DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4235Not started328 units

Art House Hills by Adaan and Tuscany آرت هاوس هيلز من قِبَل آدان و توسكاني Al Barshaa South Third · Arjan by Art House Hills Residences Development L.L.CAll phases of Arjan DLD status: Not started (DLD register as of 1 November 2026) DLD end date Dec 2028 25 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
0.2%
DLD register, 1 November 2026
Registered start
Feb 2026
DLD end date Dec 2028
Latest sales
1,787 AED/sqft
-2.3% on launch 10 sales
1 BR estimate
1.32–1.51 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

Completion

DLD status: Not started. 0.2% built, DLD end date 1 December 2028. DLD Project Status shows inspection reports once works begin.

DLD register readings
Date % built DLD end dateDLD status
28 October 2026 0.2% 1 December 2028Not started

Source: DLD projects register, export of 1 November 2026.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
4235
Escrow agent
Sharjah Islamic Bank
Zoning authority
Dubai Development Authority (DDA)
Master project
Arjan
DLD area
Al Barshaa South Third
Units · villas
328 · 0
Start → DLD end
Feb 2026 → Dec 2028
Registered unitsStudio 60 · 1 bed 166 · 2 bed 100; sizes 801–1,176 sqft

Also registered: shops and showrooms 2.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Proposed 2B+G+17F+Roof Residential cum Retail Building

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,777 AED/sqft
Median of 54 off-plan sales in the 90 days from the first one (Apr 2026)
Latest registered sales
1,787 AED/sqft
Median of 10 home sales after the launch window, in the last 12 months
Change
-2.3%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2026-Q2 to 2026-Q2: 0%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
Studio 1,832 (22) 1,809 (19) -1.3%
1 BR 1,632 (9) 1,665 (6) +2%
2 BR 1,746 (23) 1,737 (20) -0.5%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 29 1,809 (19) May 2026 – Nov 2026
1 BR 11 1,665 (6) May 2026 – Nov 2026
2 BR 24 1,737 (20) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2026-Q2 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Al Barshaa South Third, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Al Barshaa South Third

New Ejari rent contracts for apartments across DLD area Al Barshaa South Third, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 46,003 3,005 -4.2%
1 BR AED 70,000 2,958 0%
2 BR AED 100,000 1,124 0%
3 BR AED 150,000 120 0%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Service charges

What owners pay a year in completed buildings of the project’s master community, from their owners’ association budgets. A building’s own charge is set by its own budget.

Apartment buildings’ budgets; villa and townhouse budgets are left out.
16.26 AED/sqft a year
Arjan: median of 33 developments’ owners’ association budgets, 2026

Median AED per sq ft a year of residential owners’ association budgets, each development counted once, in the newest budget year with at least 10 developments. Plots, shared areas and hotel rooms are left out. A budget is not any one owner’s bill.

Source: Dubai Land Department, owners’ association budgets (service charges).

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 64 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
27 October 2026off-planApartment · Studio 588 940,888 1,600
15 October 2026off-planApartment · 2 BR 1,136 2,050,000 1,805
16 September 2026off-planApartment · Studio 473 868,041 1,835
31 August 2026off-planApartment · 1 BR 857 1,507,341 1,759
31 August 2026off-planApartment · Studio 506 905,871 1,790
28 August 2026off-planApartment · 1 BR 820 1,427,731 1,741
28 August 2026off-planApartment · Studio 472 1,002,888 2,125
28 August 2026off-planApartment · Studio 511 924,301 1,809
20 July 2026off-planApartment · Studio 517 923,888 1,787
20 July 2026off-planApartment · Studio 473 835,115 1,766

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Art House Hills by Adaan and Tuscany or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
Studio 870,000 – 920,000 29 sales, 12 months This project
1 BR 1,320,000 – 1,510,000 11 sales, 12 months This project
2 BR 2,050,000 – 2,230,000 24 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2028); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2028
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Art House Hills by Adaan and Tuscany? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationAl Barsha South Third · Dubai Municipality community

Dubai Butterfly Garden · 310 mSafa Community School · 380 mSchool · 420 mDubai Miracle Garden · 580 mCity Centre Al Barsha · 650 mGrandiose · 780 mViva · 880 mNesto · 1.1 kmAustralian International School Dubai (AIS Dubai) · 1.5 kmPark · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationMall of the Emirates Metro Station · Red Metro line · 7.8 km
MallCity Centre Al Barsha · 650 m
SupermarketGrandiose · 780 m
HospitalKings Hospital · 5.4 km
SchoolSafa Community School · 380 m
ParkDubai Butterfly Garden · 310 m

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 35, with 16,119 units and villas.

2022: 1242025: 9772026: 3,4812027: 2,2482028: 4,2002029: 1,437No end date: 3,652

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Al Barsha South Third: 29

Open projects in the same DLD area with a DLD end year from 2027 to 2029, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Marquis One 0.3% Dec 2028 1,705 397
The central downtown 10.5% Mar 2028 1,445 365
Samana Imperial Garden 4.2% Dec 2028 1,871 326
Ashley Hills 74.1% Mar 2027 1,498 287
Floarea Grande 48.2% Aug 2027 1,656 222
butterfly 7.7% Jan 2029 1,609 198
Enchante By GRID 0% Dec 2028 1,751 161
Parkside Boulevard 51.9% Dec 2027 1,419 128
Bond Enclave 20% Nov 2027 1,709 54
Vertex Pointe 0% Nov 2027 — 1
The LX 4.9% Aug 2027 — 0
Project 4431, Al Barshaa South Third 0% Feb 2028 — 0

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Al Barsha South Third

Developer in DLD data Art House Hills Residences Development L.L.C · DLD developer no. 2530

Projects registered
1
0 completed · 0 under construction · 1 not started
Units delivered
0
328 in the pipeline

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error