Wadi Al Safa 5 وادي الصفا 5 109 projects not yet completed · 30,125 units · 19,128 sales in 24 months DLD projects register as of 1 November 2026 · sales to 5 November 2026
Wadi Al Safa 5 has 109 projects not yet completed in the Dubai Land Department projects register as of 1 November 2026, with 30,125 units and villas; its projects had 19,128 registered sales in the last 24 months.
Source: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026.
Projects on the map100 of the 100 projects listed have a map pin.
Projects not yet completed (100)Projects not yet completed in Wadi Al Safa 5, by registered sales in 24 months
| Project | Developer | DLD status | Built | DLD end date | Past DLD end date | Sales, 24 mo |
|---|---|---|---|---|---|---|
| Peace Lagoons by Peace Homes3146 · Wadi Al Safa 5 · Dubai Land Residence Complex | Peace Homes Development L.L.C | Under construction | 4.2% | Sep 2028 22 mo to go | — | 795 |
| Verdes by Haven 13188 · Wadi Al Safa 5 | Aurora SPV 1 L.L.C | Under construction | 17.7% | May 2028 18 mo to go | — | 658 |
| Peace Lagoons II by Peace Homes3383 · Wadi Al Safa 5 · Dubai Land Residence Complex | Peace Homes Development L.L.C | Under construction | 4% | Jan 2029 26 mo to go | — | 553 |
| Samana Boulevard Heights3205 · Wadi Al Safa 5 · Dubai Land Residence Complex | Samana International Real Estate Development L.L.C | Under construction | 2.5% | Dec 2028 25 mo to go | — | 526 |
| Cove Grand Residence by Imtiaz3774 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Cove Real Estate Development L.L.C | Under construction | 13.4% | Dec 2027 13 mo to go | — | 526 |
| La Tilia at Villanova Phase 23456 · Wadi Al Safa 5 | North Dubailand Projects L.L.C | Under construction | 10.6% | Aug 2028 21 mo to go | — | 477 |
| La Tilia at Villanova Phase 13455 · Wadi Al Safa 5 | North Dubailand Projects L.L.C | Under construction | 13.8% | Aug 2028 21 mo to go | — | 456 |
| Samana IBIZA2897 · Wadi Al Safa 5 · Dubai Land Residence Complex | Samana International Real Estate Development L.L.C | Under construction | 5.5% | Feb 2028 15 mo to go | — | 444 |
| Samana Parkville3791 · Wadi Al Safa 5 · Dubai Land Residence Complex | Samana Signature Real Estate Developments L.L.C | Under construction | 13.9% | Sep 2028 22 mo to go | — | 419 |
| Athlon By Al Dar 13143 · Wadi Al Safa 5 | Aurora SPV 3 L.L.C | Under construction | 27.3% | May 2028 18 mo to go | — | 387 |
| The Boulevard By Prestige One3428 · Wadi Al Safa 5 · Dubai Land Residence Complex | Prestige The Boulevard Real Estate Development L.L.C | Under construction | 10.6% | Nov 2027 12 mo to go | — | 375 |
| Rise by Athlon 14044 · Wadi Al Safa 5 | Aurora SPV 3 L.L.C | Under construction | 3.7% | Dec 2029 37 mo to go | — | 356 |
| Kensington Gardens3564 · Wadi Al Safa 5 · Dubai Land Residence Complex | Leos Development L.L.C | Not started | 0% | Sep 2027 10 mo to go | — | 336 |
| Terra Tower3278 · Wadi Al Safa 5 · Dubai Land Residence Complex | Dugasta Properties Development L.L.C | Under construction | 7.4% | Apr 2027 5 mo to go | — | 323 |
| Athlon By Al Dar 23145 · Wadi Al Safa 5 | Aurora SPV 3 L.L.C | Under construction | 20.4% | Sep 2028 22 mo to go | — | 314 |
| Rise by Athlon 24045 · Wadi Al Safa 5 | Aurora SPV 3 L.L.C | Under construction | 3.7% | Jan 2030 38 mo to go | — | 308 |
| Le Blanc Residence by Imtiaz4174 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Cove Real Estate Development L.L.C | Under construction | 6% | Oct 2028 23 mo to go | — | 296 |
