DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2694Under construction212 units

California Village كاليفورنيا فيليج Wadi Al Safa 4 by Gfh Real Estate L.L.C 95.1% built (DLD register as of 1 November 2026) DLD end date Jul 2025 past its DLD end date by 15 months DLD register as of 1 November 2026. DLD still lists the project as under construction.

% built
95.1%
DLD register, 1 November 2026
Period elapsed
156%
Mar 2023 → Jul 2025
Past the DLD end date
15 months
No end-date change in the exports we hold
Developer
1 past end date
of 2 under construction with an end date

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
95.1%Elapsed
156%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 95.1% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 95.1% built on 8 May 2026 (inspections: 8).
Every DLD inspection and every change in the register %, newest first
Date % built Source
8 May 2026 95.1% DLD inspection
8 December 2025 93.2% DLD inspection
4 September 2025 79% DLD inspection
21 May 2025 70.3% DLD inspection
10 January 2025 51.5% DLD inspection
12 September 2024 40.2% DLD inspection
12 May 2024 20% DLD register, archived export
14 March 2024 20.3% DLD inspection
13 June 2023 1.4% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedAug 2023 ± 6 months
Structure risingMay 2025 ± 6 months
Topped outDec 2025 ± 6 months
FinishedMar 2026 ± 6 months

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 24 February 2021 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 95.1% → 95.1%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

40 of 40 buildings

Buildings on the project’s plots: 40, on construction permits: 10, as Dubai Municipality lists them.

Furthest stage reached: Work not started.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
40
10 on construction permits
Permit status
Open
318666
Issued
5 November 2017
Consultant · contractor
C V TEC CONSULTING ENGINEERS · DUBAI CIVIL ENGINEERING(LLC)
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Work not started40

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
2694
Escrow agent
Mashreq Bank PSC
Zoning authority
Dubai Development Authority (DDA)
DLD area
Wadi Al Safa 4
Units · villas
0 · 212
Start → DLD end
Mar 2023 → Jul 2025
Registered units3 bed 176 · 4 bed 28 · 5+ bed 8; sizes 3,056–3,128 sqft

Homes: villas 212.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: 208 Townhouses (G+1+R). The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
919 AED/sqft
Median of 136 off-plan sales in the 90 days from the first one (Nov 2023)
Latest registered sales
1,452 AED/sqft
Median of 33 home sales in the last 12 months, ready and off-plan
Change
+62.2%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (villas), 2023-Q4 to 2026-Q2: +29.5%.

Prices are over villas and townhouses, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
3 BR 891 (118) 1,435 (14) +61.1%
Registered sales of villas and townhouses by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
3 BR 44 1,435 (14) May 2026 – Nov 2026
4 BR 9 — —
5 BR 5 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2023-Q4 → 2026-Q4

Median AED/sqft of registered sales per quarter (villas and townhouses). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 4, median AED/sqft of off-plan sales of villas and townhouses by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 4

New Ejari rent contracts for villas and townhouses across DLD area Wadi Al Safa 4, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
3 BR AED 200,000 14 —

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 33 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
12 October 2026readyVilla · 3 BR 3,031 4,400,000 1,452
8 October 2026readyVilla · 3 BR 3,031 4,380,000 1,445
2 October 2026off-planVilla · 3 BR 3,031 4,250,000 1,402
17 September 2026off-planVilla · 3 BR 2,504 3,750,000 1,498
14 September 2026off-planVilla · 3 BR 3,032 4,250,000 1,402
8 September 2026off-planVilla · 3 BR 2,504 3,850,000 1,538
17 August 2026off-planVilla · 3 BR 2,504 3,900,000 1,558
10 August 2026readyVilla · 3 BR 3,031 4,300,000 1,419
5 August 2026off-planVilla · 3 BR 3,031 4,350,000 1,435
5 August 2026off-planVilla · 3 BR 2,504 4,000,000 1,597

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in California Village or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
3 BR 3,850,000 – 4,250,000 24 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in California Village? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Jul 2025); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2026
DLD end date has passed
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in California Village? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 4 · Dubai Municipality community

Spinneys · 540 mSchool · 940 mApproximate project location© OpenStreetMap contributors · Dubai Municipality · Makani
Approximate project location Malls and supermarkets Schools and hospitals

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallRemal Mall · 1.8 km
SupermarketSpinneys · 540 m
HospitalHLG Umar · 8.1 km
SchoolSchool · 940 m
ParkCourtyard 6 · 2.2 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 17, with 9,349 units and villas.

2027: 1,6742028: 4,0582029: 2,536No end date: 1,081

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Every project in Wadi Al Safa 4

Developer in DLD data Gfh Real Estate L.L.C · DLD developer no. 1199

Projects registered
2
0 completed · 2 under construction · 0 not started
Units delivered
0
584 in the pipeline
Past the DLD end date
1
of 2 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about California Village

When is California Village's handover?

DLD lists an end date of Jul 2025 (register of 1 November 2026); the SPA sets the handover terms.

Is California Village past its DLD end date?

Yes. Its DLD end date is Jul 2025, 15 months before the register of 1 November 2026.

How far along is California Village?

95.1% built in the DLD register of 1 November 2026.

Who is the developer of California Village?

Gfh Real Estate L.L.C, as registered with DLD.

What is the DLD project number of California Village?

2694.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error