Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4025Under construction140 units

Samana Hills South 2 سامانا هيلز جنوب 2 Saih Shuaib 2 by Samana Signature Real Estate Developments L.L.C 5.3% built (DLD register as of 1 November 2026) DLD end date Aug 2028 21 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Lake and French Village buildings at Riverland, Dubai Parks and Resorts, Saih Shuaib, Dubai
Area photo: Saih Shuaib 2, not this project Photo: Aleksandr SerebrennikovCC BY 4.0
% built
5.3%
DLD register, 1 November 2026
Period elapsed
39%
Sep 2025 → Aug 2028
Latest sales
1,696 AED/sqft
+4.4% on launch 20 sales
1 BR estimate
0.88–1.00 M AED
Automated estimate, not a valuation
Developer
13 projects
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
5.3%Elapsed
39%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 5.3% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 12.4% built on 28 October 2026 (inspections: 4).
Every DLD inspection and every change in the register %, newest first
Date % built Source
28 October 2026 12.4% DLD inspection
28 October 2026 5.3% DLD register
8 June 2026 5.3% DLD inspection
10 February 2026 0.7% DLD inspection
11 August 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedNot seen yet
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 25 February 2022 to 4 April 2025; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 5.3% → 5.3%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
4025
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai Development Authority (DDA)
DLD area
Saih Shuaib 2
Units · villas
140 · 0
Start → DLD end
Sep 2025 → Aug 2028
Registered unitsStudio 57 · 1 bed 72 · 2 bed 11; sizes 369–622 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: G+5+R RESIDENTIAL BUILDING

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,530 AED/sqft
Median of 110 off-plan sales in the 90 days from the first one (Sep 2025)
Latest registered sales
1,696 AED/sqft
Median of 20 home sales after the launch window, in the last 12 months
Change
+4.4%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q3 to 2026-Q2: +0.6%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
Studio 1,683 (45) 1,707 (20) +1.4%
1 BR 1,504 (59) 1,530 (20) +1.7%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 56 1,707 (20) Nov 2025 – Nov 2026
1 BR 66 1,530 (20) Nov 2025 – Nov 2026
2 BR 8 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q3 → 2026-Q3

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Saih Shuaib 2, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Saih Shuaib 2

New Ejari rent contracts for apartments across DLD area Saih Shuaib 2, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 38,000 260 +2.7%
1 BR AED 50,000 169 -9.1%
2 BR AED 70,000 148 0%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 44 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
16 July 2026off-planApartment · Studio 441 748,000 1,696
11 March 2026off-planApartment · 1 BR 792 1,131,444 1,429
11 March 2026off-planApartment · 1 BR 578 864,166 1,495
6 March 2026off-planApartment · 1 BR 792 1,100,071 1,389
2 March 2026off-planApartment · Studio 366 645,030 1,762
26 February 2026off-planApartment · Studio 371 637,036 1,717
13 February 2026off-planApartment · 2 BR 1,021 1,541,955 1,510
3 February 2026off-planApartment · 1 BR 581 933,000 1,606
28 January 2026off-planApartment · 2 BR 954 1,200,069 1,258
21 January 2026off-planApartment · Studio 366 637,999 1,743

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Samana Hills South 2 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
Studio 600,000 – 650,000 19 sales, 12 months This project
1 BR 880,000 – 1,000,000 20 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Samana Hills South 2? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Aug 2028); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Aug 2028
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Samana Hills South 2? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationSaih Shuaib 2 · Dubai Municipality community

Project location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallThe Outlet Village · 5.3 km
HospitalShifa International Hospitals DWC · 9.4 km

Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 17, with 2,946 units and villas.

2026: 2482027: 7732028: 1,0722029: 853

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Saih Shuaib 2: 22

Open projects in the same DLD area with a DLD end year from 2027 to 2029, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Samana Hills South 12.1% May 2028 1,455 512
Al Haseen Residence 3 10.1% May 2027 1,480 148
Samana Hills South 3 4.6% Aug 2028 1,389 145
Samana South Haven 0% Dec 2028 — 123
South Lofts by Premier Choice 0% Jan 2029 1,360 103
Elanora by zoya 0% Mar 2028 1,327 56
South Park Residences By Wellington 96.8% Dec 2027 980 25
Coventry Curve 0% Jun 2028 1,099 23
Coventry Residence 3 0% Dec 2027 1,317 18
Samana South Haven 2 0% Jun 2029 — 14
South Park Residences 2 By Wellington 98.9% Jun 2028 1,019 13
Coventry Centro 0% Jul 2028 — 11

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Saih Shuaib 2

Developer in DLD data Samana Signature Real Estate Developments L.L.C · DLD developer no. 1598

Projects registered
13
0 completed · 12 under construction · 1 not started
Units delivered
0
4,236 in the pipeline
Past the DLD end date
1
of 10 under construction with a DLD end date

Samana Signature Real Estate Developments L.L.C is one of 10 DLD-registered developers we list together as Samana. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Samana Hills South 2

When is Samana Hills South 2's handover?

DLD lists an end date of Aug 2028 (register of 1 November 2026); the SPA sets the handover terms.

Is Samana Hills South 2 past its DLD end date?

No. Its DLD end date is Aug 2028, 21 months after the register of 1 November 2026.

How far along is Samana Hills South 2?

5.3% built in the DLD register of 1 November 2026.

Who is the developer of Samana Hills South 2?

Samana Signature Real Estate Developments L.L.C, as registered with DLD.

What is the DLD project number of Samana Hills South 2?

4025.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error