo to go 1,027
Damac Riverside Views - Marine 1Dubai Investment Park Second 11.8% 31 May 2028 18 mo to go 358
Damac Riverside Views - Marine 3Dubai Investment Park Second 18.2% 31 May 2028 18 mo to go 276
Damac Riverside Views - Marine 4Dubai Investment Park Second 21.2% 31 May 2028 18 mo to go 276
South Garden EJabal Ali First 8% 31 May 2028 18 mo to go 256
South Garden DJabal Ali First 5.7% 31 May 2028 18 mo to go 256
Hayat 2Madinat Al Mataar 2% 31 May 2028 18 mo to go 142
OlbiaAl Yelayiss 2 0% 31 May 2028 18 mo to go 156
AltonAl Yelayiss 2 5.2% 31 May 2028 18 mo to go 149
Greenway 2Madinat Al Mataar 34.4% 31 May 2028 18 mo to go 492
SunvaleJabal Ali First 1.3% 31 May 2028 18 mo to go 94
Elemental 22Al Satwa 25.9% 31 May 2028 18 mo to go 42
TesseraMadinat Al Mataar 0% 31 May 2028 18 mo to go 80
Avion 100Madinat Al Mataar 0% 31 May 2028 18 mo to go 100
CalisiMadinat Al Mataar 0% 31 May 2028 18 mo to go 68
Le Chateau PietrusPalm Deira 0% 1 Jun 2028 19 mo to go 86
Address Grand DowntownBurj Khalifa 10.8% 10 Jun 2028 19 mo to go 80
Linea by HolmAl Satwa 0.7% 15 Jun 2028 19 mo to go 210
Coventry CurveSaih Shuaib 2 0% 15 Jun 2028 19 mo to go 246
241 WatersidePalm Deira 0% 15 Jun 2028 19 mo to go 63
Sol Terra Casa IAl Barsha South Fourth 0% 15 Jun 2028 19 mo to go 13
Sol Terra Casa IiAl Barsha South Fourth 0% 15 Jun 2028 19 mo to go 11
South Park Residences 2 By WellingtonSaih Shuaib 2 98.9% 20 Jun 2028 19 mo to go 15
Empire LakeviewsWadi Al Safa 2 2.1% 24 Jun 2028 19 mo to go 634
Celesto Tower 2Wadi Al Safa 5 0% 28 Jun 2028 19 mo to go 231
Skyhills Astra by HREAl Barshaa South Second 47.1% 30 Jun 2028 19 mo to go 1,911
Rabdan GatesWadi Al Safa 3 5.2% 30 Jun 2028 19 mo to go 445
South SquareMadinat Al Mataar 2.6% 30 Jun 2028 19 mo to go 571
Reportage HillsAl Hebiah Fifth 0.4% 30 Jun 2028 19 mo to go 902
Vincitore Aqua FloraAl Barshaa South Second 1.3% 30 Jun 2028 19 mo to go 546
The HillgateNadd Hessa 3.1% 30 Jun 2028 19 mo to go 356
TaleaMadinat Dubai Almelaheyah 0% 30 Jun 2028 19 mo to go 354
Reef 998Wadi Al Safa 5 2.1% 30 Jun 2028 19 mo to go 339
Elwood EstatesAl Yufrah 1 14.4% 30 Jun 2028 19 mo to go —
One Park Square By ImanAl Barsha South Fourth 20.1% 30 Jun 2028 19 mo to go 269
Hills View at Wasl GateJabal Ali First 9.1% 30 Jun 2028 19 mo to go 350
The Valley - AvenaAl Yufrah 1 24.5% 30 Jun 2028 19 mo to go 322
Nuve By ZoyaWadi Al Safa 5 0.8% 30 Jun 2028 19 mo to go 234
Damac Riverside - OliveDubai Investment Park Second 5.5% 30 Jun 2028 19 mo to go 208
The Valley - EleaAl Yufrah 1 22% 30 Jun 2028 19 mo to go 128
Omya ResidencesJabal Ali First 0% 30 Jun 2028 19 mo to go 416
