Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2873Under construction462 units

Haven By Aldar 1 جنان من الدار 1 Wadi Al Safa 5 by Aurora SPV 1 L.L.C 61% built (DLD register as of 1 November 2026) DLD end date Nov 2027 12 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
61%
DLD register, 1 November 2026
Period elapsed
70%
Apr 2024 → Nov 2027
Latest sales
1,514 AED/sqft
30 sales
3 BR estimate
2.90–3.09 M AED
Automated estimate, not a valuation
Developer
5 projects
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
61%Elapsed
70%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 61% built on 1 November 2026 (register readings: 4). Latest DLD inspection: 61% built on 21 October 2026 (inspections: 7).
Every DLD inspection and every change in the register %, newest first
Date % built Source
1 November 2026 61% DLD register
28 October 2026 44.2% DLD register
21 October 2026 61% DLD inspection
28 July 2026 44.2% DLD inspection
13 April 2026 27.6% DLD inspection
4 December 2025 7.9% DLD inspection
26 June 2025 2.5% DLD inspection
11 January 2025 0.7% DLD inspection
12 December 2023 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
5.3 pt/month
44.2% on 28 July 2026 → 61% on 1 November 2026
At the register date
61%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedMay 2025 ± 6 months
Structure risingJan 2026 ± 6 months
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 26 September 2021 to 18 February 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 61% → 61%.
1 Nov 2026Construction completed: 44.2% → 61%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
2873
Escrow agent
First Abu Dhabi Bank P.J.S.C.
Zoning authority
Dubai Development Authority (DDA)
DLD area
Wadi Al Safa 5
Units · villas
0 · 462
Start → DLD end
Apr 2024 → Nov 2027
Registered units3 bed 218 · 4 bed 189 · 5+ bed 55; sizes 2,289–3,341 sqft

Homes: villas 462.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: 37( Villas, (Tectonic), comprising 6BR G+2 villas; 5BR Villas G+1 and 4BR G+1 villas, (G+1) Individual Standard villas in a mix of 3, 4 & 5 Bed units (116 nos.),and Townhouses in 4,5,6 Plexes in a mix of 4 bed end units and 3 bed mid units (309 nos.) The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,373 AED/sqft
Median of 194 off-plan sales in the 90 days from the first one (Mar 2024)
Latest registered sales
1,514 AED/sqft
Median of 30 home sales in the last 12 months, ready and off-plan
Change
+8.9%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (villas), 2024-Q1 to 2026-Q2: +23.4%.

Prices are over villas and townhouses, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
3 BR 1,500 (114) 1,514 (7) +0.9%
Registered sales of villas and townhouses by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
3 BR 90 1,514 (7) May 2026 – Nov 2026
4 BR 56 1,409 (12) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2024-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (villas and townhouses). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 5, median AED/sqft of off-plan sales of villas and townhouses by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 5

New Ejari rent contracts for villas and townhouses across DLD area Wadi Al Safa 5, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
2 BR AED 125,000 64 -6.2%
3 BR AED 155,000 1,266 -6.1%
4 BR AED 210,000 887 0%
5 BR AED 319,541 215 +6.5%
6 BR AED 390,000 21 -2.5%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Service charges

What owners pay a year in completed buildings of the project’s master community, from their owners’ association budgets. A building’s own charge is set by its own budget.

Apartment buildings’ budgets; villa and townhouse budgets are left out.
19.07 AED/sqft a year
Dubai Investment Park: median of 12 developments’ owners’ association budgets, 2026

Median AED per sq ft a year of residential owners’ association budgets, each development counted once, in the newest budget year with at least 10 developments. Plots, shared areas and hotel rooms are left out. A budget is not any one owner’s bill.

Source: Dubai Land Department, owners’ association budgets (service charges).

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 30 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
4 November 2026off-planVilla · 3 BR 2,015 3,050,000 1,514
27 October 2026off-planVilla · 3 BR 1,810 2,809,254 1,552
5 October 2026off-planVilla · 3 BR 1,817 1,361,978 750
29 September 2026off-planVilla · 3 BR 1,895 2,787,030 1,471
21 September 2026off-planVilla · 3 BR 1,818 2,925,000 1,609
3 September 2026off-planVilla · 4 BR 2,713 3,800,000 1,401
13 August 2026off-planVilla · 4 BR 3,384 4,050,000 1,197
6 August 2026off-planVilla · 4 BR 2,824 3,850,000 1,363
24 July 2026off-planVilla · 3 BR 1,810 2,940,000 1,624
7 July 2026off-planVilla · 3 BR 2,090 2,900,000 1,388

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Haven By Aldar 1 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
3 BR 2,900,000 – 3,090,000 18 sales, 12 months This project
4 BR 3,850,000 – 4,190,000 12 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Haven By Aldar 1? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Nov 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Nov 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Haven By Aldar 1? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 5 · Dubai Municipality community

Al Jiva Mini Mart · 790 mDurrah Al Madeena · 890 mKP Mart · 920 mGems First Point School (The Villa) · 930 mCentro Courtyard 10 · 1.2 kmCentro Courtyard 7 · 1.2 kmCentro Courtyard 11 · 1.2 kmApproximate project location© OpenStreetMap contributors · Dubai Municipality · Makani
Approximate project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallDubai Outlet Mall · 2.5 km
SupermarketAl Jiva Mini Mart · 790 m
HospitalHLG Umar · 4.6 km
SchoolGems First Point School (The Villa) · 930 m
ParkCentro Courtyard 10 · 1.2 km
BeachBeach · 7.2 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 59, with 13,228 units and villas.

2013: 02026: 1,7992027: 3,7992028: 4,9652029: 2,031No end date: 634

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 5: 108

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Peace Lagoons by Peace Homes 4.2% Sep 2028 1,410 795
Verdes by Haven 1 17.7% May 2028 1,374 658
Cove Grand Residence by Imtiaz 13.4% Dec 2027 1,531 526
Samana Boulevard Heights 2.5% Dec 2028 1,522 526
La Tilia at Villanova Phase 2 10.6% Aug 2028 1,487 477
La Tilia at Villanova Phase 1 13.8% Aug 2028 1,435 456
Samana IBIZA 5.5% Feb 2028 1,426 444
Samana Parkville 13.9% Sep 2028 1,503 419
Athlon By Al Dar 1 27.3% May 2028 1,574 387
The Boulevard By Prestige One 10.6% Nov 2027 1,359 375
Kensington Gardens 0% Sep 2027 1,354 336
Terra Tower 7.4% Apr 2027 1,550 323

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 5

Developer in DLD data Aurora SPV 1 L.L.C · DLD developer no. 1658

Projects registered
5
0 completed · 5 under construction · 0 not started
Units delivered
0
2,275 in the pipeline
Past the DLD end date
0
of 4 under construction with a DLD end date

Aurora SPV 1 L.L.C is one of 7 DLD-registered developers we list together as Aurora. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Haven By Aldar 1

When is Haven By Aldar 1's handover?

DLD lists an end date of Nov 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Haven By Aldar 1 past its DLD end date?

No. Its DLD end date is Nov 2027, 12 months after the register of 1 November 2026.

How far along is Haven By Aldar 1?

61% built in the DLD register of 1 November 2026.

Who is the developer of Haven By Aldar 1?

Aurora SPV 1 L.L.C, as registered with DLD.

What is the DLD project number of Haven By Aldar 1?

2873.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error