Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3389Under construction193 units

Mirdif Hills - Asayel Avenue مردف هيلز - اصايل افنيو Mirdif by Dubai Investment Real Estate (L L C)All phases of Mirdif Hills 33.1% built (DLD register as of 1 November 2026) DLD end date May 2027 6 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Aerial view of the low-rise villas of Mirdif
Area photo: Mirdif, not this project Photo: Subhashish PanigrahiCC BY-SA 4.0
% built
33.1%
DLD register, 1 November 2026
Period elapsed
75%
May 2025 → May 2027
Latest sales
1,350 AED/sqft
54 sales
2 BR estimate
1.87–2.10 M AED
Automated estimate, not a valuation
Developer
7 projects
4 completed · 2,321 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
33.1%Elapsed
75%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 33.1% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 33.1% built on 8 May 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
8 May 2026 33.1% DLD inspection
6 March 2026 24.7% DLD inspection
12 November 2024 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 33.1% → 33.1%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Finishes.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
343595
Issued
14 April 2025
Work start
28 May 2025
Expected completion
27 May 2027
Consultant · contractor
A 2 Z ARCHITECTURAL ENGINEERING CONSULTANCIES L.L.C · PARAMOUNT INTERNATIONAL CONTRACTING (LLC)
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Finishes1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3389
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai Municipality
DLD area
Mirdif
Units · villas
193 · 0
Start → DLD end
May 2025 → May 2027
Registered units1 bed 9 · 2 bed 151 · 3 bed 33; sizes 1,403–1,699 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Basement Parking Floor and Ground floor Residential and Amenities and 4 typical residential floors and roof services and residential floor,The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,350 AED/sqft
Median of 45 off-plan sales in the 90 days from the first one (Jul 2025)
Latest registered sales
1,350 AED/sqft
Median of 54 home sales in the last 12 months, ready and off-plan
Change
0%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q3 to 2026-Q2: +0.6%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
2 BR 1,350 (26) 1,323 (12) -2%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
2 BR 72 1,323 (12) May 2026 – Nov 2026
3 BR 33 1,350 (9) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q3 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Mirdif, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Mirdif

New Ejari rent contracts for apartments across DLD area Mirdif, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 48,000 111 +2.1%
1 BR AED 62,000 507 +3.3%
2 BR AED 85,000 469 +1.7%
3 BR AED 125,000 80 +21.4%
4 BR AED 178,000 16 -11%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 55 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
6 October 2026off-planApartment · 2 BR 1,380 1,863,364 1,350
2 September 2026off-planApartment · 3 BR 1,828 2,467,500 1,350
18 August 2026off-planApartment · 3 BR 1,657 2,896,326 1,748
18 August 2026off-planApartment · 2 BR 1,522 2,003,648 1,316
18 August 2026off-planApartment · 2 BR 1,519 1,968,507 1,296
18 August 2026off-planApartment · 2 BR 1,509 1,956,091 1,296
18 August 2026off-planApartment · 2 BR 1,395 1,882,683 1,350
18 August 2026off-planApartment · 2 BR 1,335 1,730,236 1,296
11 August 2026off-planApartment · 3 BR 1,530 3,481,760 2,276
11 August 2026off-planApartment · 2 BR 1,617 2,183,490 1,350

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Mirdif Hills - Asayel Avenue or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
2 BR 1,870,000 – 2,100,000 42 sales, 12 months This project
3 BR 2,470,000 – 2,900,000 9 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Mirdif Hills - Asayel Avenue? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (May 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
May 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Mirdif Hills - Asayel Avenue? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationMirdif · Dubai Municipality community

Al Barajeel Oasis Complex · 570 mMall · 570 mSpinneys Mirdif · 570 mMirdif Mall · 660 mChinese School Dubai · 1.2 kmChoithrams · 1.2 kmAswaaq · 1.3 kmUptown Mirdif Park · 1.3 kmMushrif National Park · 1.3 kmOntario International Canadian School · 1.3 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationRashidiya Metro Station · Red Metro line · 5 km
MallAl Barajeel Oasis Complex · 570 m
SupermarketSpinneys Mirdif · 570 m
HospitalSmilecare Medical Center LLC 042855066 · 1.8 km
SchoolChinese School Dubai · 1.2 km
ParkUptown Mirdif Park · 1.3 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 0, with 0 units and villas.

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Every project in Mirdif

Developer in DLD data Dubai Investment Real Estate (L L C) · DLD developer no. 278

Projects registered
7
4 completed · 3 under construction · 0 not started
Units delivered
2,321
864 in the pipeline
Median build time
39 months
completed projects measured: 4
Past the DLD end date
1
of 3 under construction with a DLD end date

Completed a month or more after their DLD end date: 0 of 4 completed projects with both dates. In 4 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Mirdif Hills - Asayel Avenue

When is Mirdif Hills - Asayel Avenue's handover?

DLD lists an end date of May 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Mirdif Hills - Asayel Avenue past its DLD end date?

No. Its DLD end date is May 2027, 6 months after the register of 1 November 2026.

How far along is Mirdif Hills - Asayel Avenue?

33.1% built in the DLD register of 1 November 2026.

Who is the developer of Mirdif Hills - Asayel Avenue?

Dubai Investment Real Estate (L L C), as registered with DLD.

What is the DLD project number of Mirdif Hills - Asayel Avenue?

3389.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error