Ocean Bay by Samana DevelopersPalm Deira 3.2% 30 Jun 2028 19 mo to go 143
FioriAl Yelayiss 2 0% 30 Jun 2028 19 mo to go 146
Avenue Residence 8Jabal Ali First 17.8% 30 Jun 2028 19 mo to go 104
Damac Hills - IvoryAl Hebiah Third 0.6% 30 Jun 2028 19 mo to go —
Rome 3 by SDWadi Al Safa 3 10.2% 30 Jun 2028 19 mo to go 85
Ryze by AUMAl Warsan First 0.1% 30 Jun 2028 19 mo to go 93
Verdes by Haven 2Wadi Al Safa 5 27.5% 30 Jun 2028 19 mo to go 59
Alba TowerAl Satwa 30.9% 30 Jun 2028 19 mo to go 73
Parkside HillsHadaeq Sheikh Mohammed Bin Rashid 68.3% 30 Jun 2028 19 mo to go 370
Floarea BreezePalm Deira 3.8% 30 Jun 2028 19 mo to go 52
Parkgreen Residences By AlishaanWadi Al Safa 2 4.3% 30 Jun 2028 19 mo to go 116
SquareX OneAl Barsha South Fourth 0% 30 Jun 2028 19 mo to go 207
ElinorMadinat Al Mataar 0% 30 Jun 2028 19 mo to go 102
Ocean Crest by SDPalm Deira 1.4% 30 Jun 2028 19 mo to go 63
Manam PearlJabal Ali First 0% 30 Jun 2028 19 mo to go 79
Verdania 4Wadi Al Safa 5 0% 30 Jun 2028 19 mo to go 394
Aryam Tower By Abu AlnagaJabal Ali First 33.2% 30 Jun 2028 19 mo to go 68
HQA by AristaJabal Ali First 0% 30 Jun 2028 19 mo to go 52
Holm CentralAl Satwa 0% 30 Jun 2028 19 mo to go 461
Project 4412, Al Barsha South FourthAl Barsha South Fourth 0% 30 Jun 2028 19 mo to go —
Project 4234, Al Thanyah FirstAl Thanyah First 0% 30 Jun 2028 19 mo to go —
Aark TerracesWadi Al Safa 5 0% 30 Jun 2028 19 mo to go 131
District 53Madinat Al Mataar 0% 30 Jun 2028 19 mo to go 44
The WinslowBukadra 0% 30 Jun 2028 19 mo to go 260
Casa AltiaJabal Ali First 0% 30 Jun 2028 19 mo to go 77
Eaton SquareBukadra 5.4% 30 Jun 2028 19 mo to go 24
CG LivingPalm Deira 1.6% 30 Jun 2028 19 mo to go 116
Coventry CentroSaih Shuaib 2 0% 1 Jul 2028 20 mo to go 264
Project 4407, Al JadafAl Jadaf 0% 1 Jul 2028 20 mo to go —
Azizi NouraJabal Ali Industrial Second 0% 4 Jul 2028 20 mo to go 269
Azizi GabrielJabal Ali Industrial Second 0% 4 Jul 2028 20 mo to go 234
Azizi RoseJabal Ali Industrial Second 0% 4 Jul 2028 20 mo to go 226
Capital OneAl Barsha South Fourth 6.2% 8 Jul 2028 20 mo to go 128
The MuralMadinat Dubai Almelaheyah 16.6% 10 Jul 2028 20 mo to go 268
Project 3569, Wadi Al Safa 3Wadi Al Safa 3 0% 26 Jul 2028 20 mo to go —
Franck Muller YachtingMadinat Dubai Almelaheyah 0% 29 Jul 2028 20 mo to go 585
Hayat 5Madinat Al Mataar 0% 30 Jul 2028 20 mo to go 112
Project 4600, Al Barshaa South ThirdAl Barshaa South Third 0% 30 Jul 2028 20 mo to go —
Timez By DanubeNadd Hessa 21.5% 31 Jul 2028 20 mo to go 1,191
Samana Sky ViewsMe'Aisem First 2.2% 31 Jul 2028 20 mo to go 556
