Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4274Not started161 units

City Walk Crestlane 5 سيتي ووك كريستلين 5 Al Wasl · City Walk by Citywalk Residential 1 L.L.CAll phases of City Walk DLD status: Not started (DLD register as of 1 November 2026) DLD end date Apr 2030 41 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

City Walk at night with its illuminated ring
Area photo: City Walk, not this project
% built
0%
DLD register, 1 November 2026
Registered start
Feb 2026
DLD end date Apr 2030
Latest sales
3,417 AED/sqft
-1.2% on launch 30 sales
1 BR estimate
2.69–2.80 M AED
Automated estimate, not a valuation
Developer
26 projects
17 completed · 2,831 units delivered

Completion

DLD status: Not started. 0% built, DLD end date 25 April 2030. DLD Project Status shows inspection reports once works begin.

DLD register readings
Date % built DLD end dateDLD status
1 November 2026 0% 25 April 2030Not started
28 October 2026 0% 25 April 2030Not started

Source: DLD projects register, export of 1 November 2026.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
4274
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai Development Authority (DDA)
Master project
City Walk
DLD area
Al Wasl
Units · villas
161 · 0
Start → DLD end
Feb 2026 → Apr 2030
Registered units1 bed 75 · 2 bed 51 · 3 bed 25 · 4 bed 8; sizes 804–1,507 sqft

Also registered: shops and showrooms 2.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: The project is a standard residential apartment development located at Citywalk. It introduces one level shared basement and ground with 2 retails directly accessed from the building facade adjoining the main lobby. Building A: 2B+G+12+R: comprising 81 units, and Building B: 2B+G+11+R: comprising 78 units each. In total, the residences include 159 apartments, which offer a mix of unit types: 1-bedroom, 2-bedroom, 3-bedroom, 4-bedroom and duplex apartments.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
3,404 AED/sqft
Median of 121 off-plan sales in the 90 days from the first one (Jan 2026)
Latest registered sales
3,417 AED/sqft
Median of 30 home sales after the launch window, in the last 12 months
Change
-1.2%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2026-Q1 to 2026-Q2: -3.2%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 3,468 (46) 3,425 (17) -1.2%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 72 3,425 (17) May 2026 – Nov 2026
2 BR 51 3,031 (51) Nov 2025 – Nov 2026
3 BR 25 3,440 (25) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2026-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Al Wasl, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Al Wasl

New Ejari rent contracts for apartments across DLD area Al Wasl, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 135,000 394 -14%
2 BR AED 215,000 448 -6.5%
3 BR AED 315,000 146 -13.7%
4 BR AED 464,814 12 -28.5%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 151 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
4 November 2026off-planApartment · 1 BR 846 2,823,000 3,337
7 September 2026off-planApartment · 1 BR 794 2,828,000 3,562
25 August 2026off-planApartment · 1 BR 796 2,771,000 3,481
28 July 2026off-planApartment · 1 BR 804 2,747,000 3,417
28 July 2026off-planApartment · 1 BR 804 2,747,000 3,417
22 July 2026off-planApartment · 1 BR 804 2,754,000 3,425
1 July 2026off-planApartment · 1 BR 796 2,779,000 3,491
18 June 2026off-planApartment · 4 BR 6,824 19,275,000 2,825
18 June 2026off-planApartment · 4 BR 6,299 17,744,000 2,817
15 June 2026off-planApartment · 1 BR 844 2,831,000 3,354

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in City Walk Crestlane 5 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 2,690,000 – 2,800,000 166 sales, 12 months This project
2 BR 3,660,000 – 4,610,000 129 sales, 12 months This project
3 BR 7,100,000 – 7,550,000 58 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Apr 2030); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Apr 2030
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in City Walk Crestlane 5? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationAl Wasl · Dubai Municipality community

Carrefour · 300 mCentral Park (City Walk) · 420 mChild Learning & Enrichment Medical Centre · 500 mPark · 660 mAl Shoroq Private School · 670 mShiseido · 710 mPark · 720 mAl Raya Girl's School · 960 mTown Centre Jumeirah · 1 kmSpinneys · 1.1 kmSalma al Ansaria School · 1.1 kmSimon Residence · 1.2 kmMazaya Shopping Centre · 1.2 kmSilver Life Mini Market · 1.3 kmMercato Beach · 1.3 kmMandarin Oriental · 1.3 kmBurj Khalifa/ Dubai Mall Metro Station · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationBurj Khalifa/ Dubai Mall Metro Station · Red Metro line · 1.4 km
MallShiseido · 710 m
SupermarketCarrefour · 300 m
HospitalHospital · 1.6 km
SchoolChild Learning & Enrichment Medical Centre · 500 m
ParkCentral Park (City Walk) · 420 m
BeachMercato Beach · 1.3 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 13, with 2,923 units and villas.

2026: 2122027: 5862028: 8382029: 2022030: 2042031: 5742032: 0No end date: 307

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Al Wasl: 19

Open projects in the same DLD area with a DLD end year from 2029 to 2031, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
City Walk Crestlane 1 0.2% Sep 2029 3,795 199
City Walk Crestlane 4 0% Apr 2030 3,363 186
Amali Residences 0% Dec 2030 — 0
Project 4530, Al Wasl 0% Sep 2031 — 0

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Al Wasl

Developer in DLD data Citywalk Residential 1 L.L.C · DLD developer no. 1109

Projects registered
26
17 completed · 6 under construction · 3 not started
Units delivered
2,831
1,924 in the pipeline
Median build time
38 months
completed projects measured: 17
Past the DLD end date
0
of 4 under construction with a DLD end date

Completed a month or more after their DLD end date: 3 of 15 completed projects with both dates. In 10 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error