Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4057Under construction109 units

Helvetia Verde هيلفيتيا فيردي Bukadra by D H G Property Development L.L.C 0.6% built (DLD register as of 1 November 2026) DLD end date Nov 2027 12 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
0.6%
DLD register, 1 November 2026
Period elapsed
44%
Jan 2026 → Nov 2027
Latest sales
1,849 AED/sqft
11 sales
1 BR estimate
1.59–1.66 M AED
Automated estimate, not a valuation
Developer
3 projects
1 completed · 432 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
0.6%Elapsed
44%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 0.6% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 0.6% built on 6 July 2026 (inspections: 2).
Every DLD inspection and every change in the register %, newest first
Date % built Source
6 July 2026 0.6% DLD inspection
27 August 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedDec 2025 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 8 November 2023 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 0.6% → 0.6%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Site works.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
458927
Issued
5 November 2025
Work start
15 May 2026
Expected completion
14 July 2026
Consultant · contractor
NATIONAL ENGINEERING BUREAU
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Site works1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
4057
Escrow agent
Abu Dhabi Islamic Bank
Zoning authority
Dubai Municipality
DLD area
Bukadra
Units · villas
109 · 0
Start → DLD end
Jan 2026 → Nov 2027
Registered units1 bed 63 · 2 bed 39 · 3 bed 6; sizes 890–1,220 sqft

Also registered: shops and showrooms 1.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: G+2P+17+R w/ retail at ground

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

Fewer than 5 home sales after the launch window in the last 12 months, so no comparison is shown.

Dubai Statistics Center residential price index (flats), 2025-Q4 to 2026-Q2: -0.9%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 1,849 (6) 1,849 (9) 0%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 9 1,849 (9) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q4 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Bukadra, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Bukadra

New Ejari rent contracts for apartments across DLD area Bukadra, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
2 BR AED 110,000 13 -4.3%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 11 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
2 November 2026off-planApartment · 1 BR 854 1,550,000 1,815
28 October 2026off-planApartment · 2 BR 1,227 2,216,502 1,806
3 August 2026off-planApartment · 1 BR 890 1,869,000 2,100
15 July 2026off-planApartment · 1 BR 889 1,622,990 1,826
25 February 2026off-planApartment · 1 BR 890 1,646,026 1,849
23 December 2025off-planApartment · 1 BR 919 1,660,644 1,807
23 December 2025off-planApartment · 1 BR 854 1,569,951 1,838
17 December 2025off-planApartment · 2 BR 1,219 2,255,000 1,850
17 December 2025off-planApartment · 1 BR 854 1,688,546 1,977
17 December 2025off-planApartment · 1 BR 907 1,677,290 1,849

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Helvetia Verde or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 1,590,000 – 1,660,000 9 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Helvetia Verde? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Nov 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Nov 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Helvetia Verde? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationBu Kadra · Dubai Municipality community

Liv minimart · 910 mBradosti Trading · 950 mDelight Grocery · 950 mEden Park · 1.1 kmCentral Park · 1.3 kmPark · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationCreek Metro Station · Green Metro line · 4.8 km
MallSobha Mall (Under Construction) · 2.1 km
SupermarketLiv minimart · 910 m
HospitalHospital · 2.6 km
SchoolNorth London Collegiate School · 1.6 km
ParkEden Park · 1.1 km
BeachBeach · 1.9 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 50, with 20,149 units and villas.

2025: 4552027: 4,7552028: 3,7412029: 3,1762030: 3,275No end date: 4,747

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Bu Kadra: 31

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Claydon House By Ellington 15.7% Dec 2027 2,008 400
Parkway By Prestige One 10.9% Jan 2028 1,955 263
The Highgrove 7% Dec 2028 2,453 229
Belmore Residences 6.5% Dec 2027 2,211 181
Wynwood Horizon by Imtiaz 9.6% Oct 2028 2,319 131
The Caden By Prescott 0.5% May 2028 2,279 107
Riverton House 0% Dec 2027 — 75
Future Residence 0% Jun 2027 1,956 72
The Waterway by Prestige One 14.7% Jun 2027 1,864 60
Sobha Estates 68.5% Dec 2027 — 50
Ayaan Heights I 20.3% Mar 2028 2,219 43
Al Vista 9.5% Oct 2027 — 3

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Bu Kadra

Developer in DLD data D H G Property Development L.L.C · DLD developer no. 1619

Projects registered
3
1 completed · 1 under construction · 1 not started
Units delivered
432
172 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Helvetia Verde

When is Helvetia Verde's handover?

DLD lists an end date of Nov 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Helvetia Verde past its DLD end date?

No. Its DLD end date is Nov 2027, 12 months after the register of 1 November 2026.

How far along is Helvetia Verde?

0.6% built in the DLD register of 1 November 2026.

Who is the developer of Helvetia Verde?

D H G Property Development L.L.C, as registered with DLD.

What is the DLD project number of Helvetia Verde?

4057.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error