| Reef 9983651 · Wadi Al Safa 5 · Dubai Land Residence Complex | Reef Luxury Development L.L.C | Under construction | 2.1% | Jun 2028 19 mo to go | — | 281 |
| Samana IVY Gardens 22909 · Wadi Al Safa 5 · Dubai Land Residence Complex | Samana International Real Estate Development L.L.C | Under construction | 20% | Dec 2027 13 mo to go | — | 271 |
| Cove Edition Residence 2 By Imtiaz3286 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Real Estate Investment & Development L.L.C | Under construction | 60.1% | Oct 2026 under 1 mo past | — | 270 |
| Cove Edition Residence 4 By Imtiaz3483 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Real Estate Investment & Development L.L.C | Under construction | 30.2% | Jan 2027 2 mo to go | — | 268 |
| Cove Edition Residence 3 By Imtiaz3466 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Real Estate Investment & Development L.L.C | Under construction | 44% | Dec 2026 1 mo to go | — | 267 |
| Haven By Aldar 22874 · Wadi Al Safa 5 | Aurora SPV 1 L.L.C | Under construction | 53.4% | — | — | 266 |
| Cove Edition Residence 6 By Imtiaz3803 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Cove Real Estate Development L.L.C | Under construction | 25.9% | Sep 2027 10 mo to go | — | 263 |
| Ag Aum Residence3262 · Wadi Al Safa 5 · Dubai Land Residence Complex | Agp Assets Real Estate Developments L.L.C | Under construction | 2.4% | Nov 2028 24 mo to go | — | 257 |
| Weybridge Gardens 23007 · Wadi Al Safa 5 · Dubai Land Residence Complex | Leos Development L.L.C | Under construction | 33.7% | — | — | 249 |
| Cove Boulevard By Imtiaz3675 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Real Estate Investment & Development L.L.C | Under construction | 10.5% | Oct 2028 23 mo to go | — | 243 |
| Floarea Oasis3603 · Wadi Al Safa 5 · Dubai Land Residence Complex | Mashriq Elite Real Estate Development L.L.C | Under construction | 12.6% | Dec 2028 25 mo to go | — | 228 |
| Cybele By Wadan4222 · Wadi Al Safa 5 · Dubai Land Residence Complex | Wadan Real Estate Development L.L.C | Under construction | 2% | Dec 2027 13 mo to go | — | 228 |
| Time 33155 · Wadi Al Safa 5 · Dubai Land Residence Complex | Time Properties | Under construction | 47.1% | Aug 2027 9 mo to go | — | 212 |
| Weybridge Gardens 33164 · Wadi Al Safa 5 · Dubai Land Residence Complex | Leos Development L.L.C | Under construction | 23.9% | Aug 2026 2 mo past | 2 mo | 212 |
| Samana Park Meadows2896 · Wadi Al Safa 5 · Dubai Land Residence Complex | Samana International Real Estate Development L.L.C | Under construction | 38% | Aug 2027 9 mo to go | — | 202 |
| COVE EDITION RESIDENCE 5 by Imtiaz3705 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Real Estate Investment & Development L.L.C | Under construction | 26.3% | May 2027 6 mo to go | — | 199 |
| Seraph by Wadan4109 · Wadi Al Safa 5 · Dubai Land Residence Complex | Wadan Real Estate Development L.L.C | Under construction | 20.9% | Dec 2027 13 mo to go | — | 190 |
| Haven By Aldar 12873 · Wadi Al Safa 5 | Aurora SPV 1 L.L.C | Under construction | 61% | Nov 2027 12 mo to go | — | 188 |
| Ag Ark Tower3313 · Wadi Al Safa 5 · Dubai Land Residence Complex | Agp Ark Real Estate Development L.L.C | Under construction | 3.2% | Nov 2028 24 mo to go | — | 182 |
| Nuve By Zoya4290 · Wadi Al Safa 5 · Dubai Land Residence Complex | Zoya One Real Estate Developments L.L.C | Under construction | 0.8% | Jun 2028 19 mo to go | — | 177 |
