Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2801Under construction404 units

Damac Casa داماك كازا Al Safouh Second · Site A by Aqua Viridis Investment L.L.CAll phases of Site A 33.6% built (DLD register as of 1 November 2026) no DLD end date registered DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
33.6%
DLD register, 1 November 2026
Latest sales
3,005 AED/sqft
33 sales
1 BR estimate
2.30–2.75 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built

1 November 2026
Built
33.6%
Latest DLD register reading: 33.5% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 33.5% built on 18 August 2026 (inspections: 8).
Every DLD inspection and every change in the register %, newest first
Date % built Source
18 August 2026 33.5% DLD inspection
21 April 2026 25.8% DLD inspection
22 December 2025 19.5% DLD inspection
20 August 2025 11.8% DLD inspection
10 April 2025 7.4% DLD inspection
27 December 2024 3.9% DLD inspection
20 May 2024 0.1% DLD inspection
28 September 2023 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJul 2023 ± 6 months
Structure risingNov 2025 ± 6 months
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 14 September 2021 to 7 June 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 33.6% → 33.5%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
2801
Escrow agent
Abu Dhabi Islamic Bank
Zoning authority
Dubai Development Authority (DDA)
Master project
Site A
DLD area
Al Safouh Second
Units · villas
404 · 0
Start → DLD end
Dec 2023 → —
Registered units1 bed 212 · 2 bed 96 · 3 bed 90 · 4 bed 4; sizes 941–1,860 sqft

Also registered: shops and showrooms 2.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: 2B+G+2P+42F+1MECH+R Residential, The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
3,205 AED/sqft
Median of 262 off-plan sales in the 90 days from the first one (Dec 2023)
Latest registered sales
3,005 AED/sqft
Median of 33 home sales in the last 12 months, ready and off-plan
Change
-10.1%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2023-Q4 to 2026-Q2: +15.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 3,257 (172) 2,643 (5) -18.9%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 20 2,643 (5) May 2026 – Nov 2026
2 BR 19 2,601 (11) Nov 2025 – Nov 2026
3 BR 29 3,045 (15) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2023-Q4 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Al Safouh Second, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Al Safouh Second

New Ejari rent contracts for apartments across DLD area Al Safouh Second, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 145,000 31 +3.6%
2 BR AED 180,000 27 -12.2%
3 BR AED 190,000 17 -29.6%
4 BR AED 750,000 25 -6.2%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 34 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
27 October 2026off-planApartment · 1 BR 473 1,250,000 2,643
15 October 2026off-planApartment · 3 BR 2,969 10,195,440 3,434
14 October 2026off-planApartment · 2 BR 1,860 4,837,000 2,601
2 September 2026off-planApartment · 3 BR 2,062 5,846,300 2,835
4 August 2026off-planApartment · 1 BR 945 2,316,000 2,451
3 August 2026off-planApartment · 1 BR 808 2,690,000 3,329
30 June 2026off-planApartment · 2 BR 1,857 5,148,920 2,773
23 June 2026off-planApartment · 1 BR 1,075 3,435,000 3,195
22 June 2026off-planApartment · 3 BR 3,382 12,636,000 3,736
16 June 2026off-planApartment · 1 BR 941 2,300,000 2,444

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Damac Casa or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 2,300,000 – 2,750,000 8 sales, 12 months This project
2 BR 3,700,000 – 4,840,000 11 sales, 12 months This project
3 BR 5,880,000 – 6,500,000 14 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Portal asking median for off-plan units here: 3,123 AED/sqft (57 asks, last 30 days), against 2,835 AED/sqft in the latest registered sales.

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Damac Casa? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. DLD has no end date for this project, so handover starts a year from now; move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Nov 2027
No end date registered
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Damac Casa? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationAl Safouh Second · Dubai Municipality community

Palm Jumeirah · 100 mPark · 110 mPark · 170 mPark · 370 mMedia City · 500 mWelcare Hospital · 670 mBake Mart Plus · 730 mBeach · 730 mICCA Dubai · 800 mBeach · 820 mNakheel Metro Station · 970 mCarry Food · 990 mzoom · 990 mPremier Genie · 1 kmCoventry University UAE Regional Hub · 1.1 kmMall · 1.3 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationNakheel Metro Station · Red Metro line · 970 m
Tram stopPalm Jumeirah · Tram line · 100 m
MallMall · 1.3 km
SupermarketBake Mart Plus · 730 m
HospitalWelcare Hospital · 670 m
SchoolICCA Dubai · 800 m
ParkPark · 110 m
BeachBeach · 730 m

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 18, with 7,488 units and villas.

2025: 4412026: 1,5302027: 2,5962028: 1,3762029: 229No end date: 1,316

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Al Safouh Second: 2

Open projects in the same DLD area, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Iconic 34.9% Feb 2028 3,746 166
Cavalli Casa Tower 85.1% Sep 2025 2,722 71

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Al Safouh Second

Developer in DLD data Aqua Viridis Investment L.L.C · DLD developer no. 1637

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
404 in the pipeline

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Site A

DLD lists 3 projects in the master project Site A.

Cavalli Casa TowerUnder construction · 85.1% · Sep 2025
IconicUnder construction · 34.9% · Feb 2028
The S TowerCompleted · 100% · Feb 2026

Questions about Damac Casa

When is Damac Casa's handover?

DLD lists no end date for it (register of 1 November 2026); the SPA sets the handover terms.

How far along is Damac Casa?

33.6% built in the DLD register of 1 November 2026.

Who is the developer of Damac Casa?

Aqua Viridis Investment L.L.C, as registered with DLD.

What is the DLD project number of Damac Casa?

2801.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error