DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2754Under construction238 units

Elara إلارا Um Suqaim Third by Jumeirah Hills Development L.L.C 64.3% built (DLD register as of 1 November 2026) DLD end date Nov 2026 the DLD end date falls in the register month DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Madinat Jumeirah waterways with the Burj Al Arab, Umm Suqeim
Area photo: Umm Suqeim, not this project
% built
64.3%
DLD register, 1 November 2026
Period elapsed
98%
Nov 2023 → Nov 2026
Latest sales
2,570 AED/sqft
8 sales
2 BR estimate
3.53–3.80 M AED
Automated estimate, not a valuation
Developer
10 projects
7 completed · 2,184 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
64.3%Elapsed
98%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 64.3% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 64.3% built on 20 July 2026 (inspections: 9).
Every DLD inspection and every change in the register %, newest first
Date % built Source
20 July 2026 64.3% DLD inspection
30 April 2026 53.6% DLD inspection
30 January 2026 40% DLD inspection
22 October 2025 22.1% DLD inspection
31 July 2025 8.4% DLD inspection
7 May 2025 0.6% DLD inspection
25 February 2025 0% DLD inspection
23 September 2024 0% DLD inspection
5 September 2023 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedNov 2023 ± 6 months
Structure risingAug 2025 ± 6 months
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 14 September 2021 to 7 June 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 64.3% → 64.3%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
2754
Escrow agent
First Abu Dhabi Bank P.J.S.C.
Zoning authority
Dubai Development Authority (DDA)
DLD area
Um Suqaim Third
Units · villas
238 · 0
Start → DLD end
Nov 2023 → Nov 2026
Registered units1 bed 106 · 2 bed 105 · 3 bed 23 · 4 bed 3; sizes 729–1,574 sqft

Also registered: shops and showrooms 1.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: The project consists of 3 Residential buildings comprising of 236 units (Total Residential units 234 + 2 Retail units) as follows: Elara 1 - Building A: B+G+9+R (82 Residential units) Elara 2 - Building B: B+G+9+R (64 Residential units + 2 retail units) Elara 3 - Building C: B+G+10+R (88 units)

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
2,907 AED/sqft
Median of 222 off-plan sales in the 90 days from the first one (Dec 2023)
Latest registered sales
2,570 AED/sqft
Median of 8 home sales in the last 12 months, ready and off-plan
Change
+1%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2023-Q4 to 2026-Q2: +15.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
2 BR 2,391 (101) 2,414 (5) +1%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 5 — —
2 BR 8 2,414 (5) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2023-Q4 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Um Suqaim Third, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Um Suqaim Third

New Ejari rent contracts for apartments across DLD area Um Suqaim Third, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 115,000 313 -10.2%
2 BR AED 190,000 194 -11.6%
3 BR AED 275,000 43 -16.7%
4 BR AED 415,000 12 -17%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 8 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
2 November 2026off-planApartment · 2 BR 1,582 3,500,000 2,212
27 October 2026off-planApartment · 2 BR 1,574 3,800,000 2,414
11 May 2026off-planApartment · 2 BR 1,248 3,587,000 2,874
22 January 2026off-planApartment · 1 BR 721 2,533,000 3,513
9 January 2026off-planApartment · 2 BR 1,780 3,650,000 2,051
25 December 2025off-planApartment · 2 BR 1,420 4,050,000 2,852
21 November 2025off-planApartment · 1 BR 963 2,475,000 2,570
10 November 2025off-planApartment · 1 BR 721 2,681,000 3,718
5 May 2025off-planApartment · 2 BR 1,574 3,900,000 2,478
17 March 2025off-planApartment · 2 BR 1,574 3,980,000 2,529

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Elara or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
2 BR 3,530,000 – 3,800,000 5 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Elara? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Nov 2026); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2026
DLD end date has passed
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Elara? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationUmm Suqeim Third · Dubai Municipality community

Kings' Dubai · 520 mRaffles International School · 600 mAswaaq · 700 mThe Emirates Academy Of Hospitality Management · 730 mPark · 930 mSouk Madinat Jumeirah · 940 mPark · 940 mRaffles World Academy · 1 kmThe Mall · 1.1 kmGetchecked Clinic · 1.1 kmFMC medical centre · 1.2 kmBeach · 1.2 kmMall of the Emirates Metro Station · 1.2 kmStandard Medical Clinic · 1.3 kmPark · 1.4 kmFirst Abu Dhabi Bank Metro Station · 1.4 kmWaitrose · 1.5 kmCentre for Musical Arts · 1.5 kmCarrefour · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationMall of the Emirates Metro Station · Red Metro line · 1.2 km
MallSouk Madinat Jumeirah · 940 m
SupermarketAswaaq · 700 m
HospitalGetchecked Clinic · 1.1 km
SchoolKings' Dubai · 520 m
ParkPark · 930 m
BeachBeach · 1.2 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 2, with 480 units and villas.

2029: 236No end date: 244

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Every project in Umm Suqeim Third

Developer in DLD data Jumeirah Hills Development L.L.C · DLD developer no. 1076

Projects registered
10
7 completed · 3 under construction · 0 not started
Units delivered
2,184
718 in the pipeline
Median build time
38 months
completed projects measured: 7
Past the DLD end date
0
of 2 under construction with a DLD end date

Completed a month or more after their DLD end date: 3 of 7 completed projects with both dates. In 3 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Elara

When is Elara's handover?

DLD lists an end date of Nov 2026 (register of 1 November 2026); the SPA sets the handover terms.

Is Elara past its DLD end date?

Not by that register: its DLD end date, Nov 2026, falls in the month of the register of 1 November 2026.

How far along is Elara?

64.3% built in the DLD register of 1 November 2026.

Who is the developer of Elara?

Jumeirah Hills Development L.L.C, as registered with DLD.

What is the DLD project number of Elara?

2754.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error