| Verdania 13543 · Wadi Al Safa 5 · Dubai Land Residence Complex | OBJ1 Real Estate Development L.L.C | Under construction | 16.7% | Mar 2027 4 mo to go | — | 173 |
| Milos By Karma3132 · Wadi Al Safa 5 · Dubai Land Residence Complex | Karma Realty Developers L.L.C | Not started | 0.4% | Apr 2027 5 mo to go | — | 170 |
| Celesto Tower4106 · Wadi Al Safa 5 · Dubai Land Residence Complex | Tarrad Development L.L.C | Under construction | 3.9% | Dec 2027 13 mo to go | — | 156 |
| Sky Line By Peace Homes4125 · Wadi Al Safa 5 · Dubai Land Residence Complex | Peace Homes Real Estate L.L.C | Not started | 0% | May 2030 42 mo to go | — | 147 |
| Weybridge Gardens 54005 · Wadi Al Safa 5 · Dubai Land Residence Complex | Leos Development L.L.C | Not started | 0% | Sep 2027 10 mo to go | — | 135 |
| Empire Gardens4246 · Wadi Al Safa 5 · Dubai Land Residence Complex | Empire Gardens Real Estate Development L.L.C | Not started | 0% | Dec 2028 25 mo to go | — | 130 |
| ARLINGTON PARK By MAJID3747 · Wadi Al Safa 5 · Dubai Land Residence Complex | Majid Developments L.L.C | Under construction | 5.7% | Dec 2027 13 mo to go | — | 128 |
| AUM 99 Residences3818 · Wadi Al Safa 5 · Dubai Land Residence Complex | Aum 99 Home Real Estate Developments L.L.C | Not started | 0% | Mar 2029 28 mo to go | — | 123 |
| Bliss Tower3545 · Wadi Al Safa 5 · Dubai Land Residence Complex | Pure Bliss Development L.L.C | Under construction | 92.5% | Dec 2026 1 mo to go | — | 116 |
| Weston4519 · Wadi Al Safa 5 · Dubai Land Residence Complex | Wadan Real Estate Development L.L.C | Not started | 0% | Dec 2028 25 mo to go | — | 115 |
| Rise by Athlon 34046 · Wadi Al Safa 5 | Aurora SPV 3 L.L.C | Not started | 0.5% | Jan 2030 38 mo to go | — | 113 |
| Reef 10003219 · Wadi Al Safa 5 · Dubai Land Residence Complex | Reef Luxury Development L.L.C | Under construction | 67.2% | Dec 2026 1 mo to go | — | 101 |
| Celia Homes4170 · Wadi Al Safa 5 · Dubai Land Residence Complex | Abou Eid Real Estate Development L.L.C | Under construction | 20% | Nov 2027 12 mo to go | — | 101 |
| Haven By Aldar 32875 · Wadi Al Safa 5 | Aurora SPV 1 L.L.C | Under construction | 68.9% | Mar 2028 16 mo to go | — | 100 |
| The Corner2904 · Wadi Al Safa 5 · Dubai Land Residence Complex | Arabian Gulf Properties | Under construction | 37.7% | Jun 2027 7 mo to go | — | 96 |
| Ag Square2424 · Wadi Al Safa 5 · Dubai Land Residence Complex | Ag Properties L.L.C | Under construction | 68.8% | Sep 2026 1 mo past | 1 mo | 95 |
| A 992768 · Wadi Al Safa 5 · Dubai Land Residence Complex | Arabian Gulf Properties | Under construction | 47.8% | Oct 2026 under 1 mo past | — | 89 |
| The Villa685 · Wadi Al Safa 5 · The Villa | Al Mazaya Holding Company | Under construction | 55% | Sep 2013 157 mo past | 157 mo | 88 |
| Cove Living Residence By Imtiaz2973 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Real Estate Investment & Development L.L.C | Under construction | 47.2% | Apr 2027 5 mo to go | — | 88 |
| Rivo4004 · Wadi Al Safa 5 · Dubai Land Residence Complex | Grovy Homes Real Estate Development L.L.C | Under construction | 7% | Dec 2027 13 mo to go | — | 83 |
| Samana Avenue2898 · Wadi Al Safa 5 · Dubai Land Residence Complex | Samana International Real Estate Development L.L.C | Under construction | 31.8% | Dec 2027 13 mo to go | — | 82 |
| Celesto Tower 24440 · Wadi Al Safa 5 · Dubai Land Residence Complex | Tarrad Development L.L.C | Not started | 0% | Jun 2028 19 mo to go | — | 80 |
