Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

This project is not in the latest DLD projects feed (1 November 2026). The figures below come from the last export that listed it, 1 November 2026. It may have been merged, renumbered or withdrawn.

DLD project no. 3342Under construction97 units

Coventry Gardens حدائق كوفنتري Wadi Al Safa 5 · Dubai Land Residence Complex by G F S Real Estate L.L.CAll phases of Dubai Land Residence Complex 1.2% built (DLD register as of 1 November 2026) DLD end date Mar 2027 4 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
1.2%
DLD register, 1 November 2026
Period elapsed
84%
Dec 2024 → Mar 2027
Latest sales
1,250 AED/sqft
11 sales
1 BR estimate
0.82–0.88 M AED
Automated estimate, not a valuation
Developer
7 projects
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
1.2%Elapsed
84%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 1.2% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 1.2% built on 25 September 2025 (inspections: 2).
Every DLD inspection and every change in the register %, newest first
Date % built Source
25 September 2025 1.2% DLD inspection
30 October 2024 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJun 2025 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 3 November 2022 to 18 February 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 1.2% → 1.2%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3342
Escrow agent
Mashreq Bank PSC
Zoning authority
Dubai Development Authority (DDA)
Master project
Dubai Land Residence Complex
DLD area
Wadi Al Safa 5
Units · villas
97 · 0
Start → DLD end
Dec 2024 → Mar 2027

Description in the DLD register: G+4+Roof.The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,250 AED/sqft
Median of 38 off-plan sales in the 90 days from the first one (Apr 2025)
Latest registered sales
1,250 AED/sqft
Median of 11 home sales in the last 12 months, ready and off-plan
Change
-6.1%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q2 to 2026-Q2: +1.7%.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 33 1,279 (6) Nov 2025 – Nov 2026
1 BR 32 1,081 (5) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q2 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 5, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 5

New Ejari rent contracts for apartments across DLD area Wadi Al Safa 5, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 40,000 918 +2.6%
1 BR AED 55,000 1,194 0%
2 BR AED 73,000 653 +4.3%
3 BR AED 100,000 63 -8.6%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 11 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
1 October 2026off-planApartment · 1 BR 766 670,193 875
29 September 2026off-planApartment · Studio 495 633,088 1,279
25 September 2026off-planApartment · 1 BR 695 875,843 1,260
13 July 2026off-planApartment · Studio 495 633,088 1,279
18 May 2026off-planApartment · Studio 450 598,801 1,331
2 March 2026off-planApartment · 1 BR 788 850,000 1,079
2 March 2026off-planApartment · 1 BR 782 845,000 1,081
20 February 2026off-planApartment · Studio 480 600,000 1,250
16 December 2025off-planApartment · 1 BR 804 962,587 1,197
16 December 2025off-planApartment · Studio 478 615,836 1,288

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Coventry Gardens or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
Studio 580,000 – 610,000 6 sales, 12 months This project
1 BR 820,000 – 880,000 5 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Coventry Gardens? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Mar 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Mar 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Coventry Gardens? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 5 · Dubai Municipality community

Durrah Al Madeena Grocery · 570 mPark · 710 mShams Al Madina · 750 mSupercare · 1 kmCentro Courtyard 11 · 1 kmCentro Courtyard 5 · 1.1 kmGems First Point School (The Villa) · 1.2 kmSilicon Central · 1.3 kmProject location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallSilicon Central · 1.3 km
SupermarketDurrah Al Madeena Grocery · 570 m
HospitalHLG Umar · 2.7 km
SchoolGems First Point School (The Villa) · 1.2 km
ParkPark · 710 m
BeachBeach · 5.1 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 84, with 22,326 units and villas.

2025: 242026: 1,7822027: 7,3192028: 8,2112029: 3,5032030: 565No end date: 922

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 5: 108

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Peace Lagoons by Peace Homes 4.2% Sep 2028 1,410 795
Verdes by Haven 1 17.7% May 2028 1,374 658
Cove Grand Residence by Imtiaz 13.4% Dec 2027 1,531 526
Samana Boulevard Heights 2.5% Dec 2028 1,522 526
La Tilia at Villanova Phase 2 10.6% Aug 2028 1,487 477
La Tilia at Villanova Phase 1 13.8% Aug 2028 1,435 456
Samana IBIZA 5.5% Feb 2028 1,426 444
Samana Parkville 13.9% Sep 2028 1,503 419
Athlon By Al Dar 1 27.3% May 2028 1,574 387
The Boulevard By Prestige One 10.6% Nov 2027 1,359 375
Kensington Gardens 0% Sep 2027 1,354 336
Terra Tower 7.4% Apr 2027 1,550 323

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 5

Developer in DLD data G F S Real Estate L.L.C · DLD developer no. 2053

Projects registered
7
0 completed · 1 under construction · 6 not started
Units delivered
0
1,522 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai Land Residence Complex

DLD lists 118 projects in the master project Dubai Land Residence Complex.

Dalmore TowerUnder construction · 95.1% · Apr 2026
Time 2Under construction · 87.1% · Jun 2026
Weybridge Gardens 3Under construction · 23.9% · Aug 2026
Cove Edition Residence 1 By ImtiazUnder construction · 90.2% · Aug 2026
Ag SquareUnder construction · 68.8% · Sep 2026
Cove Edition Residence 2 By ImtiazUnder construction · 60.1% · Oct 2026
A 99Under construction · 47.8% · Oct 2026
Ag CentralUnder construction · 58.7% · Oct 2026
Bliss TowerUnder construction · 92.5% · Dec 2026
Cove Edition Residence 3 By ImtiazUnder construction · 44% · Dec 2026
Reef 1000Under construction · 67.2% · Dec 2026
Lateral OneUnder construction · 72.1% · Dec 2026

Questions about Coventry Gardens

When is Coventry Gardens's handover?

DLD lists an end date of Mar 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Coventry Gardens past its DLD end date?

No. Its DLD end date is Mar 2027, 4 months after the register of 1 November 2026.

How far along is Coventry Gardens?

1.2% built in the DLD register of 1 November 2026.

Who is the developer of Coventry Gardens?

G F S Real Estate L.L.C, as registered with DLD.

What is the DLD project number of Coventry Gardens?

3342.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error