Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3036Under construction228 units

WAREF residences by sido development وارف ريزيدنس باي سيدو للتطوير Al Barsha South Fourth · Jumeirah Village Circle by Sido Development L.L.CAll phases of Jumeirah Village Circle 81.1% built (DLD register as of 1 November 2026) DLD end date May 2026 past its DLD end date by 6 months DLD register as of 1 November 2026. DLD still lists the project as under construction.

% built
81.1%
DLD register, 1 November 2026
Period elapsed
123%
Feb 2024 → May 2026
Past the DLD end date
6 months
No end-date change in the exports we hold
Developer
1 past end date
of 1 under construction with an end date

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
81.1%Elapsed
123%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 81.1% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 81.1% built on 28 April 2026 (inspections: 6).
Every DLD inspection and every change in the register %, newest first
Date % built Source
28 April 2026 81.1% DLD inspection
11 February 2026 70.8% DLD inspection
27 November 2025 58.3% DLD inspection
22 July 2025 44.4% DLD inspection
18 April 2025 29.7% DLD inspection
3 July 2024 12.4% DLD inspection
12 May 2024 1% DLD register, archived export

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJul 2023 ± 6 months
Structure risingNov 2024 ± 6 months
Topped outNov 2025 ± 6 months
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 14 September 2021 to 7 June 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 81.1% → 81.1%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3036
Escrow agent
First Abu Dhabi Bank P.J.S.C.
Zoning authority
Trakhees
Master project
Jumeirah Village Circle
DLD area
Al Barsha South Fourth
Units · villas
228 · 0
Start → DLD end
Feb 2024 → May 2026
Registered unitsStudio 79 · 1 bed 115 · 2 bed 24; sizes 478–892 sqft

Also registered: shops and showrooms 10.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: G+P+5 Residential & Retail.The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,300 AED/sqft
Median of 56 off-plan sales in the 90 days from the first one (Jun 2025)
Latest registered sales
1,399 AED/sqft
Median of 25 home sales in the last 12 months, ready and off-plan
Change
+14.5%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q2 to 2026-Q2: +1.7%.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 47 1,650 (10) Nov 2025 – Nov 2026
1 BR 48 1,372 (7) Nov 2025 – Nov 2026
2 BR 15 1,112 (8) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q2 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Al Barsha South Fourth, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Al Barsha South Fourth

New Ejari rent contracts for apartments across DLD area Al Barsha South Fourth, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 48,000 5,664 -4%
1 BR AED 70,000 10,046 -2.8%
2 BR AED 100,000 2,701 -4.8%
3 BR AED 145,000 345 +3.6%
4 BR AED 150,000 16 -9.1%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Service charges

What owners pay a year in completed buildings of the project’s master community, from their owners’ association budgets. A building’s own charge is set by its own budget.

Apartment buildings’ budgets; villa and townhouse budgets are left out.
16.31 AED/sqft a year
Jumeirah Village Circle: median of 112 developments’ owners’ association budgets, 2026

Median AED per sq ft a year of residential owners’ association budgets, each development counted once, in the newest budget year with at least 10 developments. Plots, shared areas and hotel rooms are left out. A budget is not any one owner’s bill.

Source: Dubai Land Department, owners’ association budgets (service charges).

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 25 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
5 November 2026off-planApartment · Studio 445 1,940,969 4,362
3 August 2026off-planApartment · Studio 500 850,000 1,700
30 July 2026off-planApartment · 2 BR 1,739 1,933,783 1,112
6 July 2026off-planApartment · 2 BR 1,718 2,000,000 1,164
25 June 2026off-planApartment · 2 BR 1,742 1,915,100 1,099
21 April 2026off-planApartment · 2 BR 1,751 2,013,650 1,150
2 March 2026off-planApartment · 1 BR 818 1,122,033 1,372
27 February 2026off-planApartment · 1 BR 892 1,214,603 1,362
26 February 2026off-planApartment · 2 BR 2,072 2,172,376 1,048
23 February 2026off-planApartment · 2 BR 1,718 1,989,800 1,158