The Valley - Velora 2Al Yufrah 1 40.3% 31 Jul 2028 20 mo to go 312
Hayat 4Madinat Al Mataar 4.5% 31 Jul 2028 20 mo to go 200
The Valley - Avena 2Al Yufrah 1 42.9% 31 Jul 2028 20 mo to go 332
The Valley - KaiaAl Yufrah 1 19.1% 31 Jul 2028 20 mo to go 156
BayviewMarsa Dubai 63% 31 Jul 2028 20 mo to go 690
Project 4525, Business BayBusiness Bay 65% 31 Jul 2028 20 mo to go —
Project 3470, Palm DeiraPalm Deira 0% 31 Jul 2028 20 mo to go —
Lincoln Star Residence IIIMadinat Al Mataar 0.3% 31 Jul 2028 20 mo to go 76
Omoria Hotel ResidencesPalm Deira 0% 31 Jul 2028 20 mo to go 57
Project 4283, Wadi Al Safa 5Wadi Al Safa 5 50.2% 1 Aug 2028 21 mo to go —
Future Avenue TowerBukadra 0% 1 Aug 2028 21 mo to go 167
Enre Residence By ImtiazMadinat Al Mataar 14.6% 15 Aug 2028 21 mo to go 170
Seacliff by ImtiazPalm Deira 7.7% 15 Aug 2028 21 mo to go 170
La Tilia at Villanova Phase 2Wadi Al Safa 5 10.6% 21 Aug 2028 21 mo to go 440
La Tilia at Villanova Phase 1Wadi Al Safa 5 13.8% 21 Aug 2028 21 mo to go 410
The AUTOGRAPH-I SeriesAl Barsha South Fourth 4% 31 Aug 2028 21 mo to go 272
Samana Hills South 3Saih Shuaib 2 4.6% 31 Aug 2028 21 mo to go 147
Samana Hills South 2Saih Shuaib 2 5.3% 31 Aug 2028 21 mo to go 140
368 Park LnAl Barsha South Fourth 0% 31 Aug 2028 21 mo to go 213
The Valley - VeloraAl Yufrah 1 50.1% 31 Aug 2028 21 mo to go 488
VibeAl Satwa 1.5% 31 Aug 2028 21 mo to go 212
Ocean CoveMadinat Dubai Almelaheyah 17.9% 31 Aug 2028 21 mo to go 233
Haus of TenetBusiness Bay 20.6% 31 Aug 2028 21 mo to go 227
The WeaveAl Barsha South Fourth 7.6% 1 Sep 2028 22 mo to go 130
Soma ResidencesPalm Deira 0% 1 Sep 2028 22 mo to go 44
White OpalsWadi Al Safa 3 1.1% 1 Sep 2028 22 mo to go 49
Marquis HorizonMadinat Al Mataar 0% 5 Sep 2028 22 mo to go 174
Azizi Milan HeightsWadi Al Safa 4 0% 8 Sep 2028 22 mo to go 2,852
Sol LevanteAl Barsha South Fifth 7.2% 15 Sep 2028 22 mo to go 674
Bay Grove Residences D - Dubai IslandsPalm Deira 3.7% 15 Sep 2028 22 mo to go 257
Izel By ZoyaWadi Al Safa 5 0% 15 Sep 2028 22 mo to go 165
Verve City WalkAl Wasl 13.7% 15 Sep 2028 22 mo to go 440
Ashwood EstatesMe'Aisem First 0.1% 18 Sep 2028 22 mo to go —
Project 4380, Al SatwaAl Satwa 0% 20 Sep 2028 22 mo to go —
Bay Grove Residences B - Dubai IslandsPalm Deira 7.6% 21 Sep 2028 22 mo to go 241
Celesto Tower 3Wadi Al Safa 5 0% 28 Sep 2028 22 mo to go 216
Peace Lagoons by Peace HomesWadi Al Safa 5 4.2% 30 Sep 2028 22 mo to go 1,000
Belgravia GardensWadi Al Safa 2 3.1% 30 Sep 2028 22 mo to go 743
DistriktWadi Al Safa 4 8.4% 30 Sep 2028 22 mo to go 550
Samana ParkvilleWadi Al Safa 5 13.9% 30 Sep 2028 22 mo to go 428
