Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4174Under construction323 units

Le Blanc Residence by Imtiaz لي بلانك ريزيدنس من امتياز Wadi Al Safa 5 · Dubai Land Residence Complex by Imtiaz Cove Real Estate Development L.L.CAll phases of Dubai Land Residence Complex 6% built (DLD register as of 1 November 2026) DLD end date Oct 2028 23 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Le Blanc by Imtiaz tower at dusk, Dubailand Residence Complex, developer render
Developer's image Imtiaz Developments
% built
6%
DLD register, 1 November 2026
Period elapsed
29%
Jan 2026 → Oct 2028
Latest sales
1,644 AED/sqft
+0.8% on launch 154 sales
1 BR estimate
1.20–1.29 M AED
Automated estimate, not a valuation
Developer
3 projects
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
6%Elapsed
29%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 6% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 6% built on 8 October 2026 (inspections: 4).
Every DLD inspection and every change in the register %, newest first
Date % built Source
8 October 2026 6% DLD inspection
7 July 2026 3.4% DLD inspection
8 April 2026 0.4% DLD inspection
23 October 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
0.7 pt/month
3.4% on 7 July 2026 → 6% on 1 November 2026
At the register date
6%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJan 2026 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 8 November 2023 to 18 February 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 6% → 6%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
4174
Escrow agent
Ajman Bank /P.J.S.C
Zoning authority
Dubai Development Authority (DDA)
Master project
Dubai Land Residence Complex
DLD area
Wadi Al Safa 5
Units · villas
323 · 0
Start → DLD end
Jan 2026 → Oct 2028
Registered unitsStudio 187 · 1 bed 102 · 2 bed 17 · 3 bed 17; sizes 440–857 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: B+G+3P+17+R - Residential Building

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,667 AED/sqft
Median of 142 off-plan sales in the 90 days from the first one (Jan 2026)
Latest registered sales
1,644 AED/sqft
Median of 154 home sales after the launch window, in the last 12 months
Change
+0.8%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2026-Q1 to 2026-Q2: -3.2%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
Studio 1,730 (78) 1,765 (49) +2%
1 BR 1,489 (47) 1,500 (29) +0.7%
2 BR 1,337 (6) 1,350 (6) +1%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 170 1,765 (49) May 2026 – Nov 2026
1 BR 94 1,500 (29) May 2026 – Nov 2026
2 BR 16 1,350 (6) May 2026 – Nov 2026
3 BR 16 1,288 (16) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Skyline Index

Registered sale prices, rents and yields for Le Blanc Residence by Imtiaz, from DLD records.

Le Blanc Residence by Imtiaz: registered prices and rents on Skyline Index ↗

Median AED/sqft by quarter

2026-Q1 → 2026-Q3

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 5, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 5

New Ejari rent contracts for apartments across DLD area Wadi Al Safa 5, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 40,000 918 +2.6%
1 BR AED 55,000 1,194 0%
2 BR AED 73,000 653 +4.3%
3 BR AED 100,000 63 -8.6%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 296 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
23 September 2026off-planApartment · 3 BR 1,614 2,175,627 1,348
22 September 2026off-planApartment · 1 BR 822 1,270,675 1,546
14 September 2026off-planApartment · Studio 832 712,800 857
11 September 2026off-planApartment · Studio 838 712,800 851
25 August 2026off-planApartment · 1 BR 857 1,400,196 1,634
3 August 2026off-planApartment · Studio 444 764,952 1,723
29 July 2026off-planApartment · 2 BR 2,372 2,044,565 862
7 July 2026off-planApartment · Studio 440 710,840 1,616
6 July 2026off-planApartment · 1 BR 958 1,373,629 1,434
2 July 2026off-planApartment · 1 BR 1,990 1,200,151 603

