Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3875Under construction

Grand Polo - Selvara 4 جراند بولو- سيلفارا 4 Dubai Investment Park Second by Emaar Development P.J.S.C. 2.9% built (DLD register as of 1 November 2026) DLD end date May 2029 30 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
2.9%
DLD register, 1 November 2026
Period elapsed
28%
Nov 2025 → May 2029
Latest sales
—
Fewer than 5 recent sales
Developer
110 projects
58 completed · 22,947 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
2.9%Elapsed
28%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 2.9% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 2.9% built on 6 May 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
6 May 2026 2.9% DLD inspection
26 January 2026 1.2% DLD inspection
14 July 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedNot seen yet
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 28 April 2023 to 2 July 2025; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 2.9% → 2.9%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

3 of 31 buildings

Buildings on the project’s plots: 31, on construction permits: 31, as Dubai Municipality lists them.

Furthest stage reached: Work not started.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
31
31 on construction permits
Permit status
Open
469478
Issued
24 August 2026
Consultant · contractor
BH NS ENGINEERING CONSULTANTS L.L.C · KUZU TOPLU KONUT INSAAT ANONIM SIRKETI - DUBAI BRANCH
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Work not started3
No stage listed28

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3875
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai Municipality
DLD area
Dubai Investment Park Second
Units · villas
0 · 0
Start → DLD end
Nov 2025 → May 2029
Registered units4 bed 173; sizes 3,799–3,832 sqft

Homes: villas 173.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Residential development consisting of 173 villas (G+2)

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

No off-plan sales are registered for this project since 2020, so there is no launch price.

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Rents in DLD area Dubai Investment Park Second

New Ejari rent contracts for apartments across DLD area Dubai Investment Park Second, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 40,000 427 +11.1%
1 BR AED 60,000 306 +9.1%
2 BR AED 85,000 105 +6.3%
3 BR AED 135,000 9 -3.6%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Service charges

What owners pay a year in completed buildings of the project’s master community, from their owners’ association budgets. A building’s own charge is set by its own budget.

Apartment buildings’ budgets; villa and townhouse budgets are left out.
19.07 AED/sqft a year
Dubai Investment Park: median of 12 developments’ owners’ association budgets, 2026

Median AED per sq ft a year of residential owners’ association budgets, each development counted once, in the newest budget year with at least 10 developments. Plots, shared areas and hotel rooms are left out. A budget is not any one owner’s bill.

Source: Dubai Land Department, owners’ association budgets (service charges).

Looking for a unit in this or similar projects?

Tell us what you are looking for in Grand Polo - Selvara 4 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Not enough registered off-plan sales for an estimate (at least 5 of one bedroom count in 12 months).

Automated estimate, not a valuation

Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Grand Polo - Selvara 4? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (May 2029); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
May 2029
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Grand Polo - Selvara 4? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationDubai Investment Park Second · Dubai Municipality community

Approximate project location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Approximate project location

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationEXPO Metro Station · Red Metro line · 8.6 km
MallRijat Retail Mall-12 · 3.4 km
SupermarketAndy Mannhart Co. · 2.3 km
HospitalNMC dip · 8.6 km
ParkMag 5 Park area · 2.1 km

Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 25, with 6,391 units and villas.

2027: 02028: 1,2682029: 5,123

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Dubai Investment Park Second: 30

Open projects in the same DLD area with a DLD end year from 2028 to 2030, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Damac Riverside Views - Capri 1 8.2% Mar 2029 1,456 805
Damac Riverside Views - Azure 2 5.8% Mar 2029 1,427 695
Grand Polo - Equiterra 0.8% Aug 2029 1,618 510
Damac Riverside Views - Capri 2 8.3% Mar 2029 1,495 475
Damac Riverside Views - Royal 3&4 13.4% Mar 2029 1,536 449
Damac Riverside Views - Indigo 1 12.1% Mar 2029 1,450 439
Grand Polo - Equiterra 2 1% Jul 2029 — 380
Damac Riverside Views - Indigo 2 12% Mar 2029 1,480 346
Grand Polo - Equestra 1% Aug 2029 2,323 309
Damac Riverside Views - Marine 2 12% May 2028 1,437 279
Damac Riverside Views - Marine 1 11.8% May 2028 1,476 275
Damac Riverside Views - Marine 3 18.2% May 2028 1,422 267

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Dubai Investment Park Second

Developer in DLD data Emaar Development P.J.S.C. · DLD developer no. 1211

Projects registered
110
58 completed · 44 under construction · 8 not started
Units delivered
22,947
12,652 in the pipeline
Median build time
40 months
completed projects measured: 58
Past the DLD end date
0
of 41 under construction with a DLD end date

Completed a month or more after their DLD end date: 0 of 57 completed projects with both dates. In 38 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Emaar Development P.J.S.C. is one of 7 DLD-registered developers we list together as Emaar. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Grand Polo - Selvara 4

When is Grand Polo - Selvara 4's handover?

DLD lists an end date of May 2029 (register of 1 November 2026); the SPA sets the handover terms.

Is Grand Polo - Selvara 4 past its DLD end date?

No. Its DLD end date is May 2029, 30 months after the register of 1 November 2026.

How far along is Grand Polo - Selvara 4?

2.9% built in the DLD register of 1 November 2026.

Who is the developer of Grand Polo - Selvara 4?

Emaar Development P.J.S.C., as registered with DLD.

What is the DLD project number of Grand Polo - Selvara 4?

3875.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error