Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4048Under construction87 units

SOLEN RESIDENCE by Jamal Living إقامة سولِن من جمال ليفينغ Nadd Hessa · Silicon Oasis by Mohammad Abuhijleh Real Estate Development L.L.CAll phases of Silicon Oasis 21.7% built (DLD register as of 1 November 2026) DLD end date Oct 2027 11 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
21.7%
DLD register, 1 November 2026
Period elapsed
55%
Aug 2025 → Oct 2027
Latest sales
1,339 AED/sqft
9 sales
1 BR estimate
1.03–1.10 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
21.7%Elapsed
55%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 21.7% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 21.7% built on 13 August 2026 (inspections: 4).
Every DLD inspection and every change in the register %, newest first
Date % built Source
13 August 2026 21.7% DLD inspection
30 April 2026 13.1% DLD inspection
21 January 2026 2.8% DLD inspection
4 September 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedSep 2025 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 28 April 2023 to 18 February 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 21.7% → 21.7%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
4048
Escrow agent
Mashreq Bank PSC
Zoning authority
Dubai Silicon Oasis Authority
Master project
Silicon Oasis
DLD area
Nadd Hessa
Units · villas
87 · 0
Start → DLD end
Aug 2025 → Oct 2027
Registered units1 bed 49 · 2 bed 34 · 3 bed 4; sizes 824–1,213 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: RESIDENTIAL BUILDING (G+2P+9+R FLOORS)

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,233 AED/sqft
Median of 34 off-plan sales in the 90 days from the first one (Jan 2026)
Latest registered sales
1,339 AED/sqft
Median of 9 home sales after the launch window, in the last 12 months

Dubai Statistics Center residential price index (flats), 2026-Q1 to 2026-Q2: -3.2%.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 17 1,351 (17) Nov 2025 – Nov 2026
2 BR 23 1,190 (23) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2026-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Nadd Hessa, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Nadd Hessa

New Ejari rent contracts for apartments across DLD area Nadd Hessa, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 43,000 1,551 +2.4%
1 BR AED 60,000 2,968 +5.3%
2 BR AED 85,000 779 +4.9%
3 BR AED 120,000 132 0%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Service charges

What owners pay a year in completed buildings of the project’s master community, from their owners’ association budgets. A building’s own charge is set by its own budget.

Apartment buildings’ budgets; villa and townhouse budgets are left out.
14.1 AED/sqft a year
Silicon Oasis: median of 52 developments’ owners’ association budgets, 2026

Median AED per sq ft a year of residential owners’ association budgets, each development counted once, in the newest budget year with at least 10 developments. Plots, shared areas and hotel rooms are left out. A budget is not any one owner’s bill.

Source: Dubai Land Department, owners’ association budgets (service charges).

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 43 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
13 October 2026off-planApartment · 2 BR 1,212 1,680,000 1,386
11 September 2026off-planApartment · 2 BR 1,212 1,552,000 1,281
19 May 2026off-planApartment · 1 BR 824 1,000,000 1,214
11 May 2026off-planApartment · 2 BR 1,212 1,438,000 1,186
11 May 2026off-planApartment · 1 BR 824 1,113,000 1,351
6 May 2026off-planApartment · 1 BR 824 1,103,000 1,339
23 April 2026off-planApartment · 2 BR 1,212 1,650,000 1,361
23 April 2026off-planApartment · 1 BR 728 955,000 1,312
7 April 2026off-planApartment · 1 BR 824 1,108,000 1,345
23 March 2026off-planApartment · 2 BR 1,212 1,495,000 1,233

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in SOLEN RESIDENCE by Jamal Living or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 1,030,000 – 1,100,000 17 sales, 12 months This project
2 BR 1,360,000 – 1,470,000 23 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in SOLEN RESIDENCE by Jamal Living? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Oct 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Oct 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in SOLEN RESIDENCE by Jamal Living? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationNadd Hessa · Dubai Municipality community

West Zone Fresh Supermarket · 80 mStefanie Supermarket · 110 mArhan Grocery · 360 mPark · 380 mSilicon Oasis Park · 510 mPark · 660 mIndian International School · 730 mHLG Umar · 1.1 kmFakeeh University Hospital · 1.2 kmGEMS Sports Academy · 1.3 kmSilicon Central · 1.3 kmGEMS Wellington Academy · 1.4 kmGEMS Wellington Academy Silicon Oasis · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallSilicon Central · 1.3 km
SupermarketWest Zone Fresh Supermarket · 80 m
HospitalHLG Umar · 1.1 km
SchoolIndian International School · 730 m
ParkPark · 380 m
BeachBeach · 2.5 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 13, with 4,588 units and villas.

2025: 7172026: 4502027: 8932028: 1,9722029: 02030: 364No end date: 192

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Nadd Hessa: 12

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Timez By Danube 21.5% Jul 2028 1,924 1,143
Oasiz 2 by Danube 31% Nov 2027 1,964 474
The Hillgate 3.1% Jun 2028 1,635 333
Oasiz 1 by Danube 30.4% Nov 2027 1,971 269
Serenova 1.6% Mar 2028 — 223
Oasis Loft 50.1% Sep 2026 1,432 168
Belle Vie By Zimaya 11% Mar 2028 1,308 109
Aura Elite 44.3% Apr 2026 1,011 69
Aura Prestige 40.1% Nov 2026 1,300 67

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Nadd Hessa

Developer in DLD data Mohammad Abuhijleh Real Estate Development L.L.C · DLD developer no. 2196

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
87 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Silicon Oasis

DLD lists 73 projects in the master project Silicon Oasis.

Tria By DeyaarUnder construction · 94.1% · Jun 2025
Aura EliteUnder construction · 44.3% · Apr 2026
Oasis LoftUnder construction · 50.1% · Sep 2026
Aura PrestigeUnder construction · 40.1% · Nov 2026
Oasiz 1 by DanubeUnder construction · 30.4% · Nov 2027
Oasiz 2 by DanubeUnder construction · 31% · Nov 2027
Belle Vie By ZimayaUnder construction · 11% · Mar 2028
SerenovaUnder construction · 1.6% · Mar 2028
The HillgateUnder construction · 3.1% · Jun 2028
Timez By DanubeUnder construction · 21.5% · Jul 2028
Elyra Residences by EnaamPending · 0% · Mar 2029
Yigo LuxeNot started · 0% · Mar 2030

Questions about SOLEN RESIDENCE by Jamal Living

When is SOLEN RESIDENCE by Jamal Living's handover?

DLD lists an end date of Oct 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is SOLEN RESIDENCE by Jamal Living past its DLD end date?

No. Its DLD end date is Oct 2027, 11 months after the register of 1 November 2026.

How far along is SOLEN RESIDENCE by Jamal Living?

21.7% built in the DLD register of 1 November 2026.

Who is the developer of SOLEN RESIDENCE by Jamal Living?

Mohammad Abuhijleh Real Estate Development L.L.C, as registered with DLD.

What is the DLD project number of SOLEN RESIDENCE by Jamal Living?

4048.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error