15 CascadeAl Hebiah First 5.5% 30 Sep 2028 22 mo to go 442
Kanyon By BeyondMadinat Dubai Almelaheyah 0% 30 Sep 2028 22 mo to go 412
Athlon By Al Dar 2Wadi Al Safa 5 20.4% 30 Sep 2028 22 mo to go 599
Verdana Residence 4Dubai Investment Park First 0% 30 Sep 2028 22 mo to go 392
Reef 996Me'Aisem First 0.1% 30 Sep 2028 22 mo to go 505
Interstellar TowerAl Barsha South Fifth 0% 30 Sep 2028 22 mo to go 285
ELARIS SkyAl Barsha South Fifth 0.2% 30 Sep 2028 22 mo to go 409
Verdana Residence 5Dubai Investment Park First 0% 30 Sep 2028 22 mo to go 392
Verdana 4Dubai Investment Park First 0.1% 30 Sep 2028 22 mo to go 306
Azizi LinaJabal Ali Industrial Second 2% 30 Sep 2028 22 mo to go 242
Verdana Residence 3Dubai Investment Park First 0% 30 Sep 2028 22 mo to go 278
Azizi DavidAl Jadaf 2% 30 Sep 2028 22 mo to go 256
Avant Garde Residences Ii By SkylineAl Barsha South Fourth 7.3% 30 Sep 2028 22 mo to go 223
Verdana 5Dubai Investment Park First 0.1% 30 Sep 2028 22 mo to go 271
Antalya By KarmaAl Hebiah Fourth 0.1% 30 Sep 2028 22 mo to go 192
The Valley - VeneraAl Yufrah 1 51.7% 30 Sep 2028 22 mo to go 696
Verdana 3Dubai Investment Park First 0.1% 30 Sep 2028 22 mo to go 131
ELARIS RiseAl Barsha South Fifth 1.7% 30 Sep 2028 22 mo to go 214
Azizi LeilyAl Jadaf 2% 30 Sep 2028 22 mo to go 272
Ocean ViewsMadinat Dubai Almelaheyah 6.2% 30 Sep 2028 22 mo to go 78
Prestige Gardens by Prestige OneAl Satwa 0% 30 Sep 2028 22 mo to go 48
Binghatti StarfallAl Jadaf 0% 30 Sep 2028 22 mo to go 771
Bond LivingWadi Al Safa 5 0% 30 Sep 2028 22 mo to go 94
Champion Tower 3Al Hebiah Fourth 94.5% 30 Sep 2028 22 mo to go 254
Orvessa Residences by Michel AdamJabal Ali First 1.5% 30 Sep 2028 22 mo to go 92
Samana Business ParkWadi Al Safa 3 12.8% 30 Sep 2028 22 mo to go 103
Villea EastAl Satwa 0% 30 Sep 2028 22 mo to go 113
LindenNad Al Shiba First 0% 30 Sep 2028 22 mo to go 30
Globna by Crystal Bay AzureMadinat Al Mataar 0% 30 Sep 2028 22 mo to go 72
La CrystalPalm Deira 0% 30 Sep 2028 22 mo to go 64
Park Lane III by Heilbronn Properties DevelopmentAl Barsha South Fourth 0.3% 30 Sep 2028 22 mo to go 182
Nad Al Sheba Gardens Phase 10Nad Al Shiba First 0.4% 1 Oct 2028 23 mo to go 201
Nad Al Sheba Gardens Phase 8 & 9Nad Al Shiba First 0.7% 1 Oct 2028 23 mo to go 201
Chapter 01 By Newbury DevelopmentsWarsan Fourth 2.4% 1 Oct 2028 23 mo to go 127
Project 4511, Al Barsha South FifthAl Barsha South Fifth 0% 1 Oct 2028 23 mo to go —
Cedarwood EstatesMe'Aisem First 0% 4 Oct 2028 23 mo to go —
Amis & GPD Presents Fleur De Jardin VillasWadi Al Safa 3 0.6% 9 Oct 2028 23 mo to go 25
Aquora by Casa Vista DevelopmentPalm Deira 2.7% 11 Oct 2028 23 mo to go 111
