Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2559Under construction1,087 units

Damac Bay داماك باي Marsa Dubai · Dubai Harbour by Damac J R Two Investment L.L.CAll phases of Dubai Harbour 33.8% built (DLD register as of 1 November 2026) DLD end date Jan 2027 2 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
33.8%
DLD register, 1 November 2026
Period elapsed
95%
Apr 2023 → Jan 2027
Latest sales
3,317 AED/sqft
47 sales
1 BR estimate
3.41–3.95 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
33.8%Elapsed
95%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 33.8% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 33.8% built on 18 August 2026 (inspections: 10).
Every DLD inspection and every change in the register %, newest first
Date % built Source
18 August 2026 33.8% DLD inspection
17 April 2026 28.9% DLD inspection
15 December 2025 24.5% DLD inspection
15 April 2025 16.3% DLD inspection
11 December 2024 8.8% DLD inspection
5 July 2024 5.9% DLD inspection
12 May 2024 4% DLD register, archived export
13 March 2024 4.2% DLD inspection
5 December 2023 2.5% DLD inspection
7 September 2023 0% DLD inspection
18 January 2023 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJul 2023 ± 6 months
Structure risingAug 2025 ± 6 months
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 15 March 2021 to 7 June 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 33.8% → 33.8%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
2559
Escrow agent
Emirates Nbd Bank (P.J.S.C)
Zoning authority
Dubai Development Authority (DDA)
Master project
Dubai Harbour
DLD area
Marsa Dubai
Units · villas
1,087 · 0
Start → DLD end
Apr 2023 → Jan 2027
Registered units1 bed 638 · 2 bed 269 · 3 bed 138 · 4 bed 10 · 5+ bed 8 · no bedroom count 6; sizes 858–1,518 sqft

Also registered: shops and showrooms 18.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Building 1 (Tower A): 47F+3MECH+R, Building 2 (Tower B): 47+3MECH+R, Building 3 (Tower C): 48F+3MECH+R and Shared (Basement + Podium): 3B+G+3P+1F

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
3,803 AED/sqft
Median of 666 off-plan sales in the 90 days from the first one (May 2023)
Latest registered sales
3,317 AED/sqft
Median of 47 home sales in the last 12 months, ready and off-plan
Change
-13.4%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2023-Q2 to 2026-Q2: +17.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 3,869 (390) 3,203 (8) -17.2%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 112 3,203 (8) May 2026 – Nov 2026
2 BR 22 3,877 (7) Nov 2025 – Nov 2026
3 BR 7 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2023-Q2 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Marsa Dubai, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Marsa Dubai

New Ejari rent contracts for apartments across DLD area Marsa Dubai, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 60,000 804 -14.3%
1 BR AED 95,000 4,886 -5%
2 BR AED 145,000 3,900 -3.3%
3 BR AED 210,000 1,452 -4.5%
4 BR AED 300,000 256 +3.4%
5 BR AED 680,000 22 +70%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 47 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
29 October 2026off-planApartment · 2 BR 1,365 4,936,000 3,616
26 October 2026off-planApartment · 1 BR 1,256 3,874,560 3,085
19 October 2026off-planApartment · 1 BR 1,304 3,856,320 2,957
5 October 2026off-planApartment · 1 BR 1,252 4,093,440 3,270
5 October 2026off-planApartment · 1 BR 1,303 3,678,825 2,823
25 September 2026off-planApartment · 2 BR 1,738 7,100,000 4,085
25 September 2026off-planApartment · 1 BR 833 3,089,000 3,708
9 September 2026off-planApartment · 1 BR 822 3,414,000 4,153
28 July 2026off-planApartment · 1 BR 1,304 4,177,150 3,203
8 June 2026off-planApartment · 1 BR 785 3,119,000 3,973

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Damac Bay or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 3,410,000 – 3,950,000 45 sales, 12 months This project
2 BR 3,910,000 – 5,160,000 26 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Portal asking median for off-plan units here: 4,082 AED/sqft (23 asks, last 30 days), against 3,616 AED/sqft in the latest registered sales.

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Damac Bay? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Jan 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Jan 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Damac Bay? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationMarsa Dubai · Dubai Municipality community

Mina Seyahi · 400 mCarrefour Express · 410 mCaramel Center Supermarket · 510 mCarry Food · 530 mBeach · 630 mHealth Avenue Polyclinics · 730 mBeach · 760 mMedia City · 780 mEmirates Hospital · 800 mPark · 860 mPark · 910 mPark · 950 mDAMAC Properties Metro Station · 1.4 kmNakheel Metro Station · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationDAMAC Properties Metro Station · Red Metro line · 1.4 km
Tram stopMina Seyahi · Tram line · 400 m
MallDubai Marina Mall · 1.8 km
SupermarketCarrefour Express · 410 m
HospitalHealth Avenue Polyclinics · 730 m
SchoolICCA Dubai · 2.1 km
ParkPark · 860 m
BeachBeach · 630 m

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 28, with 11,198 units and villas.

2025: 4412026: 2,8432027: 1,4322028: 3,2322029: 3982031: 861No end date: 1,991

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Marsa Dubai: 26

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Franck muller Vanguard 48.3% Nov 2027 2,454 752
Rove Home Dubai Marina 7.8% Mar 2028 3,603 665
W Residences at Dubai Harbour 4% Dec 2028 4,769 337
PELaGOS By IGO 84.2% Mar 2026 2,895 269
Aeternitas Tower 57.9% Dec 2027 2,322 189
Sobha Seahaven Tower B & C 40.2% Oct 2028 4,100 162
Dubai Harbour Residences (Area 1) 30.3% Jan 2028 4,658 161
Seapoint 36.8% Mar 2028 4,921 138
Dubai Harbour Residences (Area 3) 34.8% Jan 2028 3,869 125
Marina Shores 87.2% Dec 2026 2,697 95
Bluewaters Bay 37% Mar 2027 3,722 91
Address The Bay 70.1% Dec 2026 4,048 72

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Marsa Dubai

Developer in DLD data Damac J R Two Investment L.L.C · DLD developer no. 1529

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
1,087 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Damac J R Two Investment L.L.C is one of 21 DLD-registered developers we list together as Damac. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai Harbour

DLD lists 20 projects in the master project Dubai Harbour.

Address The BayUnder construction · 70.1% · Dec 2026
Dubai Harbour Residences (Area 3)Under construction · 34.8% · Jan 2028
Dubai Harbour Residences (Area 1)Under construction · 30.3% · Jan 2028
SeapointUnder construction · 36.8% · Mar 2028
Sobha Seahaven Tower AUnder construction · 37% · Apr 2028
BayviewUnder construction · 63% · Jul 2028
Sobha Seahaven Tower B & CUnder construction · 40.2% · Oct 2028
W Residences at Dubai HarbourUnder construction · 4% · Dec 2028
THE BRISTOL Emaar BeachfrontUnder construction · 5.8% · Sep 2029
Damac Bay 2Under construction · 30.3% · —
The Residences at the Dubai Beach EditionNot started · 0.2% · Nov 2029
Palace by the BeachNot started · 0% · Nov 2031

Questions about Damac Bay

When is Damac Bay's handover?

DLD lists an end date of Jan 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Damac Bay past its DLD end date?

No. Its DLD end date is Jan 2027, 2 months after the register of 1 November 2026.

How far along is Damac Bay?

33.8% built in the DLD register of 1 November 2026.

Who is the developer of Damac Bay?

Damac J R Two Investment L.L.C, as registered with DLD.

What is the DLD project number of Damac Bay?

2559.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error