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in WAREF residences by sido development or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
Studio 770,000 – 800,000 10 sales, 12 months This project
1 BR 1,150,000 – 1,180,000 7 sales, 12 months This project
2 BR 1,920,000 – 2,010,000 8 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in WAREF residences by sido development? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (May 2026); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2026
DLD end date has passed
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in WAREF residences by sido development? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationAl Barsha South Fourth · Dubai Municipality community

Circle Mall · 250 mAlL Day · 370 mPark · 440 mZoom · 470 mSelim · 490 mChoithram · 670 mPark · 720 mJSS International School · 920 mSchool · 1.4 kmNord Anglia International School · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationDubai Internet City Metro Station · Red Metro line · 5.6 km
MallCircle Mall · 250 m
SupermarketAlL Day · 370 m
HospitalAmerican · 3.8 km
SchoolJSS International School · 920 m
ParkPark · 440 m
BeachBeach · 7.1 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 91, with 19,044 units and villas.

2010: 02023: 4282024: 2292025: 2,1092026: 3,8312027: 3,2662028: 5,2572029: 1,836No end date: 2,088

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Al Barsha South Fourth: 152

Open projects in the same DLD area with a DLD end year from 2025 to 2027, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Binghatti Circle 22.1% May 2027 1,611 779
Binghatti Amberhall 70% Feb 2026 1,696 623
Binghatti Ruby 65% Feb 2026 1,967 552
Skyhills II by HRE 96% Jun 2026 1,531 481
Skyhills III by HRE 75.7% Jun 2026 1,598 418
Legado By Prescott 23.3% Aug 2027 1,748 342
Violet Tower 90.2% Jun 2026 1,345 285
Maison Elysee Iii By Pantheon 4.4% Oct 2027 1,679 260
The AUTOGRAPH-S Series 18.5% Dec 2027 1,632 252
311 Boulevard by Bam Eskan 10% Oct 2027 1,381 235
Gharbi Ii Residences 14.5% Jul 2027 1,057 225
Allura Residences by Citi Developers 7.8% Jul 2027 1,465 220

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Al Barsha South Fourth

Developer in DLD data Sido Development L.L.C · DLD developer no. 1758

Projects registered
2
0 completed · 1 under construction · 1 not started
Units delivered
0
279 in the pipeline
Past the DLD end date
1
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Jumeirah Village Circle

DLD lists 410 projects in the master project Jumeirah Village Circle.

Luxury Family ResidenceUnder construction · 76% · Dec 2023
North Forty Three Serviced ResidencesUnder construction · 94.7% · Jul 2024
7 Park Central By MeteoraUnder construction · 90.2% · Apr 2025
The PortmanUnder construction · 78.7% · Sep 2025
Serenity Lakes 2Under construction · 50.5% · Nov 2025
Levanto By ORO24Under construction · 66% · Dec 2025
Sky Suites by Peace HomesUnder construction · 55.5% · Dec 2025
Ashton Park Residences The SecondUnder construction · 70.1% · Dec 2025
Maimoon GardensUnder construction · 78% · Dec 2025
99 Park PlaceUnder construction · 90% · Dec 2025
Elitz By DanubeUnder construction · 91.8% · Dec 2025
Q Gardens LoftsUnder construction · 90.7% · Dec 2025

Questions about WAREF residences by sido development

When is WAREF residences by sido development's handover?

DLD lists an end date of May 2026 (register of 1 November 2026); the SPA sets the handover terms.

Is WAREF residences by sido development past its DLD end date?

Yes. Its DLD end date is May 2026, 6 months before the register of 1 November 2026.

How far along is WAREF residences by sido development?

81.1% built in the DLD register of 1 November 2026.

Who is the developer of WAREF residences by sido development?

Sido Development L.L.C, as registered with DLD.

What is the DLD project number of WAREF residences by sido development?

3036.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error