Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3743Under construction958 units

Chelsea Residences 2 By Damac تشلسي ريزيدنس 2 باي داماك Madinat Dubai Almelaheyah · Dubai Maritime City by Damac Crest Development L.L.CAll phases of Dubai Maritime City 5.4% built (DLD register as of 1 November 2026) DLD end date Dec 2029 37 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Chelsea Residences towers on the waterfront at dusk, Dubai Maritime City, developer render
Developer's image DAMAC Properties
% built
5.4%
DLD register, 1 November 2026
Period elapsed
26%
Sep 2025 → Dec 2029
Latest sales
3,202 AED/sqft
243 sales
1 BR estimate
2.45–2.73 M AED
Automated estimate, not a valuation
Developer
2 projects
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
5.4%Elapsed
26%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 5.4% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 5.4% built on 6 August 2026 (inspections: 4).
Every DLD inspection and every change in the register %, newest first
Date % built Source
6 August 2026 5.4% DLD inspection
9 April 2026 0.7% DLD inspection
5 November 2025 0% DLD inspection
5 May 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 5.4% → 5.4%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3743
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Trakhees
Master project
Dubai Maritime City
DLD area
Madinat Dubai Almelaheyah
Units · villas
958 · 0
Start → DLD end
Sep 2025 → Dec 2029
Registered units1 bed 805 · 2 bed 124 · 3 bed 29; sizes 774–921 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Project consists of G+2P+33 Floors(Tower A) + 30Floors(Tower B) + 33 Floors(Tower C) + Roof, residential building located in Dubai Maritime City, Dubai.The building are designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
3,174 AED/sqft
Median of 494 off-plan sales in the 90 days from the first one (Jul 2025)
Latest registered sales
3,202 AED/sqft
Median of 243 home sales in the last 12 months, ready and off-plan
Change
+0.2%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q3 to 2026-Q2: +0.6%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 3,184 (430) 3,166 (27) -0.6%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 771 3,166 (27) May 2026 – Nov 2026
2 BR 77 2,856 (20) Nov 2025 – Nov 2026
3 BR 28 2,721 (6) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q3 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Madinat Dubai Almelaheyah, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Madinat Dubai Almelaheyah

New Ejari rent contracts for apartments across DLD area Madinat Dubai Almelaheyah, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 65,000 9 +8.3%
1 BR AED 75,000 177 0%
2 BR AED 110,000 196 +2.8%
3 BR AED 148,000 29 +2.8%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 245 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
26 October 2026off-planApartment · 3 BR 2,045 5,690,000 2,782
23 October 2026off-planApartment · 1 BR 1,001 3,132,000 3,129
30 September 2026off-planApartment · 1 BR 774 2,510,640 3,244
25 September 2026off-planApartment · 1 BR 921 2,949,210 3,202
22 September 2026off-planApartment · 2 BR 1,659 4,955,040 2,987
11 September 2026off-planApartment · 1 BR 774 2,406,350 3,109
26 August 2026off-planApartment · 1 BR 921 2,961,000 3,215
21 August 2026off-planApartment · 2 BR 1,158 3,439,680 2,970
21 August 2026off-planApartment · 1 BR 777 2,416,800 3,110
12 August 2026off-planApartment · 1 BR 921 2,992,000 3,249

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Chelsea Residences 2 By Damac or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 2,450,000 – 2,730,000 329 sales, 12 months This project
2 BR 4,260,000 – 4,770,000 51 sales, 12 months This project
3 BR 5,450,000 – 5,690,000 15 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Chelsea Residences 2 By Damac? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2029); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2029
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Chelsea Residences 2 By Damac? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationMadinat Dubai Al Melaheyah · Dubai Municipality community

Project location

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationAl Ghubaiba Metro Station · Green Metro line · 3.3 km
MallCity Centre Al Shindagha · 3.2 km
HospitalAster Medical Centre (Aster Jubilee Medical Complex) · 4 km
BeachBeach · 3.4 km

Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 16, with 6,328 units and villas.

2026: 7772027: 8312028: 1,8092029: 1,199No end date: 1,712

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Madinat Dubai Al Melaheyah: 47

Open projects in the same DLD area with a DLD end year from 2028 to 2030, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Breez by Danube 0.1% Jun 2029 3,497 945
Franck Muller Yachting 0% Jul 2028 2,560 566
Chelsea Residences By Damac 5.2% Dec 2029 3,148 396
Kanyon By Beyond 0% Sep 2028 2,886 340
Talea 0% Jun 2028 2,966 329
Baystar by VIDA 6.3% Dec 2029 3,670 284
Sensia 17.5% Mar 2029 — 272
The Mural 16.6% Jul 2028 5,056 269
Liv Maritime 28.1% Dec 2028 2,761 247
Soulever' By Beyond 0% Dec 2028 3,731 233
Marina Place 2 1.5% Dec 2028 — 183
Marina Place 1 4.2% Dec 2028 — 163

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Madinat Dubai Al Melaheyah

Developer in DLD data Damac Crest Development L.L.C · DLD developer no. 2117

Projects registered
2
0 completed · 2 under construction · 0 not started
Units delivered
0
1,661 in the pipeline
Past the DLD end date
0
of 2 under construction with a DLD end date

Damac Crest Development L.L.C is one of 21 DLD-registered developers we list together as Damac. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai Maritime City

DLD lists 28 projects in the master project Dubai Maritime City.

Aria By BeyondUnder construction · 84.9% · Jan 2026
Mar CasaUnder construction · 56.5% · Oct 2026
The PierUnder construction · 48.4% · Dec 2026
Harbour LightsUnder construction · 64.3% · May 2027
SariaUnder construction · 31% · Oct 2027
OriseUnder construction · 17.6% · Nov 2027
The MuralUnder construction · 16.6% · Jul 2028
31 Above By BeyondUnder construction · 0.5% · Dec 2028
Liv MaritimeUnder construction · 28.1% · Dec 2028
SensiaUnder construction · 17.5% · Mar 2029
Il VentoUnder construction · 1.2% · Sep 2029
Chelsea Residences By DamacUnder construction · 5.2% · Dec 2029

Questions about Chelsea Residences 2 By Damac

When is Chelsea Residences 2 By Damac's handover?

DLD lists an end date of Dec 2029 (register of 1 November 2026); the SPA sets the handover terms.

Is Chelsea Residences 2 By Damac past its DLD end date?

No. Its DLD end date is Dec 2029, 37 months after the register of 1 November 2026.

How far along is Chelsea Residences 2 By Damac?

5.4% built in the DLD register of 1 November 2026.

Who is the developer of Chelsea Residences 2 By Damac?

Damac Crest Development L.L.C, as registered with DLD.

What is the DLD project number of Chelsea Residences 2 By Damac?

3743.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error