Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2782Under construction417 units

Volta Tower فولتا تاور Burj Khalifa by Damac C S L Investment L.L.C 29.3% built (DLD register as of 1 November 2026) DLD end date Dec 2027 13 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Burj Khalifa and Downtown Dubai under a sunset sky
Area photo: Downtown Dubai, not this project
% built
29.3%
DLD register, 1 November 2026
Period elapsed
71%
Dec 2023 → Dec 2027
Latest sales
2,394 AED/sqft
24 sales
1 BR estimate
1.66–2.15 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
29.3%Elapsed
71%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 29.3% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 29.3% built on 18 August 2026 (inspections: 8).
Every DLD inspection and every change in the register %, newest first
Date % built Source
18 August 2026 29.3% DLD inspection
11 April 2026 20.8% DLD inspection
11 December 2025 14.9% DLD inspection
4 August 2025 12.8% DLD inspection
10 April 2025 7.6% DLD inspection
20 November 2024 5.2% DLD inspection
5 July 2024 1.1% DLD inspection
14 September 2023 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 29.3% → 29.3%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Masonry.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
408922
Issued
26 December 2023
Work start
27 March 2024
Expected completion
10 May 2028
Consultant · contractor
ENGINEERING CONSORTIUM - CONSULTING ENGINEERS · ROSE CITY CONTRACTING(LLC)
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Masonry1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
2782
Escrow agent
Emirates Nbd Bank (P.J.S.C)
Zoning authority
Dubai Municipality
DLD area
Burj Khalifa
Units · villas
417 · 0
Start → DLD end
Dec 2023 → Dec 2027
Registered units1 bed 204 · 2 bed 173 · 3 bed 20 · 4 bed 20; sizes 696–1,408 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Project consists of 1B+G+62+2R floors residential tower, and adjacent parking building consist of 3B+G+12+R. The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
2,685 AED/sqft
Median of 285 off-plan sales in the 90 days from the first one (Oct 2023)
Latest registered sales
2,394 AED/sqft
Median of 24 home sales in the last 12 months, ready and off-plan
Change
-12.4%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2023-Q4 to 2026-Q2: +15.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 2,742 (173) 2,287 (5) -16.6%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 20 2,287 (5) May 2026 – Nov 2026
2 BR 25 2,155 (8) Nov 2025 – Nov 2026
4 BR 12 2,633 (5) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2023-Q4 → 2026-Q3

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Burj Khalifa, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Burj Khalifa

New Ejari rent contracts for apartments across DLD area Burj Khalifa, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 70,000 431 -11.4%
1 BR AED 110,000 2,549 -8.3%
2 BR AED 177,250 2,130 -9.1%
3 BR AED 295,000 679 -3.3%
4 BR AED 1,250,000 50 -3.8%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Service charges

What owners pay a year in completed buildings of the project’s master community, from their owners’ association budgets. A building’s own charge is set by its own budget.

Apartment buildings’ budgets; villa and townhouse budgets are left out.
26.78 AED/sqft a year
Burj Khalifa District: median of 22 developments’ owners’ association budgets, 2026

Median AED per sq ft a year of residential owners’ association budgets, each development counted once, in the newest budget year with at least 10 developments. Plots, shared areas and hotel rooms are left out. A budget is not any one owner’s bill.

Source: Dubai Land Department, owners’ association budgets (service charges).

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 24 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
27 July 2026off-planApartment · 1 BR 1,011 2,301,120 2,276
14 July 2026off-planApartment · 1 BR 692 1,977,000 2,857
7 July 2026off-planApartment · 4 BR 2,293 4,700,000 2,050
7 July 2026off-planApartment · 1 BR 349 968,875 2,776
29 June 2026off-planApartment · 4 BR 2,289 5,480,800 2,394
15 June 2026off-planApartment · 1 BR 1,011 2,150,000 2,127
11 May 2026off-planApartment · 4 BR 2,343 6,490,000 2,770
6 May 2026off-planApartment · 1 BR 1,085 2,481,600 2,287
1 April 2026off-planApartment · 4 BR 2,343 6,890,000 2,941
30 March 2026off-planApartment · 1 BR 1,085 2,595,000 2,392

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Volta Tower or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 1,660,000 – 2,150,000 11 sales, 12 months This project
2 BR 2,970,000 – 3,240,000 8 sales, 12 months This project
4 BR 5,480,000 – 6,490,000 5 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Portal asking median for off-plan units here: 2,606 AED/sqft (16 asks, last 30 days), against 2,287 AED/sqft in the latest registered sales.

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Volta Tower? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Volta Tower? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationBurj Khalifa · Dubai Municipality community

Mazaya Shopping Centre · 240 mBusiness Time Centre · 260 mFoodland Supermarket · 300 mZoom · 300 mGéant · 350 mBurj Khalifa/ Dubai Mall Metro Station · 490 mAl Wasl Centre · 550 mPublic Playground Dubai Mall · 550 mAl Wasl Park 2 · 620 mPark · 640 mMediclinic · 950 mBusiness Bay Metro Station · 970 mSalma al Ansaria School · 1.4 kmAl Raya Girl's School · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationBurj Khalifa/ Dubai Mall Metro Station · Red Metro line · 490 m
MallMazaya Shopping Centre · 240 m
SupermarketFoodland Supermarket · 300 m
HospitalMediclinic · 950 m
SchoolSalma al Ansaria School · 1.4 km
ParkPublic Playground Dubai Mall · 550 m
BeachBeach · 2.8 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 36, with 13,220 units and villas.

2024: 2532025: 1872026: 2,0532027: 1,2722028: 1,0192029: 1,9482030: 2,5882031: 1,5632032: 684No end date: 1,653

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Burj Khalifa: 18

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Binghatti Skyblade 17.1% Nov 2027 3,927 567
The St. Regis Residences, Downtown Dubai 76.1% Dec 2026 3,118 369
One Residence 6.3% Mar 2027 2,931 250
Solara Tower Dubai 20.7% Aug 2027 3,737 165
Euphoric Residences 8.3% Dec 2027 3,240 98
City Center Residences 72.3% Sep 2026 2,667 77
Baccarat Hotel and Residences, Dubai 21.2% Dec 2026 5,711 71
Mercedes-Benz Places | Binghatti 65.3% Dec 2026 5,136 67
Address Grand Downtown 10.8% Jun 2028 — 60
Azha Downtown Residences 27% Aug 2027 2,439 42
ROVE HOME RESIDENCES by IRTH 62.7% Apr 2026 3,371 40
Opulent Residences 8.5% Dec 2027 — 38

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Burj Khalifa

Developer in DLD data Damac C S L Investment L.L.C · DLD developer no. 1636

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
417 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Damac C S L Investment L.L.C is one of 21 DLD-registered developers we list together as Damac. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Volta Tower

When is Volta Tower's handover?

DLD lists an end date of Dec 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Volta Tower past its DLD end date?

No. Its DLD end date is Dec 2027, 13 months after the register of 1 November 2026.

How far along is Volta Tower?

29.3% built in the DLD register of 1 November 2026.

Who is the developer of Volta Tower?

Damac C S L Investment L.L.C, as registered with DLD.

What is the DLD project number of Volta Tower?

2782.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error