Le Blanc Residence by ImtiazWadi Al Safa 5 6% 15 Oct 2028 23 mo to go 323
Eywa The Way Of WaterBusiness Bay 0% 15 Oct 2028 23 mo to go 65
Mi Casa By London Gate Real Estate DevelopmentAl Barsha South Fourth 19.1% 26 Oct 2028 23 mo to go 76
Arancia Yards By BeyondWadi Al Safa 4 0% 30 Oct 2028 23 mo to go 284
Cove Boulevard By ImtiazWadi Al Safa 5 10.5% 30 Oct 2028 23 mo to go 436
Wynwood Horizon by ImtiazBukadra 9.6% 30 Oct 2028 23 mo to go 165
Project 4479, Wadi Al Safa 4Wadi Al Safa 4 0% 30 Oct 2028 23 mo to go —
Samana Barari HeightsWadi Al Safa 3 4% 31 Oct 2028 23 mo to go 737
The Valley - Farm Grove 2Al Yufrah 1 9.8% 31 Oct 2028 23 mo to go 290
Greenfield by Samana DevelopersWarsan Fourth 1.5% 31 Oct 2028 23 mo to go 310
The Valley - ElvaAl Yufrah 1 25.9% 31 Oct 2028 23 mo to go 244
Waada - Cascada 1Madinat Al Mataar 1.6% 31 Oct 2028 23 mo to go 249
Sobha Seahaven Tower B & CMarsa Dubai 40.2% 31 Oct 2028 23 mo to go 451
Waada - Rayhan 1Madinat Al Mataar 15.1% 31 Oct 2028 23 mo to go 287
Velos ResidenceAl Hebiah First 6.6% 31 Oct 2028 23 mo to go 413
Golf PointMadinat Al Mataar 4.8% 31 Oct 2028 23 mo to go 590
Pier Point 2Madinat Dubai Almelaheyah 8.5% 31 Oct 2028 23 mo to go 121
Porto ViewMadinat Dubai Almelaheyah 6.3% 31 Oct 2028 23 mo to go 115
Pier Point 1Madinat Dubai Almelaheyah 8.3% 31 Oct 2028 23 mo to go 122
Park LaneHadaeq Sheikh Mohammed Bin Rashid 55.4% 31 Oct 2028 23 mo to go 854
Waada- RaihaMadinat Al Mataar 7% 31 Oct 2028 23 mo to go 132
Oceara Parkview ResidencesPalm Deira 0% 31 Oct 2028 23 mo to go 63
Samana Business Park 2Wadi Al Safa 3 3% 31 Oct 2028 23 mo to go 174
Project 4598, Madinat Al MataarMadinat Al Mataar 0% 31 Oct 2028 23 mo to go —
Samana Barari AvenueWadi Al Safa 3 6% 31 Oct 2028 23 mo to go 349
The Oasis - Palmiera 3Me'Aisem Second 72.6% 31 Oct 2028 23 mo to go —
Project 4603, Wadi Al Safa 3Wadi Al Safa 3 0% 1 Nov 2028 24 mo to go —
CloverWadi Al Safa 5 0% 6 Nov 2028 24 mo to go 176
Vue DoreePalm Deira 1.3% 14 Nov 2028 24 mo to go 50
ZetaWadi Al Safa 2 0% 15 Nov 2028 24 mo to go 147
Al Ghaf JanoubMadinat Al Mataar 0% 15 Nov 2028 24 mo to go 73
Pinewood Estate HomesMe'Aisem First 0.3% 17 Nov 2028 24 mo to go —
The Valley - RiveraAl Yufrah 1 3.9% 30 Nov 2028 24 mo to go 378
Ag Aum ResidenceWadi Al Safa 5 2.4% 30 Nov 2028 24 mo to go 260
Ag Ark TowerWadi Al Safa 5 3.2% 30 Nov 2028 24 mo to go 189
ParklandHadaeq Sheikh Mohammed Bin Rashid 50% 30 Nov 2028 24 mo to go 209
Elaris AxisAl Barsha South Fifth 2.2% 30 Nov 2028 24 mo to go 171
Reef 995Wadi Al Safa 5 0% 30 Nov 2028 24 mo to go 347