| Marquis Vista3632 · Wadi Al Safa 5 · Dubai Land Residence Complex | Marquis Home Developer L.L.C | Under construction | 3.5% | Dec 2027 13 mo to go | — | 77 |
| Khk 314153 · Wadi Al Safa 5 · Dubai Land Residence Complex | Khk Realestate Development L.L.C | Under construction | 25.8% | Mar 2027 4 mo to go | — | 73 |
| Cove Edition Residence 1 By Imtiaz3248 · Wadi Al Safa 5 · Dubai Land Residence Complex | Imtiaz Real Estate Investment & Development L.L.C | Under construction | 90.2% | Aug 2026 2 mo past | 2 mo | 71 |
| Coventry Gardens3342 · Wadi Al Safa 5 · Dubai Land Residence Complex | G F S Real Estate L.L.C | Under construction | 1.2% | Mar 2027 4 mo to go | — | 68 |
| Forest City Tower 23727 · Wadi Al Safa 5 · Dubai Land Residence Complex | Al Helal Al Zahaby Real Estate Development L.L.C | Under construction | 1.2% | Jun 2027 7 mo to go | — | 68 |
| Solanki One3776 · Wadi Al Safa 5 · Dubai Land Residence Complex | Solanki Real Estate Development L.L.C | Under construction | 35.2% | May 2028 18 mo to go | — | 67 |
| Saray prime residence4058 · Wadi Al Safa 5 · Dubai Land Residence Complex | Unique Saray Properties L.L.C | Under construction | 2.2% | Oct 2027 11 mo to go | — | 64 |
| Wadi Hills by HRE4100 · Wadi Al Safa 5 · Dubai Land Residence Complex | Wadi Hills City Real Estate Development L.L.C | Under construction | 7.7% | Jan 2028 14 mo to go | — | 59 |
| Rise by Athlon 44047 · Wadi Al Safa 5 | Aurora SPV 3 L.L.C | Under construction | 0.6% | Dec 2029 37 mo to go | — | 57 |
| Verdes by Haven 23189 · Wadi Al Safa 5 | Aurora SPV 1 L.L.C | Under construction | 27.5% | Jun 2028 19 mo to go | — | 56 |
| Time 22541 · Wadi Al Safa 5 · Dubai Land Residence Complex | Time Properties | Under construction | 87.1% | Jun 2026 5 mo past | 5 mo | 54 |
| Beverly Park4009 · Wadi Al Safa 5 · Dubai Land Residence Complex | H M B Homes Real Estate Development | Under construction | 6.8% | Oct 2027 11 mo to go | — | 54 |
| Verdania 23576 · Wadi Al Safa 5 · Dubai Land Residence Complex | OBJ1 Real Estate Development L.L.C | Under construction | 9% | Mar 2027 4 mo to go | — | 52 |
| The Wow Tower4534 · Wadi Al Safa 5 · Dubai Land Residence Complex | Riviera Vista Real Estate Development L.L.C | Not started | 0% | Sep 2029 34 mo to go | — | 47 |
| Samana IVY Gardens2642 · Wadi Al Safa 5 · Dubai Land Residence Complex | Samana International Real Estate Development L.L.C | Under construction | 40.7% | — | — | 46 |
| Dalmore Tower3622 · Wadi Al Safa 5 · Dubai Land Residence Complex | Dalmore Real Estate Development L.L.C | Under construction | 95.1% | Apr 2026 6 mo past | 6 mo | 45 |
| GFS Coventry Gardens II3864 · Wadi Al Safa 5 · Dubai Land Residence Complex | G F S Real Estate Development L.L.C | Under construction | 1.3% | Nov 2027 12 mo to go | — | 45 |
| Arlington Park Ii By Majid4425 · Wadi Al Safa 5 · Dubai Land Residence Complex | Majid Developments L.L.C | Not started | 0% | Apr 2028 17 mo to go | — | 41 |
| 09 Life Residences4250 · Wadi Al Safa 5 · Dubai Land Residence Complex | Deniz Properties L.L.C | Under construction | 6.8% | Dec 2027 13 mo to go | — | 38 |
| Izel By Zoya4386 · Wadi Al Safa 5 · Dubai Land Residence Complex | Zoya One Real Estate Developments L.L.C | Not started | 0% | Sep 2028 22 mo to go | — | 37 |
| Ag 7EVEN2605 · Wadi Al Safa 5 · Dubai Land Residence Complex | Ag Properties L.L.C | Under construction | 93.7% | Mar 2027 4 mo to go | — | 33 |
| Roof Comfort3629 · Wadi Al Safa 5 · Dubai Land Residence Complex | Roof Enterprises And Development CO. L.L.C | Under construction | 50.2% | Dec 2027 13 mo to go | — | 33 |
