DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3358Under construction1,628 units

Laguna Residence لاغونا رزيدنس Wadi Al Safa 4 · City Of Arabia by One International Real Estate Development L.L.CAll phases of City Of Arabia 5.7% built (DLD register as of 1 November 2026) DLD end date Dec 2027 13 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Dusk rendering of the two Laguna Residence towers with lit curved balconies beside a lagoon in City of Arabia
Developer's image ONE Development
% built
5.7%
DLD register, 1 November 2026
Period elapsed
61%
Dec 2024 → Dec 2027
Latest sales
1,632 AED/sqft
155 sales
1 BR estimate
1.23–1.36 M AED
Automated estimate, not a valuation
Developer
2 projects
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
5.7%Elapsed
61%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 5.7% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 5.7% built on 13 July 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
13 July 2026 5.7% DLD inspection
6 January 2026 4.6% DLD inspection
4 July 2025 0.1% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedOct 2024 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 23 October 2022 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 5.7% → 5.7%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3358
Escrow agent
First Abu Dhabi Bank P.J.S.C.
Zoning authority
Dubai Development Authority (DDA)
Master project
City Of Arabia
DLD area
Wadi Al Safa 4
Units · villas
1,628 · 0
Start → DLD end
Dec 2024 → Dec 2027
Registered unitsStudio 668 · 1 bed 500 · 2 bed 400 · 3 bed 60; sizes 453–1,156 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: The project consists of two towers with one shared podium featuring G+5 parking and 45 residential floors for each tower. It includes a total of 1,492 residential units, broken down as follows: Studios: 532 1-Bedroom Apartments: 440 2-Bedroom Apartments: 460 3-Bedroom Apartments: 60

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,591 AED/sqft
Median of 90 off-plan sales in the 90 days from the first one (Jan 2025)
Latest registered sales
1,632 AED/sqft
Median of 155 home sales in the last 12 months, ready and off-plan
Change
+6.8%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q1 to 2026-Q2: +2.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
Studio 1,563 (70) 1,686 (45) +7.9%
1 BR 1,585 (17) 1,665 (20) +5%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 234 1,686 (45) May 2026 – Nov 2026
1 BR 71 1,665 (20) May 2026 – Nov 2026
2 BR 54 1,490 (35) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 4, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 4

New Ejari rent contracts for apartments across DLD area Wadi Al Safa 4, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 50,000 20 —
1 BR AED 65,000 39 —
2 BR AED 93,000 18 —

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 155 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
5 November 2026off-planApartment · Studio 454 715,000 1,575
30 October 2026off-planApartment · 2 BR 1,647 2,635,947 1,600
30 October 2026off-planApartment · 1 BR 694 1,000,000 1,441
30 October 2026off-planApartment · Studio 445 722,970 1,625
23 October 2026off-planApartment · Studio 469 822,000 1,753
22 October 2026off-planApartment · Studio 443 876,000 1,977
21 October 2026off-planApartment · 1 BR 711 1,130,585 1,590
15 October 2026off-planApartment · Studio 435 712,899 1,639
1 October 2026off-planApartment · Studio 451 715,852 1,587
29 September 2026off-planApartment · Studio 462 837,271 1,812

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Laguna Residence or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
Studio 690,000 – 780,000 89 sales, 12 months This project
1 BR 1,230,000 – 1,360,000 26 sales, 12 months This project
2 BR 1,530,000 – 2,410,000 39 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Laguna Residence? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Laguna Residence? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 4 · Dubai Municipality community

Zoom Market Al Bararri · 1.4 kmRemal Mall · 1.4 kmSchool · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location Malls and supermarkets Schools and hospitals

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallRemal Mall · 1.4 km
SupermarketZoom Market Al Bararri · 1.4 km
HospitalHLG Umar · 7 km
SchoolSchool · 1.4 km
ParkCourtyard 6 · 2.2 km
BeachBeach · 7.5 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 60, with 25,128 units and villas.

2022: 1202026: 7242027: 12,4202028: 7,0662029: 2,5732030: 1,475No end date: 750

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 4: 23

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Azizi Milan Heights 0% Sep 2028 1,756 829
Distrikt 8.4% Sep 2028 1,984 434
Azizi Milan 20 0% Apr 2027 1,604 394
Azizi Milan 30 0% Apr 2027 1,650 386
Lacina 20.8% Dec 2027 1,958 331
Azizi Milan 55 0% Apr 2027 1,713 248
Arancia Yards By Beyond 0% Oct 2028 — 248
Azizi Milan 51 0% Mar 2027 1,740 221
California Residences 1.7% Apr 2028 1,409 205
Azizi Milan 9 0% May 2027 1,755 179
Azizi Milan 28 0% Jun 2027 1,637 127
Azizi Milan 53 0% Apr 2027 1,719 101

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 4

Developer in DLD data One International Real Estate Development L.L.C · DLD developer no. 2045

Projects registered
2
0 completed · 2 under construction · 0 not started
Units delivered
0
1,748 in the pipeline
Past the DLD end date
1
of 2 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in City Of Arabia

DLD lists 15 projects in the master project City Of Arabia.

Azizi Milan 51Not started · 0% · Mar 2027
Azizi Milan 30Not started · 0% · Apr 2027
Azizi Milan 18Not started · 0% · Apr 2027
Azizi Milan 53Not started · 0% · Apr 2027
Azizi Milan 20Not started · 0% · Apr 2027
Azizi Milan 55Not started · 0% · Apr 2027
Azizi Milan 28Not started · 0% · Jun 2027
Azizi Milan HeightsNot started · 0% · Sep 2028
Arancia Yards By BeyondNot started · 0% · Oct 2028
Project 4479, Wadi Al Safa 4Not started · 0% · Oct 2028
Arancia Yards 2 By BeyondNot started · 0% · Jan 2029
Melograno Yards by BeyondNot started · 0% · Jun 2029

Questions about Laguna Residence

When is Laguna Residence's handover?

DLD lists an end date of Dec 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Laguna Residence past its DLD end date?

No. Its DLD end date is Dec 2027, 13 months after the register of 1 November 2026.

How far along is Laguna Residence?

5.7% built in the DLD register of 1 November 2026.

Who is the developer of Laguna Residence?

One International Real Estate Development L.L.C, as registered with DLD.

What is the DLD project number of Laguna Residence?

3358.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error