Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4252Under construction43 units

Noore نووري Wadi Al Safa 3 · Mohammed Bin Rashid AL Maktoum District 11 by Eight Square Developers L.L.CAll phases of Mohammed Bin Rashid AL Maktoum District 11 15.9% built (DLD register as of 1 November 2026) DLD end date Jun 2027 7 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
15.9%
DLD register, 1 November 2026
Period elapsed
74%
Dec 2024 → Jun 2027
Latest sales
—
Fewer than 5 recent sales
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
15.9%Elapsed
74%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 15.9% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 15.9% built on 8 July 2026 (inspections: 2).
Every DLD inspection and every change in the register %, newest first
Date % built Source
8 July 2026 15.9% DLD inspection
5 January 2026 5.5% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJan 2025 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 3 November 2022 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 15.9% → 15.9%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Structure.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
441883
Issued
17 February 2025
Work start
1 March 2025
Expected completion
6 February 2027
Consultant · contractor
KAYAAN ENGINEERING CONSULTANTS · SAMA AL DHAFRAH BUILDING CONTRACTING L.L.C
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Structure1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
4252
Escrow agent
The National Bank of Fujairah P S C
Zoning authority
Dubai Municipality
Master project
Mohammed Bin Rashid AL Maktoum District 11
DLD area
Wadi Al Safa 3
Units · villas
43 · 0
Start → DLD end
Dec 2024 → Jun 2027
Registered units1 bed 17 · 2 bed 22 · 3 bed 3; sizes 846–1,208 sqft

Also registered: shops and showrooms 1.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: 2B+G+5+1R

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

Fewer than 5 sales with a size were registered in the first 90 days, so no launch price is shown.

Prices are over apartments, the type most sales in this project are.

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 3

New Ejari rent contracts for apartments across DLD area Wadi Al Safa 3, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 43,600 447 +1.4%
1 BR AED 65,000 859 0%
2 BR AED 90,000 547 0%
3 BR AED 130,000 67 +4%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 1 of 1 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
2 July 2026off-planApartment · 2 BR 1,188 2,115,754 1,781

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Noore or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Not enough registered off-plan sales for an estimate (at least 5 of one bedroom count in 12 months).

Automated estimate, not a valuation

Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Noore? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Jun 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Jun 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Noore? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 3 · Dubai Municipality community

Kent College · 300 mPark · 680 maswaaq · 720 mPark · 1.1 kmProject location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallAvenue mall · 2.1 km
Supermarketaswaaq · 720 m
HospitalHLG Umar · 3 km
SchoolKent College · 300 m
ParkPark · 680 m
BeachBeach · 2.8 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 37, with 2,121 units and villas.

2026: 1862027: 1,4392028: 496No end date: 0

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 3: 94

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Binghatti Vintage 0% Mar 2027 1,842 1,522
Binghatti Skyflame 1 0% Dec 2027 1,400 913
Binghatti Titania 0% Feb 2027 1,609 727
Samana Barari Heights 4% Oct 2028 1,826 693
Samana Barari Lagoons 16.5% Mar 2028 1,585 524
Binghatti Skyflame 2 0% Dec 2027 1,404 480
Rabdan Gates 5.2% Jun 2028 1,207 428
Taormina Village 1 20.4% Dec 2027 2,415 300
Lazord By Lapis 27.6% Dec 2026 1,458 252
Forest City Tower 70.1% Apr 2027 — 211
Living Legends Phase 6 76.7% Jul 2026 — 207
The Haven II 56.3% Dec 2026 1,260 202

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 3

Developer in DLD data Eight Square Developers L.L.C · DLD developer no. 2508

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
43 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Mohammed Bin Rashid AL Maktoum District 11

DLD lists 43 projects in the master project Mohammed Bin Rashid AL Maktoum District 11.

Lua ResidencesUnder construction · 64.4% · Mar 2026
The Woodland ResidencesUnder construction · 75.4% · Apr 2026
The Waterside Villas By EllingtonUnder construction · 45% · Jun 2026
The Lakeview Villas By EllingtonUnder construction · 20.1% · Aug 2026
The Beachfront Villas By EllingtonUnder construction · 47.4% · Aug 2026
Koyo Residence by Fuji PropertiesUnder construction · 30.7% · Sep 2026
High Best TowerUnder construction · 90.6% · Nov 2026
Numa ReserveUnder construction · 10.3% · Dec 2026
The Cube Quarter ResidencesUnder construction · 57% · Dec 2026
Wadi Villas by AristaUnder construction · 60.4% · Dec 2026
Mira Villas designed by Bentley HomeUnder construction · 31.8% · Dec 2026
Nineteen Riviera LagoonUnder construction · 34.1% · Feb 2027

Questions about Noore

When is Noore's handover?

DLD lists an end date of Jun 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Noore past its DLD end date?

No. Its DLD end date is Jun 2027, 7 months after the register of 1 November 2026.

How far along is Noore?

15.9% built in the DLD register of 1 November 2026.

Who is the developer of Noore?

Eight Square Developers L.L.C, as registered with DLD.

What is the DLD project number of Noore?

4252.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error