Fala by KascoAl Jadaf 0% 30 Nov 2028 24 mo to go 116
Project 3398, Jumeirah SecondJumeirah Second 0% 30 Nov 2028 24 mo to go —
Art House Hills by Adaan and TuscanyAl Barshaa South Third 0.2% 1 Dec 2028 25 mo to go 328
Crystal TowerAl Warsan First 0.3% 1 Dec 2028 25 mo to go 110
Coventry 2Warsan Fourth 0% 1 Dec 2028 25 mo to go 372
Palm Jebel Ali - The Beach and Coral Collection - Frond BPalm Jabal Ali 2.7% 4 Dec 2028 25 mo to go —
Palm Jebel Ali - The Beach and Coral Collection - Frond DPalm Jabal Ali 2.2% 4 Dec 2028 25 mo to go —
Palm Jebel Ali - The Beach and Coral Collection - Frond FPalm Jabal Ali 2.5% 4 Dec 2028 25 mo to go —
Palm Jebel Ali - The Beach and Coral Collection - Frond EPalm Jabal Ali 2.6% 4 Dec 2028 25 mo to go —
Palm Jebel Ali - The Beach and Coral CollectionPalm Jabal Ali 2.4% 4 Dec 2028 25 mo to go —
Palm Jebel Ali - The Beach and Coral Collection - Frond CPalm Jabal Ali 2.8% 4 Dec 2028 25 mo to go —
City Walk Crestlane 2Al Wasl 6.8% 10 Dec 2028 25 mo to go 203
City Walk Crestlane 3Al Wasl 4.6% 10 Dec 2028 25 mo to go 195
AristoMadinat Al Mataar 0.1% 14 Dec 2028 25 mo to go 66
Enchante By GRIDAl Barshaa South Third 0% 15 Dec 2028 25 mo to go 286
Vision IconicNad Al Shiba First 0% 15 Dec 2028 25 mo to go 1,453
ElireBusiness Bay 8.2% 15 Dec 2028 25 mo to go 101
Treppan Living PrivePalm Deira 0% 15 Dec 2028 25 mo to go 65
KORE by ImtiazWadi Al Safa 5 0% 15 Dec 2028 25 mo to go 351
Wellington Ocean WalkPalm Deira 20.8% 16 Dec 2028 25 mo to go 79
John Richmond ResidencesJabal Ali First 0% 16 Dec 2028 25 mo to go 374
burj capitalBusiness Bay 1.5% 22 Dec 2028 25 mo to go 296
X11Madinat Al Mataar 0% 25 Dec 2028 25 mo to go 88
Della XPalm Jumeirah 0% 25 Dec 2028 25 mo to go 153
Celesto tower 4Wadi Al Safa 5 0% 28 Dec 2028 25 mo to go 405
Liv MaritimeMadinat Dubai Almelaheyah 28.1% 30 Dec 2028 25 mo to go 258
Soulever' By BeyondMadinat Dubai Almelaheyah 0% 30 Dec 2028 25 mo to go 517
Floarea OasisWadi Al Safa 5 12.6% 30 Dec 2028 25 mo to go 257
Verdana Residence 6Dubai Investment Park First 0% 30 Dec 2028 25 mo to go 363
Barari PalaceWadi Al Safa 3 0% 30 Dec 2028 25 mo to go 225
The Archive By ImtiazWadi Al Safa 5 3% 30 Dec 2028 25 mo to go 310
Haus 99 ResidencesAl Barsha South Fifth 0% 30 Dec 2028 25 mo to go 100
31 Above By BeyondMadinat Dubai Almelaheyah 0.5% 30 Dec 2028 25 mo to go 118
06 Life ResidencesAl Warsan First 0% 30 Dec 2028 25 mo to go 88
Project 4445, Al Safouh FirstAl Safouh First 0% 30 Dec 2028 25 mo to go —
Project 4493, Al JadafAl Jadaf 0% 30 Dec 2028 25 mo to go —
Sobha SolisAl Hebiah First 17.9% 31 Dec 2028 25 mo to go 2,351