| Veona by Gutti4001 · Wadi Al Safa 5 · Dubai Land Residence Complex | Gutti Real Estate Development L.L.C | Under construction | 21.7% | Dec 2027 13 mo to go | — | 32 |
| Celesto Tower 34487 · Wadi Al Safa 5 · Dubai Land Residence Complex | Tarrad Development L.L.C | Not started | 0% | Sep 2028 22 mo to go | — | 28 |
| Azra Residence4078 · Wadi Al Safa 5 · Dubai Land Residence Complex | Enaam Properties Development L.L.C | Under construction | 27.5% | Dec 2027 13 mo to go | — | 25 |
| Ag 9INE2847 · Wadi Al Safa 5 · Dubai Land Residence Complex | Ag Properties L.L.C | Under construction | 38.4% | — | — | 16 |
| Havencia4454 · Wadi Al Safa 5 · Dubai Land Residence Complex | Ala Real Estate Developments L.L.C | Not started | 0% | Mar 2028 16 mo to go | — | 16 |
| Lateral One4086 · Wadi Al Safa 5 · Dubai Land Residence Complex | Grand Signature Real Estate Development L.L.C | Under construction | 72.1% | Dec 2026 1 mo to go | — | 13 |
| Bond Living4073 · Wadi Al Safa 5 · Dubai Land Residence Complex | Pearlshire Dirc Real Estate Development L.L.C | Not started | 0% | Sep 2028 22 mo to go | — | 11 |
| Ag Central2422 · Wadi Al Safa 5 · Dubai Land Residence Complex | Ag Properties L.L.C | Under construction | 58.7% | Oct 2026 under 1 mo past | — | 3 |
| The Archive By Imtiaz3781 · Wadi Al Safa 5 · Dubai Land Residence Complex | Rosewell Park Real Estate Development L.L.C | Under construction | 3% | Dec 2028 25 mo to go | — | 3 |
| Verdania 44271 · Wadi Al Safa 5 · Dubai Land Residence Complex | OBJ1 Real Estate Development L.L.C | Not started | 0% | Jun 2028 19 mo to go | — | 3 |
| AL WALEED w.s 13712 · Wadi Al Safa 5 · Dubai Land Residence Complex | Al Waleed Development L.L.C | Under construction | 18.3% | Feb 2027 3 mo to go | — | 2 |
| Arib Collection3815 · Wadi Al Safa 5 · Dubai Land Residence Complex | Arib Properties For Real Estate Development L.L.C | Not started | 0% | Dec 2027 13 mo to go | — | 2 |
| Project 2903, Wadi Al Safa 52903 · Wadi Al Safa 5 · Dubai Land Residence Complex | Arabian Gulf Properties | Pending | 0% | — | — | 0 |
| Project 3413, Wadi Al Safa 53413 · Wadi Al Safa 5 · Dubai Land Residence Complex | Arabian Gulf Properties | Pending | 0% | Feb 2028 15 mo to go | — | 0 |
| Aark Terraces3686 · Wadi Al Safa 5 · Dubai Land Residence Complex | Aark Developers L.L.C | Not started | 0% | Jun 2028 19 mo to go | — | 0 |
| Verdania 33856 · Wadi Al Safa 5 · Dubai Land Residence Complex | OBJ1 Real Estate Development L.L.C | Pending | 0% | Dec 2026 1 mo to go | — | 0 |
| Primrose 14132 · Wadi Al Safa 5 · Dubai Land Residence Complex | Primrose Properties L.L.C | Pending | 45.4% | Apr 2027 5 mo to go | — | 0 |
| Clover4242 · Wadi Al Safa 5 · Dubai Land Residence Complex | R3R Luxe Real Estate Development L.L.C | Pending | 0% | Nov 2028 24 mo to go | — | 0 |
| Project 4283, Wadi Al Safa 54283 · Wadi Al Safa 5 · Dubai Land Residence Complex | Heaven View Real Estate Development L.L.C | Pending | 50.2% | Aug 2028 21 mo to go | — | 0 |
Source: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026.
Units not yet completed, by DLD end year
109 phases| DLD end year | Projects | Units |
|---|---|---|
| 2013 | 1 | 1 |
| 2026 | 13 | 2,331 |
| 2027 | 40 | 9,209 |
| 2028 | 37 | 12,236 |
| 2029 | 10 | 3,860 |
| 2030 | 3 | 1,092 |
| No end date | 5 | 1,396 |
Units · phases. “None”: no DLD end date registered yet. Source: DLD projects register, export of 1 November 2026.
