Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3098Under construction415 units

Claydon House By Ellington كلايدون هاوس من إلينغتون Bukadra by E L P D Developers L.L.C 15.7% built (DLD register as of 1 November 2026) DLD end date Dec 2027 13 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Claydon House tower, Mohammed Bin Rashid City, developer render
Developer's image Ellington Properties
% built
15.7%
DLD register, 1 November 2026
Period elapsed
68%
May 2024 → Dec 2027
Latest sales
2,008 AED/sqft
43 sales
1 BR estimate
1.53–1.68 M AED
Automated estimate, not a valuation
Developer
2 projects
1 completed · 171 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
15.7%Elapsed
68%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 15.7% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 15.7% built on 6 August 2026 (inspections: 5).
Every DLD inspection and every change in the register %, newest first
Date % built Source
6 August 2026 15.7% DLD inspection
13 April 2026 9.7% DLD inspection
13 November 2025 7.2% DLD inspection
30 June 2025 4.1% DLD inspection
23 May 2024 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJan 2025 ± 6 months
Structure risingMar 2026 ± 6 months
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 30 April 2022 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 15.7% → 15.7%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Masonry.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
422327
Issued
8 July 2024
Work start
3 February 2025
Expected completion
30 November 2028
Consultant · contractor
GULF ENGINEERING & CONSULTANTS · BELGRAVIA CONTRACTING COMPANY L.L.C
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Masonry1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3098
Escrow agent
First Abu Dhabi Bank P.J.S.C.
Zoning authority
Dubai Municipality
DLD area
Bukadra
Units · villas
415 · 0
Start → DLD end
May 2024 → Dec 2027
Registered units1 bed 235 · 2 bed 132 · 3 bed 26 · 4 bed 14; sizes 788–1,241 sqft

Also registered: shops and showrooms 8.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Residential Building :UG+ Ground Floor + 5 Podium + 38 Floors.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
2,001 AED/sqft
Median of 287 off-plan sales in the 90 days from the first one (Nov 2024)
Latest registered sales
2,008 AED/sqft
Median of 43 home sales in the last 12 months, ready and off-plan
Change
+1.6%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2024-Q4 to 2026-Q2: +5.5%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 2,010 (168) 2,030 (12) +1%
2 BR 1,954 (93) 1,973 (8) +1%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 233 2,030 (12) May 2026 – Nov 2026
2 BR 133 1,973 (8) May 2026 – Nov 2026
3 BR 24 — —
4 BR 10 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Skyline Index

Registered sale prices, rents and yields for Claydon House By Ellington, from DLD records.

Claydon House By Ellington: registered prices and rents on Skyline Index ↗

Median AED/sqft by quarter

2024-Q4 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Bukadra, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Bukadra

New Ejari rent contracts for apartments across DLD area Bukadra, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
2 BR AED 110,000 13 -4.3%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 43 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
14 October 2026off-planApartment · 2 BR 1,241 2,448,828 1,973
9 October 2026off-planApartment · 2 BR 1,294 2,476,828 1,914
9 October 2026off-planApartment · 2 BR 1,231 2,317,828 1,883
7 October 2026off-planApartment · 2 BR 1,241 2,599,828 2,095
7 October 2026off-planApartment · 2 BR 1,236 2,246,828 1,818
24 September 2026off-planApartment · 2 BR 1,236 3,219,828 2,605
23 September 2026off-planApartment · 1 BR 788 1,751,828 2,223
23 September 2026off-planApartment · 1 BR 810 1,673,828 2,066
23 September 2026off-planApartment · 1 BR 829 1,601,828 1,932
8 September 2026off-planApartment · 1 BR 768 1,500,000 1,953

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Claydon House By Ellington or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 1,530,000 – 1,680,000 27 sales, 12 months This project
2 BR 2,430,000 – 2,600,000 15 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Claydon House By Ellington? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Claydon House By Ellington? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationBu Kadra · Dubai Municipality community

Liv minimart · 760 mBradosti Trading · 810 mEden Park · 810 mMOUNT WAY MINIMART · 910 mCentral Park · 1 kmPark · 1.2 kmNorth London Collegiate School · 1.3 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationCreek Metro Station · Green Metro line · 4.8 km
MallSobha Mall (Under Construction) · 1.8 km
SupermarketLiv minimart · 760 m
HospitalHospital · 2.7 km
SchoolNorth London Collegiate School · 1.3 km
ParkEden Park · 810 m
BeachBeach · 1.7 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 48, with 17,415 units and villas.

2025: 4552027: 2,5712028: 3,2082029: 3,1762030: 2,916No end date: 5,089

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Bu Kadra: 31

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Parkway By Prestige One 10.9% Jan 2028 1,955 263
The Highgrove 7% Dec 2028 2,453 229
Belmore Residences 6.5% Dec 2027 2,211 181
Wynwood Horizon by Imtiaz 9.6% Oct 2028 2,319 131
The Caden By Prescott 0.5% May 2028 2,279 107
Riverton House 0% Dec 2027 — 75
Future Residence 0% Jun 2027 1,956 72
The Waterway by Prestige One 14.7% Jun 2027 1,864 60
Sobha Estates 68.5% Dec 2027 — 50
Ayaan Heights I 20.3% Mar 2028 2,219 43
Helvetia Verde 0.6% Nov 2027 — 11
Al Vista 9.5% Oct 2027 — 3

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Bu Kadra

Developer in DLD data E L P D Developers L.L.C · DLD developer no. 1687

Projects registered
2
1 completed · 1 under construction · 0 not started
Units delivered
171
415 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Claydon House By Ellington

When is Claydon House By Ellington's handover?

DLD lists an end date of Dec 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Claydon House By Ellington past its DLD end date?

No. Its DLD end date is Dec 2027, 13 months after the register of 1 November 2026.

How far along is Claydon House By Ellington?

15.7% built in the DLD register of 1 November 2026.

Who is the developer of Claydon House By Ellington?

E L P D Developers L.L.C, as registered with DLD.

What is the DLD project number of Claydon House By Ellington?

3098.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error