Sobha OrbisAl Hebiah First 18.2% 31 Dec 2028 25 mo to go 3,002
The Valley - VinderaAl Yufrah 1 2% 31 Dec 2028 25 mo to go 745
Samana Boulevard HeightsWadi Al Safa 5 2.5% 31 Dec 2028 25 mo to go 541
Auresta TowerAl Barsha South Fourth 4.4% 31 Dec 2028 25 mo to go 840
The Valley - Farm GroveAl Yufrah 1 10% 31 Dec 2028 25 mo to go 482
Avenue Park TowersAl Kifaf 7.7% 31 Dec 2028 25 mo to go 671
Ellington Sands IPalm Deira 0.4% 31 Dec 2028 25 mo to go 471
Ellington Sands IiPalm Deira 0.4% 31 Dec 2028 25 mo to go 460
Marquis OneAl Barshaa South Third 0.3% 31 Dec 2028 25 mo to go 489
Serenia District - WestAl Thanyah Fifth 2.8% 31 Dec 2028 25 mo to go 423
W Residences at Dubai HarbourMarsa Dubai 4% 31 Dec 2028 25 mo to go 494
Samana Imperial GardenAl Barshaa South Third 4.2% 31 Dec 2028 25 mo to go 344
Voxa ResidencesAl Barsha South Fifth 4.5% 31 Dec 2028 25 mo to go 599
Eltiera HeightsAl Thanyah Fifth 3% 31 Dec 2028 25 mo to go 357
Amaal 8Ras Al Khor Industrial First 7% 31 Dec 2028 25 mo to go 533
ASPIRZ By DanubeAl Hebiah Fourth 5.1% 31 Dec 2028 25 mo to go 706
The HighgroveBukadra 7% 31 Dec 2028 25 mo to go 296
Ayami Residence, By Ayat DevelopmentAl Warsan First 0.1% 31 Dec 2028 25 mo to go 376
Marina Place 2Madinat Dubai Almelaheyah 1.5% 31 Dec 2028 25 mo to go 180
GreenridgeMadinat Al Mataar 35.6% 31 Dec 2028 25 mo to go 520
Golf DaleMadinat Al Mataar 0.3% 31 Dec 2028 25 mo to go 200
One.B TowerBusiness Bay 10.1% 31 Dec 2028 25 mo to go 262
RosewellAl Yelayiss 2 0% 31 Dec 2028 25 mo to go 217
Verdana Residence 7Dubai Investment Park First 0% 31 Dec 2028 25 mo to go 392
Marina Place 1Madinat Dubai Almelaheyah 4.2% 31 Dec 2028 25 mo to go 162
Floarea SkiesAl Barsha South Fourth 4.5% 31 Dec 2028 25 mo to go 195
MirdadAl Hebiah First 6% 31 Dec 2028 25 mo to go 1,114
Club PlaceHadaeq Sheikh Mohammed Bin Rashid 68.8% 31 Dec 2028 25 mo to go 473
BARARIGATE by ADEWadi Al Safa 3 1.7% 31 Dec 2028 25 mo to go 282
Empire GardensWadi Al Safa 5 0% 31 Dec 2028 25 mo to go 221
The CapeWadi Al Safa 3 0.7% 31 Dec 2028 25 mo to go 286
Samana South HavenSaih Shuaib 2 0% 31 Dec 2028 25 mo to go 200
WestonWadi Al Safa 5 0% 31 Dec 2028 25 mo to go 373
Signature Lifestyle ResidencesAl Thanyah Fifth 8.1% 31 Dec 2028 25 mo to go 187
Golf AcresMadinat Al Mataar 3.5% 31 Dec 2028 25 mo to go 158
Verdana 6Dubai Investment Park First 0.1% 31 Dec 2028 25 mo to go 280
Golf HillsideHadaeq Sheikh Mohammed Bin Rashid 65.8% 31 Dec 2028 25 mo to go 185
Verdana 7Dubai Investment Park First 0.1% 31 Dec 2028 25 mo to go 293
Rijas SuitesWadi Al Safa 3 3.3% 31 Dec 2028 25 mo to go 153
Verdana Residence 8Dubai Investment Park First 0% 31 Dec 2028 25 mo to go 210
