DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3455Under construction410 units

La Tilia at Villanova Phase 1 لا تيليا في فيلانوفا المرحلة 1 Wadi Al Safa 5 by North Dubailand Projects L.L.C 13.8% built (DLD register as of 1 November 2026) DLD end date Aug 2028 21 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

La Tilia townhouses at Villanova, Dubailand, developer render
Developer's image Dubai Properties
% built
13.8%
DLD register, 1 November 2026
Period elapsed
50%
Jan 2025 → Aug 2028
Latest sales
1,435 AED/sqft
63 sales
3 BR estimate
2.95–3.04 M AED
Automated estimate, not a valuation
Developer
19 projects
17 completed · 5,113 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
13.8%Elapsed
50%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 13.8% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 13.8% built on 5 October 2026 (inspections: 7).
Every DLD inspection and every change in the register %, newest first
Date % built Source
5 October 2026 13.8% DLD inspection
29 June 2026 5% DLD inspection
24 March 2026 2.2% DLD inspection
22 December 2025 1.3% DLD inspection
8 September 2025 0.8% DLD inspection
26 June 2025 0.2% DLD inspection
16 December 2024 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
2.1 pt/month
5% on 29 June 2026 → 13.8% on 1 November 2026
At the register date
13.8%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJul 2025 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 23 October 2022 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 13.8% → 13.8%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3455
Escrow agent
First Abu Dhabi Bank P.J.S.C.
Zoning authority
Dubai Development Authority (DDA)
DLD area
Wadi Al Safa 5
Units · villas
0 · 410
Start → DLD end
Jan 2025 → Aug 2028
Registered units3 bed 234 · 4 bed 176; sizes 2,354–2,937 sqft

Homes: villas 410.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: The residential project consists of 410 (G+1, G+2) 3 & 4 Bedroom Townhouse units as following: ? 3 bed G+1: 202 units ? 4 bed G+1: 102 units ? 3 bed G+2: 32 units ? 4 bed G+2 : 74 units

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,416 AED/sqft
Median of 385 off-plan sales in the 90 days from the first one (Jan 2025)
Latest registered sales
1,435 AED/sqft
Median of 63 home sales in the last 12 months, ready and off-plan
Change
+5.2%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (villas), 2025-Q1 to 2026-Q2: +8.7%.

Prices are over villas and townhouses, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
3 BR 1,457 (220) 1,486 (11) +2%
4 BR 1,161 (165) 1,111 (12) -4.3%
Registered sales of villas and townhouses by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
3 BR 259 1,486 (11) May 2026 – Nov 2026
4 BR 197 1,111 (12) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Skyline Index

Registered sale prices, rents and yields for La Tilia at Villanova Phase 1, from DLD records.

La Tilia at Villanova Phase 1: registered prices and rents on Skyline Index ↗

Median AED/sqft by quarter

2025-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (villas and townhouses). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 5, median AED/sqft of off-plan sales of villas and townhouses by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 5

New Ejari rent contracts for villas and townhouses across DLD area Wadi Al Safa 5, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
2 BR AED 125,000 64 -6.2%
3 BR AED 155,000 1,266 -6.1%
4 BR AED 210,000 887 0%
5 BR AED 319,541 215 +6.5%
6 BR AED 390,000 21 -2.5%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Service charges

What owners pay a year in completed buildings of the project’s master community, from their owners’ association budgets. A building’s own charge is set by its own budget.

Apartment buildings’ budgets; villa and townhouse budgets are left out.
19.07 AED/sqft a year
Dubai Investment Park: median of 12 developments’ owners’ association budgets, 2026

Median AED per sq ft a year of residential owners’ association budgets, each development counted once, in the newest budget year with at least 10 developments. Plots, shared areas and hotel rooms are left out. A budget is not any one owner’s bill.

Source: Dubai Land Department, owners’ association budgets (service charges).

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 63 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
4 November 2026off-planVilla · 4 BR 4,365 4,526,000 1,037
29 October 2026off-planVilla · 3 BR 2,110 3,050,000 1,445
21 October 2026off-planVilla · 4 BR 3,447 3,624,000 1,051
20 October 2026off-planVilla · 4 BR 2,803 3,116,000 1,112
16 October 2026off-planVilla · 3 BR 2,110 3,000,000 1,422
12 October 2026off-planVilla · 3 BR 1,959 2,911,000 1,486
6 October 2026off-planVilla · 3 BR 1,884 2,875,000 1,526
30 September 2026off-planVilla · 4 BR 3,142 3,525,000 1,122
28 September 2026off-planVilla · 4 BR 3,645 3,750,000 1,029
22 September 2026off-planVilla · 3 BR 1,884 2,800,000 1,486

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in La Tilia at Villanova Phase 1 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
3 BR 2,950,000 – 3,040,000 33 sales, 12 months This project
4 BR 3,380,000 – 3,730,000 29 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in La Tilia at Villanova Phase 1? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Aug 2028); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Aug 2028
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in La Tilia at Villanova Phase 1? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 5 · Dubai Municipality community

Zoom · 1.1 kmPark · 1.2 kmCourtyard 7 · 1.3 kmCourtyard 6 · 1.4 kmApproximate project location© OpenStreetMap contributors · Dubai Municipality · Makani
Approximate project location Malls and supermarkets Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallRemal Mall · 3.6 km
SupermarketZoom · 1.1 km
HospitalHLG Umar · 7.4 km
SchoolSchool · 1.6 km
ParkPark · 1.2 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 1, with 0 units and villas.

2028: 0

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 5: 108

Open projects in the same DLD area with a DLD end year from 2027 to 2029, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Peace Lagoons by Peace Homes 4.2% Sep 2028 1,410 795
Verdes by Haven 1 17.7% May 2028 1,374 658
Peace Lagoons II by Peace Homes 4% Jan 2029 1,585 553
Cove Grand Residence by Imtiaz 13.4% Dec 2027 1,531 526
Samana Boulevard Heights 2.5% Dec 2028 1,522 526
La Tilia at Villanova Phase 2 10.6% Aug 2028 1,487 477
Samana IBIZA 5.5% Feb 2028 1,426 444
Samana Parkville 13.9% Sep 2028 1,503 419
Athlon By Al Dar 1 27.3% May 2028 1,574 387
The Boulevard By Prestige One 10.6% Nov 2027 1,359 375
Rise by Athlon 1 3.7% Dec 2029 1,657 356
Kensington Gardens 0% Sep 2027 1,354 336

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 5

Developer in DLD data North Dubailand Projects L.L.C · DLD developer no. 1039

Projects registered
19
17 completed · 2 under construction · 0 not started
Units delivered
5,113
850 in the pipeline
Median build time
36 months
completed projects measured: 17
Past the DLD end date
0
of 2 under construction with a DLD end date

Completed a month or more after their DLD end date: 0 of 17 completed projects with both dates. In 17 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about La Tilia at Villanova Phase 1

When is La Tilia at Villanova Phase 1's handover?

DLD lists an end date of Aug 2028 (register of 1 November 2026); the SPA sets the handover terms.

Is La Tilia at Villanova Phase 1 past its DLD end date?

No. Its DLD end date is Aug 2028, 21 months after the register of 1 November 2026.

How far along is La Tilia at Villanova Phase 1?

13.8% built in the DLD register of 1 November 2026.

Who is the developer of La Tilia at Villanova Phase 1?

North Dubailand Projects L.L.C, as registered with DLD.

What is the DLD project number of La Tilia at Villanova Phase 1?

3455.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error