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Le Blanc Residence by Imtiaz or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
Studio 730,000 – 790,000 170 sales, 12 months This project
1 BR 1,200,000 – 1,290,000 94 sales, 12 months This project
2 BR 1,620,000 – 1,750,000 16 sales, 12 months This project
3 BR 1,990,000 – 2,120,000 16 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Le Blanc Residence by Imtiaz? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Oct 2028); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Oct 2028
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Le Blanc Residence by Imtiaz? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 5 · Dubai Municipality community

Durrah Al Madeena · 260 mKP Mart · 320 mAl Jiva Mini Mart · 370 mGems First Point School (The Villa) · 540 mCentro Courtyard 11 · 890 mCentro Courtyard 10 · 930 mCentro Courtyard 7 · 1 kmProject location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallDubai Outlet Mall · 2.6 km
SupermarketDurrah Al Madeena · 260 m
HospitalHLG Umar · 3.9 km
SchoolGems First Point School (The Villa) · 540 m
ParkCentro Courtyard 11 · 890 m
BeachBeach · 6.6 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 93, with 22,868 units and villas.

2026: 2,3312027: 7,8072028: 8,0992029: 3,1442030: 565No end date: 922

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 5: 108

Open projects in the same DLD area with a DLD end year from 2027 to 2029, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Peace Lagoons by Peace Homes 4.2% Sep 2028 1,410 795
Verdes by Haven 1 17.7% May 2028 1,374 658
Peace Lagoons II by Peace Homes 4% Jan 2029 1,585 553
Cove Grand Residence by Imtiaz 13.4% Dec 2027 1,531 526
Samana Boulevard Heights 2.5% Dec 2028 1,522 526
La Tilia at Villanova Phase 2 10.6% Aug 2028 1,487 477
La Tilia at Villanova Phase 1 13.8% Aug 2028 1,435 456
Samana IBIZA 5.5% Feb 2028 1,426 444
Samana Parkville 13.9% Sep 2028 1,503 419
Athlon By Al Dar 1 27.3% May 2028 1,574 387
The Boulevard By Prestige One 10.6% Nov 2027 1,359 375
Rise by Athlon 1 3.7% Dec 2029 1,657 356

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 5

Developer in DLD data Imtiaz Cove Real Estate Development L.L.C · DLD developer no. 2275

Projects registered
3
0 completed · 3 under construction · 0 not started
Units delivered
0
1,125 in the pipeline
Past the DLD end date
0
of 3 under construction with a DLD end date

Imtiaz Cove Real Estate Development L.L.C is one of 14 DLD-registered developers we list together as Imtiaz. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai Land Residence Complex

DLD lists 118 projects in the master project Dubai Land Residence Complex.

Dalmore TowerUnder construction · 95.1% · Apr 2026
Time 2Under construction · 87.1% · Jun 2026
Weybridge Gardens 3Under construction · 23.9% · Aug 2026
Cove Edition Residence 1 By ImtiazUnder construction · 90.2% · Aug 2026
Ag SquareUnder construction · 68.8% · Sep 2026
Cove Edition Residence 2 By ImtiazUnder construction · 60.1% · Oct 2026
A 99Under construction · 47.8% · Oct 2026
Ag CentralUnder construction · 58.7% · Oct 2026
Bliss TowerUnder construction · 92.5% · Dec 2026
Cove Edition Residence 3 By ImtiazUnder construction · 44% · Dec 2026
Reef 1000Under construction · 67.2% · Dec 2026
Lateral OneUnder construction · 72.1% · Dec 2026

Questions about Le Blanc Residence by Imtiaz

When is Le Blanc Residence by Imtiaz's handover?

DLD lists an end date of Oct 2028 (register of 1 November 2026); the SPA sets the handover terms.

Is Le Blanc Residence by Imtiaz past its DLD end date?

No. Its DLD end date is Oct 2028, 23 months after the register of 1 November 2026.

How far along is Le Blanc Residence by Imtiaz?

6% built in the DLD register of 1 November 2026.

Who is the developer of Le Blanc Residence by Imtiaz?

Imtiaz Cove Real Estate Development L.L.C, as registered with DLD.

What is the DLD project number of Le Blanc Residence by Imtiaz?

4174.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error