Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3512Under construction743 units

Belgravia Gardens بلغرافيا جاردنز Wadi Al Safa 2 · Falcon City by Ellington Karma Developers L.L.CAll phases of Falcon City 3.1% built (DLD register as of 1 November 2026) DLD end date Sep 2028 22 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Belgravia Gardens apartment building, Falcon City, Dubailand, developer render
Developer's image Ellington Properties
% built
3.1%
DLD register, 1 November 2026
Period elapsed
48%
Jan 2025 → Sep 2028
Latest sales
1,599 AED/sqft
132 sales
1 BR estimate
1.22–1.30 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
3.1%Elapsed
48%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 3.1% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 3.1% built on 4 June 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
4 June 2026 3.1% DLD inspection
16 February 2026 1.3% DLD inspection
28 January 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJan 2025 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 23 October 2022 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 3.1% → 3.1%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3512
Escrow agent
United Bank Limited (Management Office)
Zoning authority
Dubai Development Authority (DDA)
Master project
Falcon City
DLD area
Wadi Al Safa 2
Units · villas
743 · 0
Start → DLD end
Jan 2025 → Sep 2028
Registered unitsStudio 24 · 1 bed 296 · 2 bed 346 · 3 bed 71; sizes 771–1,197 sqft

Also registered: shops and showrooms 6.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Building 1( BLOCK A&D): G+6F+R Building 2 (BLOCK B): G+6F+R Building 3 (BLOCK C): G+6F+R Building 4 (AMENITY BUILDING): G+1F+R Shared Basement: 1B

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,588 AED/sqft
Median of 468 off-plan sales in the 90 days from the first one (Jun 2025)
Latest registered sales
1,599 AED/sqft
Median of 132 home sales in the last 12 months, ready and off-plan
Change
+1.2%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q2 to 2026-Q2: +1.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 1,637 (214) 1,698 (9) +3.7%
2 BR 1,550 (206) 1,558 (11) +0.5%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 25 — —
1 BR 287 1,698 (9) May 2026 – Nov 2026
2 BR 332 1,558 (11) May 2026 – Nov 2026
3 BR 63 1,580 (21) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q2 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 2, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 2

New Ejari rent contracts for apartments across DLD area Wadi Al Safa 2, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 42,000 314 +5%
1 BR AED 55,000 1,206 +3.8%
2 BR AED 78,000 621 +4%
3 BR AED 93,000 59 +1.1%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 137 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
30 October 2026off-planApartment · 1 BR 769 1,365,828 1,776
19 October 2026off-planApartment · 1 BR 765 1,060,000 1,386
2 October 2026off-planApartment · 2 BR 1,197 1,909,828 1,596
7 September 2026off-planApartment · 2 BR 1,200 1,791,828 1,493
1 September 2026off-planApartment · 2 BR 1,201 1,888,828 1,573
18 August 2026off-planApartment · 1 BR 764 1,364,828 1,786
10 August 2026off-planApartment · 3 BR 1,705 2,571,828 1,508
6 August 2026off-planApartment · 1 BR 770 1,307,828 1,698
3 August 2026off-planApartment · 2 BR 1,068 1,610,000 1,507
16 July 2026off-planApartment · 3 BR 1,705 2,689,828 1,578

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Belgravia Gardens or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 1,220,000 – 1,300,000 42 sales, 12 months This project
2 BR 1,650,000 – 1,910,000 66 sales, 12 months This project
3 BR 2,630,000 – 2,840,000 20 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Portal asking median for off-plan units here: 1,651 AED/sqft (22 asks, last 30 days), against 1,596 AED/sqft in the latest registered sales.

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Belgravia Gardens? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Sep 2028); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Sep 2028
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Belgravia Gardens? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 2 · Dubai Municipality community

Falconcity Supermarket · 570 mFalconcity Supermarket · 570 mProject location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location Malls and supermarkets

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallRemal Mall · 2.7 km
SupermarketFalconcity Supermarket · 570 m
HospitalHLG Umar · 5.6 km
SchoolSchool · 1.9 km
ParkPark · 1.7 km
BeachBeach · 6.5 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 14, with 11,815 units and villas.

2026: 02027: 6,7862028: 3,5892029: 1,4292031: 0No end date: 11

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 2: 22

Open projects in the same DLD area with a DLD end year from 2027 to 2029, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Empire Lakeviews 2.1% Jun 2028 1,629 567
Sakura Gardens by HRE 3.6% Jun 2029 1,599 229
Symbolic Altus 1.3% May 2027 1,295 49
Parkgreen Residences By Alishaan 4.3% Jun 2028 1,243 18
Serra Residence By Wujod 28.8% Dec 2027 — 4
Viani by Meteora 0% Jun 2027 — 0
Project 4049, Wadi Al Safa 2 0% Mar 2028 — 0
Confident Preston 0% Apr 2028 — 0
Zeta 0% Nov 2028 — 0
Project 4567, Wadi Al Safa 2 0% Jul 2029 — 0
Elyra 0% Sep 2029 — 0
Latitude 25 0% Dec 2029 — 0

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 2

Developer in DLD data Ellington Karma Developers L.L.C · DLD developer no. 1986

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
743 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Ellington Karma Developers L.L.C is one of 10 DLD-registered developers we list together as Ellington. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Falcon City

DLD lists 6 projects in the master project Falcon City.

Sakura Gardens by HREUnder construction · 3.6% · Jun 2029
Project 4473, Wadi Al Safa 2Pending · 0% · Oct 2031
Project 1939, Wadi Al Safa 2Pending · 4.5% · —
Western Residence - SouthCompleted · 100% · Jun 2009
Western Residence - NorthCompleted · 100% · Jul 2014
Western Residence - North - 25 VillasCompleted · 100% · Dec 2015

Questions about Belgravia Gardens

When is Belgravia Gardens's handover?

DLD lists an end date of Sep 2028 (register of 1 November 2026); the SPA sets the handover terms.

Is Belgravia Gardens past its DLD end date?

No. Its DLD end date is Sep 2028, 22 months after the register of 1 November 2026.

How far along is Belgravia Gardens?

3.1% built in the DLD register of 1 November 2026.

Who is the developer of Belgravia Gardens?

Ellington Karma Developers L.L.C, as registered with DLD.

What is the DLD project number of Belgravia Gardens?

3512.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error