More on Wadi Al Safa 5
Own a unit in one of these projects? Track it free
Area prices
2022-Q1 – 2026-Q4Median AED/sqft of off-plan sales of apartments by quarter in DLD area Wadi Al Safa 5, where most of the community’s projects are registered.
| Quarter | DLD area Wadi Al Safa 5 |
|---|---|
| 2022-Q1 | 824 |
| 2022-Q2 | 800 |
| 2022-Q3 | 800 |
| 2022-Q4 | 800 |
| 2023-Q1 | 861 |
| 2023-Q2 | 860 |
| 2023-Q3 | 949 |
| 2023-Q4 | 865 |
| 2024-Q1 | 969 |
| 2024-Q2 | 1,154 |
| 2024-Q3 | 1,313 |
| 2024-Q4 | 1,305 |
| 2025-Q1 | 1,334 |
| 2025-Q2 | 1,354 |
| 2025-Q3 | 1,466 |
| 2025-Q4 | 1,499 |
| 2026-Q1 | 1,486 |
| 2026-Q2 | 1,497 |
| 2026-Q3 | 1,436 |
| 2026-Q4 | 1,466 |
DLD area Wadi Al Safa 5, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.
Source: Dubai Land Department transactions, on Dubai Data.
Rents in DLD area Wadi Al Safa 5
New Ejari rent contracts for apartments across DLD area Wadi Al Safa 5, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.
| Bedrooms | Median annual rent | New contracts | Change on a year earlier |
|---|---|---|---|
| Studio | AED 40,000 | 918 | +2.6% |
| 1 BR | AED 55,000 | 1,194 | 0% |
| 2 BR | AED 73,000 | 653 | +4.3% |
| 3 BR | AED 100,000 | 63 | -8.6% |
New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.
Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.
Service charges
What owners pay a year in completed buildings of the master communities here, from their owners’ association budgets: one figure per master community, the one with the most projects first.
Median AED per sq ft a year of residential owners’ association budgets, each development counted once, in the newest budget year with at least 10 developments. Plots, shared areas and hotel rooms are left out. A budget is not any one owner’s bill.
Source: Dubai Land Department, owners’ association budgets (service charges).
Registered sales in DLD area Wadi Al Safa 5
The newest home sales DLD has registered in DLD area Wadi Al Safa 5, as DLD publishes them, with the project where DLD names one.
| Date | Project | Market | Type | Size (sqft) | Price (AED) | AED/sqft |
|---|---|---|---|---|---|---|
| 5 November 2026 | Villanova Amaranta | ready | Villa · 4 BR | 2,001 | 3,450,000 | 1,724 |
| 5 November 2026 | Arabian Ranches lll - Ruba | ready | Villa · 3 BR | 1,559 | 3,025,000 | 1,940 |
| 5 November 2026 | Amaranta 2 | ready | Villa · 3 BR | 1,863 | 2,650,000 | 1,422 |
| 5 November 2026 | Arabian Ranches III - JOY | ready | Villa · 3 BR | 1,387 | 2,600,000 | 1,875 |
| 5 November 2026 | Villanova Amaranta B | ready | Villa · 3 BR | 1,731 | 2,600,000 | 1,502 |
| 5 November 2026 | Rivo | off-plan | Apartment · 3 BR | 1,756 | 2,054,800 | 1,170 |
| 5 November 2026 | Weston | off-plan | Apartment · 2 BR | 1,256 | 1,591,382 | 1,267 |
| 5 November 2026 | Roof Comfort | off-plan | Apartment · 2 BR | 1,236 | 1,450,000 | 1,173 |
| 5 November 2026 | Samana Boulevard Heights | off-plan | Apartment · 1 BR | 810 | 1,154,596 | 1,425 |
| 5 November 2026 | Roof Comfort | off-plan | Apartment · 1 BR | 861 | 1,080,000 | 1,254 |
The newest 10 of 8,288 registered sales in the 12 months to 5 November 2026
Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.
Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence
Places inside the community
Places inside the Dubai Municipality outline of the community, by kind.
Metro and tram stations: Roads and Transport Authority (RTA) via Dubai Data. Other places: © OpenStreetMap contributors.
Data: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026; Dubai Municipality community outlines. Methodology