Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2856Under construction148 units

Mallside Residence مول سايد رزيدنس Hadaeq Sheikh Mohammed Bin Rashid · Dubai Hills Estate by Royal Dunes Real Estate Development L.L.CAll phases of Dubai Hills Estate 83.4% built (DLD register as of 1 November 2026) DLD end date Nov 2026 the DLD end date falls in the register month DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
83.4%
DLD register, 1 November 2026
Period elapsed
97%
Aug 2024 → Nov 2026
Latest sales
3,079 AED/sqft
6 sales
1 BR estimate
2.23–2.89 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
83.4%Elapsed
97%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 83.4% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 83.4% built on 10 September 2026 (inspections: 8).
Every DLD inspection and every change in the register %, newest first
Date % built Source
10 September 2026 83.4% DLD inspection
23 June 2026 70.1% DLD inspection
10 February 2026 60.2% DLD inspection
4 November 2025 36.3% DLD inspection
13 June 2025 24.6% DLD inspection
6 February 2025 10.7% DLD inspection
30 September 2024 4.4% DLD inspection
21 November 2023 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
3.1 pt/month
70.1% on 23 June 2026 → 83.4% on 1 November 2026
At the register date
83.4%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedMay 2024 ± 6 months
Structure risingJan 2025 ± 6 months
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 30 April 2022 to 7 June 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 83.4% → 83.4%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
2856
Escrow agent
First Abu Dhabi Bank P.J.S.C.
Zoning authority
Dubai Development Authority (DDA)
Master project
Dubai Hills Estate
DLD area
Hadaeq Sheikh Mohammed Bin Rashid
Units · villas
148 · 0
Start → DLD end
Aug 2024 → Nov 2026
Registered unitsStudio 10 · 1 bed 70 · 2 bed 58 · 3 bed 6; sizes 826–1,184 sqft

Also registered: shops and showrooms 3 · other units 1.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Project contains from Basement+Ground+4 Podiums+18 Floors

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
2,659 AED/sqft
Median of 126 off-plan sales in the 90 days from the first one (Dec 2023)
Latest registered sales
3,079 AED/sqft
Median of 6 home sales in the last 12 months, ready and off-plan
Change
+18.5%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2023-Q4 to 2026-Q2: +15.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 2,599 (63) 3,079 (5) +18.5%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 7 3,079 (5) Nov 2025 – Nov 2026
2 BR 6 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2023-Q4 → 2026-Q2

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Hadaeq Sheikh Mohammed Bin Rashid, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Hadaeq Sheikh Mohammed Bin Rashid

New Ejari rent contracts for apartments across DLD area Hadaeq Sheikh Mohammed Bin Rashid, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 56,000 395 +1.8%
1 BR AED 90,000 1,798 -2.7%
2 BR AED 140,000 1,435 -3.4%
3 BR AED 250,000 324 -9.1%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 6 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
4 May 2026off-planApartment · 1 BR 826 2,891,455 3,501
4 May 2026off-planApartment · 1 BR 826 2,891,455 3,501
18 March 2026off-planApartment · 2 BR 1,119 3,600,000 3,217
5 January 2026off-planApartment · 1 BR 747 2,300,000 3,079
5 January 2026off-planApartment · 1 BR 754 2,250,000 2,984
12 December 2025off-planApartment · 1 BR 933 2,400,000 2,572
30 October 2025off-planApartment · Studio 424 1,169,000 2,757
11 September 2025off-planApartment · 1 BR 751 2,300,000 3,063
13 May 2025off-planApartment · 2 BR 1,119 3,086,600 2,758
18 March 2025off-planApartment · 1 BR 747 2,102,900 2,815

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Mallside Residence or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 2,230,000 – 2,890,000 5 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Mallside Residence? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Nov 2026); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2026
DLD end date has passed
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Mallside Residence? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationHadaeq Sheikh Mohammed Bin Rashid · Dubai Municipality community

Dubai Hills Mall · 310 mDubai Hills Park · 760 mBlackBerry Grocery · 960 mDubai Hills Park · 1.2 kmZoom · 1.5 kmAl Bashra Kindergarten · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationFirst Abu Dhabi Bank Metro Station · Red Metro line · 4.6 km
MallDubai Hills Mall · 310 m
SupermarketBlackBerry Grocery · 960 m
HospitalKings Hospital · 1.9 km
SchoolAl Bashra Kindergarten · 1.5 km
ParkDubai Hills Park · 760 m
BeachBeach · 7.1 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 7, with 3,216 units and villas.

2027: 2392028: 2,3952029: 582No end date: 0

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Hadaeq Sheikh Mohammed Bin Rashid: 25

Open projects in the same DLD area with a DLD end year from 2025 to 2027, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Keturah Reserve 10% Jun 2027 3,682 318
City View Dubai Hills Residences 38.8% Mar 2027 2,800 230
Eden Hills 3.5% Dec 2026 — 153
Soho The Berkeley 46% Oct 2026 — 41
Park Gate 2 55.2% Feb 2027 — 17
Eden House Dubai Hills 0.1% Dec 2027 — 0

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Hadaeq Sheikh Mohammed Bin Rashid

Developer in DLD data Royal Dunes Real Estate Development L.L.C · DLD developer no. 1741

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
148 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai Hills Estate

DLD lists 51 projects in the master project Dubai Hills Estate.

Soho The BerkeleyUnder construction · 46% · Oct 2026
City View Dubai Hills ResidencesUnder construction · 38.8% · Mar 2027
Palace Residences Dubai Hills EstateUnder construction · 50.7% · Apr 2028
Parkside HillsUnder construction · 68.3% · Jun 2028
Park LaneUnder construction · 55.4% · Oct 2028
ParklandUnder construction · 50% · Nov 2028
Club PlaceUnder construction · 68.8% · Dec 2028
Golf HillsideUnder construction · 65.8% · Dec 2028
ParkwoodUnder construction · 15% · Jan 2029
HillsedgeUnder construction · 25.6% · Jan 2029
Address Residences l Dubai Hills EstateUnder construction · 26.5% · Feb 2029
Vida Residences Club PointUnder construction · 43.5% · Feb 2029

Questions about Mallside Residence

When is Mallside Residence's handover?

DLD lists an end date of Nov 2026 (register of 1 November 2026); the SPA sets the handover terms.

Is Mallside Residence past its DLD end date?

Not by that register: its DLD end date, Nov 2026, falls in the month of the register of 1 November 2026.

How far along is Mallside Residence?

83.4% built in the DLD register of 1 November 2026.

Who is the developer of Mallside Residence?

Royal Dunes Real Estate Development L.L.C, as registered with DLD.

What is the DLD project number of Mallside Residence?

2856.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error