Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2605Under construction234 units

Ag 7EVEN ايه جي 7سيفين Wadi Al Safa 5 · Dubai Land Residence Complex by Ag Properties L.L.CAll phases of Dubai Land Residence Complex 93.7% built (DLD register as of 1 November 2026) DLD end date Mar 2027 4 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
93.7%
DLD register, 1 November 2026
Period elapsed
90%
Mar 2023 → Mar 2027
Latest sales
1,035 AED/sqft
16 sales
Studio estimate
0.42–0.46 M AED
Automated estimate, not a valuation
Developer
4 projects
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
93.7%Elapsed
90%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 93.7% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 93.7% built on 18 June 2026 (inspections: 8).
Every DLD inspection and every change in the register %, newest first
Date % built Source
18 June 2026 93.7% DLD inspection
12 February 2026 85.1% DLD inspection
9 October 2025 63.8% DLD inspection
14 April 2025 51.8% DLD inspection
7 November 2024 40.4% DLD inspection
12 May 2024 18% DLD register, archived export
15 March 2024 17.7% DLD inspection
13 November 2023 14.2% DLD inspection
27 March 2023 1.1% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedFeb 2023 ± 6 months
Structure risingAug 2023 ± 6 months
Topped outJan 2026 ± 6 months
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 27 March 2021 to 18 February 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 93.7% → 93.7%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
2605
Escrow agent
Emirates Nbd Bank (P.J.S.C)
Zoning authority
Dubai Development Authority (DDA)
Master project
Dubai Land Residence Complex
DLD area
Wadi Al Safa 5
Units · villas
234 · 0
Start → DLD end
Mar 2023 → Mar 2027
Registered unitsStudio 156 · 1 bed 26 · 2 bed 52; sizes 385–833 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: One Residential building ( 1B + G + 3P + 13F + R ).The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
955 AED/sqft
Median of 150 off-plan sales in the 90 days from the first one (May 2023)
Latest registered sales
1,035 AED/sqft
Median of 16 home sales in the last 12 months, ready and off-plan
Change
+12.1%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2023-Q2 to 2026-Q2: +17.7%.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 25 1,136 (10) Nov 2025 – Nov 2026
2 BR 6 875 (5) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2023-Q2 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 5, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 5

New Ejari rent contracts for apartments across DLD area Wadi Al Safa 5, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 40,000 918 +2.6%
1 BR AED 55,000 1,194 0%
2 BR AED 73,000 653 +4.3%
3 BR AED 100,000 63 -8.6%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 16 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
2 November 2026off-planApartment · Studio 405 465,000 1,148
9 September 2026off-planApartment · Studio 421 421,260 1,001
13 August 2026off-planApartment · Studio 421 500,000 1,188
27 July 2026off-planApartment · Studio 401 485,000 1,209
8 June 2026off-planApartment · 2 BR 1,053 1,090,000 1,035
19 May 2026off-planApartment · 1 BR 706 635,238 900
11 May 2026off-planApartment · 2 BR 992 867,773 875
10 March 2026off-planApartment · 2 BR 1,053 921,226 875
25 February 2026off-planApartment · Studio 385 460,000 1,195
17 February 2026off-planApartment · Studio 405 450,000 1,111

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Ag 7EVEN or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
Studio 420,000 – 460,000 10 sales, 12 months This project
2 BR 870,000 – 890,000 5 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Ag 7EVEN? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Mar 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Mar 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Ag 7EVEN? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 5 · Dubai Municipality community

Durrah Al Madeena Grocery · 150 mShua Al Madina · 800 mCentro Courtyard 11 · 800 mKP Mart · 810 mGems First Point School (The Villa) · 850 mCentro Courtyard 10 · 970 mCentro Courtyard 5 · 1.1 kmProject location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallSilicon Central · 1.7 km
SupermarketDurrah Al Madeena Grocery · 150 m
HospitalHLG Umar · 2.9 km
SchoolGems First Point School (The Villa) · 850 m
ParkCentro Courtyard 11 · 800 m
BeachBeach · 5.4 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 99, with 24,444 units and villas.

2026: 2,4112027: 8,2732028: 8,7702029: 3,5032030: 565No end date: 922

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 5: 108

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Peace Lagoons by Peace Homes 4.2% Sep 2028 1,410 795
Verdes by Haven 1 17.7% May 2028 1,374 658
Cove Grand Residence by Imtiaz 13.4% Dec 2027 1,531 526
Samana Boulevard Heights 2.5% Dec 2028 1,522 526
La Tilia at Villanova Phase 2 10.6% Aug 2028 1,487 477
La Tilia at Villanova Phase 1 13.8% Aug 2028 1,435 456
Samana IBIZA 5.5% Feb 2028 1,426 444
Samana Parkville 13.9% Sep 2028 1,503 419
Athlon By Al Dar 1 27.3% May 2028 1,574 387
The Boulevard By Prestige One 10.6% Nov 2027 1,359 375
Kensington Gardens 0% Sep 2027 1,354 336
Terra Tower 7.4% Apr 2027 1,550 323

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 5

Developer in DLD data Ag Properties L.L.C · DLD developer no. 1398

Projects registered
4
0 completed · 4 under construction · 0 not started
Units delivered
0
962 in the pipeline
Past the DLD end date
1
of 3 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai Land Residence Complex

DLD lists 118 projects in the master project Dubai Land Residence Complex.

Dalmore TowerUnder construction · 95.1% · Apr 2026
Time 2Under construction · 87.1% · Jun 2026
Weybridge Gardens 3Under construction · 23.9% · Aug 2026
Cove Edition Residence 1 By ImtiazUnder construction · 90.2% · Aug 2026
Ag SquareUnder construction · 68.8% · Sep 2026
Cove Edition Residence 2 By ImtiazUnder construction · 60.1% · Oct 2026
A 99Under construction · 47.8% · Oct 2026
Ag CentralUnder construction · 58.7% · Oct 2026
Bliss TowerUnder construction · 92.5% · Dec 2026
Cove Edition Residence 3 By ImtiazUnder construction · 44% · Dec 2026
Reef 1000Under construction · 67.2% · Dec 2026
Lateral OneUnder construction · 72.1% · Dec 2026

Questions about Ag 7EVEN

When is Ag 7EVEN's handover?

DLD lists an end date of Mar 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Ag 7EVEN past its DLD end date?

No. Its DLD end date is Mar 2027, 4 months after the register of 1 November 2026.

How far along is Ag 7EVEN?

93.7% built in the DLD register of 1 November 2026.

Who is the developer of Ag 7EVEN?

Ag Properties L.L.C, as registered with DLD.

What is the DLD project number of Ag 7EVEN?

2605.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error