Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3607Under construction

The Wilds 3 ذا وايلدز 3 Wadi Al Safa 3 by Aurora SPV 2 L.L.C 3.1% built (DLD register as of 1 November 2026) DLD end date May 2029 30 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

The Wilds by Aldar, aerial of the community lagoon and villas, Dubailand, developer render
Developer's image Aldar
% built
3.1%
DLD register, 1 November 2026
Period elapsed
33%
Jul 2025 → May 2029
Latest sales
—
Fewer than 5 recent sales
Developer
4 projects
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

28 October 2026
Built
3.1%Elapsed
33%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 3.1% built on 28 October 2026 (register readings: 1). Latest DLD inspection: 3.1% built on 14 September 2026 (inspections: 4).
Every DLD inspection and every change in the register %, newest first
Date % built Source
14 September 2026 3.1% DLD inspection
16 June 2026 2.4% DLD inspection
20 February 2026 1.8% DLD inspection
24 March 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
0.2 pt/month
2.4% on 16 June 2026 → 3.1% on 14 September 2026
At the register date
3.5%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedNot seen yet
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 28 April 2023 to 25 May 2026; method imagery-v1.

Changes in the DLD register

No change to the end date, status or % built across the register exports we hold.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3607
Escrow agent
First Abu Dhabi Bank P.J.S.C.
Zoning authority
Dubai Development Authority (DDA)
DLD area
Wadi Al Safa 3
Units · villas
0 · 0
Start → DLD end
Jul 2025 → May 2029
Registered units3 bed 173 · 4 bed 143 · 5+ bed 92; sizes 2,959–3,393 sqft

Homes: villas 408.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: The project consists of 408 (G+1) Individual Standard Villas on 408 Plots that are combination of 3,4 & 5 Bedroom units.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

No off-plan sales are registered for this project since 2020, so there is no launch price.

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Rents in DLD area Wadi Al Safa 3

New Ejari rent contracts for apartments across DLD area Wadi Al Safa 3, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 43,600 447 +1.4%
1 BR AED 65,000 859 0%
2 BR AED 90,000 547 0%
3 BR AED 130,000 67 +4%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Looking for a unit in this or similar projects?

Tell us what you are looking for in The Wilds 3 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Not enough registered off-plan sales for an estimate (at least 5 of one bedroom count in 12 months).

Automated estimate, not a valuation

Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in The Wilds 3? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (May 2029); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
May 2029
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in The Wilds 3? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 3 · Dubai Municipality community

Al Kabayel Prime · 960 mCityland Mall · 1.2 kmPark · 1.2 kmPark · 1.3 kmPark · 1.4 kmApproximate project location© OpenStreetMap contributors · Dubai Municipality · Makani
Approximate project location Malls and supermarkets Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallCityland Mall · 1.2 km
SupermarketAl Kabayel Prime · 960 m
HospitalKings Hospital · 6 km
SchoolSchool · 1.9 km
ParkPark · 1.2 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 6, with 2,869 units and villas.

2025: 9202026: 6482027: 5542029: 02030: 747

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 3: 94

Open projects in the same DLD area with a DLD end year from 2028 to 2030, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Samana Barari Heights 4% Oct 2028 1,826 693
Samana Barari Lagoons 16.5% Mar 2028 1,585 524
Rabdan Gates 5.2% Jun 2028 1,207 428
The Wilds 2 5.7% Feb 2029 — 255
The Wilds 1 7.5% Jan 2029 — 251
Vincitore Wellness Estate 0% Feb 2030 1,847 170
The Wilds Residences 0% Jun 2030 1,774 159
Gate Eleven Residences 30.6% Mar 2028 1,824 147
BARARIGATE by ADE 1.7% Dec 2028 1,630 141
The Cape 0.7% Dec 2028 2,905 126
Divine Al Barari 20.3% Mar 2028 1,381 122
Rijas Suites 3.3% Dec 2028 1,885 83

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 3

Developer in DLD data Aurora SPV 2 L.L.C · DLD developer no. 1656

Projects registered
4
0 completed · 3 under construction · 1 not started
Units delivered
0
747 in the pipeline
Past the DLD end date
0
of 3 under construction with a DLD end date

Aurora SPV 2 L.L.C is one of 7 DLD-registered developers we list together as Aurora. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about The Wilds 3

When is The Wilds 3's handover?

DLD lists an end date of May 2029 (register of 1 November 2026); the SPA sets the handover terms.

Is The Wilds 3 past its DLD end date?

No. Its DLD end date is May 2029, 30 months after the register of 1 November 2026.

How far along is The Wilds 3?

3.1% built in the DLD register of 1 November 2026.

Who is the developer of The Wilds 3?

Aurora SPV 2 L.L.C, as registered with DLD.

What is the DLD project number of The Wilds 3?

3607.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error