DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4131Under construction51 units

Derby Heights ديربي هايتس Wadi Al Safa 3 · Mohammed Bin Rashid AL Maktoum District 11 by A M I S Signature Development L.L.CAll phases of Mohammed Bin Rashid AL Maktoum District 11 10.1% built (DLD register as of 1 November 2026) DLD end date Oct 2027 11 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
10.1%
DLD register, 1 November 2026
Period elapsed
43%
Feb 2026 → Oct 2027
Latest sales
1,975 AED/sqft
8 sales
1 BR estimate
1.20–1.28 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
10.1%Elapsed
43%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 10.1% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 10.1% built on 2 September 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
2 September 2026 10.1% DLD inspection
1 June 2026 2.1% DLD inspection
30 September 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedDec 2025 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 28 April 2023 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 10.1% → 10.1%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Site works.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
461973
Issued
28 October 2025
Work start
17 February 2026
Expected completion
28 October 2027
Consultant · contractor
AL SHANDAGHA ARCHITECTS & ENGINEERING CONSULTANTS · HIGH STAR CONTRACTING (L.L.C.)
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Site works1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
4131
Escrow agent
United Bank Limited (Management Office)
Zoning authority
Dubai Municipality
Master project
Mohammed Bin Rashid AL Maktoum District 11
DLD area
Wadi Al Safa 3
Units · villas
51 · 0
Start → DLD end
Feb 2026 → Oct 2027
Registered units1 bed 36 · 2 bed 15; sizes 684–1,051 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: B+G+4+R

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
2,036 AED/sqft
Median of 5 off-plan sales in the 90 days from the first one (Oct 2025)
Latest registered sales
1,975 AED/sqft
Median of 8 home sales after the launch window, in the last 12 months

Dubai Statistics Center residential price index (flats), 2025-Q4 to 2026-Q2: -0.9%.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 11 1,975 (5) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 3

New Ejari rent contracts for apartments across DLD area Wadi Al Safa 3, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 43,600 447 +1.4%
1 BR AED 65,000 859 0%
2 BR AED 90,000 547 0%
3 BR AED 130,000 67 +4%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 12 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
20 July 2026off-planApartment · 1 BR 646 1,304,490 2,019
8 July 2026off-planApartment · 1 BR 697 1,305,922 1,874
8 July 2026off-planApartment · 1 BR 654 1,291,445 1,975
22 June 2026off-planApartment · 2 BR 1,056 2,200,739 2,084
22 May 2026off-planApartment · 1 BR 596 1,189,219 1,995
11 May 2026off-planApartment · 1 BR 684 1,275,413 1,865
9 February 2026off-planApartment · 1 BR 633 1,274,011 2,013
30 January 2026off-planApartment · 1 BR 684 1,286,751 1,881
1 January 2026off-planApartment · 1 BR 640 1,261,271 1,971
8 December 2025off-planApartment · 1 BR 596 1,213,489 2,036

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Derby Heights or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 1,200,000 – 1,280,000 11 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Derby Heights? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Oct 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Oct 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Derby Heights? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 3 · Dubai Municipality community

Park · 1 kmAvenue mall · 1.2 kmCarrefour · 1.2 kmPark · 1.2 kmKent College · 1.3 kmaswaaq · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationCreek Metro Station · Green Metro line · 9.5 km
MallAvenue mall · 1.2 km
SupermarketCarrefour · 1.2 km
HospitalHospital · 3.6 km
SchoolKent College · 1.3 km
ParkPark · 1 km
BeachBeach · 2.1 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 39, with 2,113 units and villas.

2026: 1862027: 1,4312028: 4962030: 0No end date: 0

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 3: 94

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Binghatti Vintage 0% Mar 2027 1,842 1,522
Binghatti Skyflame 1 0% Dec 2027 1,400 913
Binghatti Titania 0% Feb 2027 1,609 727
Samana Barari Heights 4% Oct 2028 1,826 693
Samana Barari Lagoons 16.5% Mar 2028 1,585 524
Binghatti Skyflame 2 0% Dec 2027 1,404 480
Rabdan Gates 5.2% Jun 2028 1,207 428
Taormina Village 1 20.4% Dec 2027 2,415 300
Lazord By Lapis 27.6% Dec 2026 1,458 252
Forest City Tower 70.1% Apr 2027 — 211
Living Legends Phase 6 76.7% Jul 2026 — 207
The Haven II 56.3% Dec 2026 1,260 202

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 3

Developer in DLD data A M I S Signature Development L.L.C · DLD developer no. 2288

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
51 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Mohammed Bin Rashid AL Maktoum District 11

DLD lists 43 projects in the master project Mohammed Bin Rashid AL Maktoum District 11.

Lua ResidencesUnder construction · 64.4% · Mar 2026
The Woodland ResidencesUnder construction · 75.4% · Apr 2026
The Waterside Villas By EllingtonUnder construction · 45% · Jun 2026
The Lakeview Villas By EllingtonUnder construction · 20.1% · Aug 2026
The Beachfront Villas By EllingtonUnder construction · 47.4% · Aug 2026
Koyo Residence by Fuji PropertiesUnder construction · 30.7% · Sep 2026
High Best TowerUnder construction · 90.6% · Nov 2026
Numa ReserveUnder construction · 10.3% · Dec 2026
The Cube Quarter ResidencesUnder construction · 57% · Dec 2026
Wadi Villas by AristaUnder construction · 60.4% · Dec 2026
Mira Villas designed by Bentley HomeUnder construction · 31.8% · Dec 2026
Nineteen Riviera LagoonUnder construction · 34.1% · Feb 2027

Questions about Derby Heights

When is Derby Heights's handover?

DLD lists an end date of Oct 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Derby Heights past its DLD end date?

No. Its DLD end date is Oct 2027, 11 months after the register of 1 November 2026.

How far along is Derby Heights?

10.1% built in the DLD register of 1 November 2026.

Who is the developer of Derby Heights?

A M I S Signature Development L.L.C, as registered with DLD.

What is the DLD project number of Derby Heights?

4131.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error