D VillasMe'Aisem First 9.1% 31 Dec 2028 25 mo to go —
Muraba VeilAl Wasl 7.6% 31 Dec 2028 25 mo to go 135
Aman Residences DubaiJumeirah Second 0.9% 31 Dec 2028 25 mo to go 82
Marina ViewsMadinat Dubai Almelaheyah 7.1% 31 Dec 2028 25 mo to go 554
Verdana 8Dubai Investment Park First 0% 31 Dec 2028 25 mo to go 154
Mayfair Nexus by Seven MayfairWadi Al Safa 7 0.6% 31 Dec 2028 25 mo to go 473
Rosewood Residences DubaiJumeirah Second 0% 31 Dec 2028 25 mo to go 66
Nirvana Residences - IMe'Aisem First 0% 31 Dec 2028 25 mo to go 326
KaiaPalm Deira 0.2% 31 Dec 2028 25 mo to go 128
Beverly CrownAl Barsha South Fourth 0% 31 Dec 2028 25 mo to go 214
Binghatti SpectreAl Jadaf 0% 31 Dec 2028 25 mo to go 966
S'vn ResidencesAl Barsha South Fourth 0% 31 Dec 2028 25 mo to go 201
77SBusiness Bay 13.7% 31 Dec 2028 25 mo to go 405
Damac Islands - Maldives 2Al Yelayiss 1 14.1% 31 Dec 2028 25 mo to go —
Damac Islands - Bora Bora 3Al Yelayiss 1 4.2% 31 Dec 2028 25 mo to go —
Damac Islands - Maldives 3Al Yelayiss 1 12.1% 31 Dec 2028 25 mo to go —
Damac Islands - Bali 2Al Yelayiss 1 5.7% 31 Dec 2028 25 mo to go —
Chapter 02Warsan Fourth 2.1% 31 Dec 2028 25 mo to go 94
DAMAC Islands - Bora Bora 2Al Yelayiss 1 2.5% 31 Dec 2028 25 mo to go —
DAMAC Islands - Maldives 4Al Yelayiss 1 2.9% 31 Dec 2028 25 mo to go —
DAMAC Islands - Bali 1Al Yelayiss 1 7% 31 Dec 2028 25 mo to go —
SelaNad Al Shiba First 0% 31 Dec 2028 25 mo to go 104
DAMAC Islands - Bora Bora 4Al Yelayiss 1 2.1% 31 Dec 2028 25 mo to go —
DAMAC Islands - Fiji 2Al Yelayiss 1 2.2% 31 Dec 2028 25 mo to go —
DAMAC Islands - Fiji 1Al Yelayiss 1 1.7% 31 Dec 2028 25 mo to go —
Project 4590, Al Warsan FirstAl Warsan First 0% 31 Dec 2028 25 mo to go —
Project 4536, Palm DeiraPalm Deira 0% 31 Dec 2028 25 mo to go —
Project 4354, Madinat Al MataarMadinat Al Mataar 0% 31 Dec 2028 25 mo to go —
DAMAC Islands - Maldives 5Al Yelayiss 1 2.6% 31 Dec 2028 25 mo to go —
Project 4587, Al Barsha South FifthAl Barsha South Fifth 0% 31 Dec 2028 25 mo to go —
DAMAC Islands - Bora Bora 1Al Yelayiss 1 6.8% 31 Dec 2028 25 mo to go —
Loriza by ZoyaMadinat Al Mataar 0% 31 Dec 2028 25 mo to go 80
DAMAC Islands - Maldives 1Al Yelayiss 1 6.6% 31 Dec 2028 25 mo to go —
Project 3471, Palm DeiraPalm Deira 0% 31 Dec 2028 25 mo to go —

Months counted from the register date. Source: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026.

Months of 2028

Other years: 2027 · 2029

Data: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026. The DLD end date is the date registered with DLD; your SPA may give another. Methodology