Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3004Under construction533 units

Amaal 8 امال 8 Ras Al Khor Industrial First by Amaal Emirates L.L.C 7% built (DLD register as of 1 November 2026) DLD end date Dec 2028 25 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
7%
DLD register, 1 November 2026
Period elapsed
55%
Mar 2024 → Dec 2028
Latest sales
2,240 AED/sqft
262 sales
1 BR estimate
1.72–2.09 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
7%Elapsed
55%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 7% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 11.3% built on 28 October 2026 (inspections: 5).
Every DLD inspection and every change in the register %, newest first
Date % built Source
28 October 2026 11.3% DLD inspection
28 October 2026 7% DLD register
16 July 2026 7% DLD inspection
24 March 2026 5.7% DLD inspection
28 July 2025 1.6% DLD inspection
5 April 2024 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJul 2024 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 14 September 2021 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 7% → 7%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Foundations.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
422840
Issued
20 June 2024
Work start
11 April 2025
Expected completion
31 December 2027
Consultant · contractor
VX STUDIO CONSULTANCY · CITIC MIDDLE EAST CONTRACTING L.L.C
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Foundations1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3004
Escrow agent
Commercial Bank of Dubai(PSC)
Zoning authority
Dubai Municipality
DLD area
Ras Al Khor Industrial First
Units · villas
533 · 0
Start → DLD end
Mar 2024 → Dec 2028
Registered units1 bed 292 · 2 bed 153 · 3 bed 67 · 4 bed 4 · 5+ bed 4; sizes 879–1,532 sqft

Also registered: shops and showrooms 13.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Proposed G+8P+48+Roof Residential Tower

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,961 AED/sqft
Median of 15 off-plan sales in the 90 days from the first one (Jan 2025)
Latest registered sales
2,240 AED/sqft
Median of 262 home sales in the last 12 months, ready and off-plan

Dubai Statistics Center residential price index (flats), 2025-Q1 to 2026-Q2: +2.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 1,944 (13) 2,307 (62) +18.7%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 179 2,307 (62) May 2026 – Nov 2026
2 BR 98 2,462 (17) May 2026 – Nov 2026
3 BR 16 2,332 (5) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Ras Al Khor Industrial First, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Ras Al Khor Industrial First

New Ejari rent contracts for apartments across DLD area Ras Al Khor Industrial First, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 57,225 16 -12%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 262 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
4 November 2026off-planApartment · 1 BR 846 1,774,888 2,098
3 November 2026off-planApartment · 1 BR 890 1,912,888 2,149
2 November 2026off-planApartment · 1 BR 879 2,252,139 2,562
2 November 2026off-planApartment · 1 BR 880 2,030,000 2,307
28 October 2026off-planApartment · 1 BR 755 1,842,888 2,441
23 October 2026off-planApartment · 3 BR 1,986 5,787,888 2,914
23 October 2026off-planApartment · 1 BR 864 1,720,000 1,991
21 October 2026off-planApartment · 1 BR 879 2,085,000 2,372
20 October 2026off-planApartment · 3 BR 1,986 5,700,000 2,870
20 October 2026off-planApartment · 2 BR 1,532 3,963,888 2,587

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Amaal 8 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 1,720,000 – 2,090,000 153 sales, 12 months This project
2 BR 2,590,000 – 3,380,000 91 sales, 12 months This project
3 BR 4,690,000 – 5,790,000 16 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Amaal 8? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2028); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2028
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Amaal 8? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationRas Al Khor Industrial First · Dubai Municipality community

Khalid Abdurdah Grocery · 430 mDelight Grocery · 510 mShabab Al Madina · 640 mProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationCreek Metro Station · Green Metro line · 3.9 km
MallSobha Mall (Under Construction) · 3.4 km
SupermarketKhalid Abdurdah Grocery · 430 m
HospitalBarraquer Eye Hospital · 3.3 km
SchoolSwiss International Scientific School in Dubai · 2.8 km
ParkPark · 2.4 km
BeachBeach · 1.6 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 30, with 12,240 units and villas.

2027: 7412028: 1,5902029: 3,5772030: 3,275No end date: 3,057

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Ras Al Khor Industrial First: 7

Open projects in the same DLD area with a DLD end year from 2027 to 2029, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
The Element at Sobha One 11.1% Dec 2029 2,590 279
Sanctuary by Prestige One 0% Aug 2029 — 5
Everly Place 0% Jun 2029 — 0
Epoque 0% Sep 2029 — 0
Project 4589, Ras Al Khor Industrial First 0% Oct 2029 — 0

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Ras Al Khor Industrial First

Developer in DLD data Amaal Emirates L.L.C · DLD developer no. 1734

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
533 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Amaal 8

When is Amaal 8's handover?

DLD lists an end date of Dec 2028 (register of 1 November 2026); the SPA sets the handover terms.

Is Amaal 8 past its DLD end date?

No. Its DLD end date is Dec 2028, 25 months after the register of 1 November 2026.

How far along is Amaal 8?

7% built in the DLD register of 1 November 2026.

Who is the developer of Amaal 8?

Amaal Emirates L.L.C, as registered with DLD.

What is the DLD project number of Amaal 8?

3004.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error