DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 158Under construction296 units

Palmarosa بالماروسا Wadi Al Safa 7 · The Palmarosa by Gulf Developers FZC 97.8% built (DLD register as of 1 November 2026) DLD end date Oct 2022 past its DLD end date by 48 months DLD register as of 1 November 2026. DLD still lists the project as under construction.

% built
97.8%
DLD register, 1 November 2026
Period elapsed
128%
Oct 2008 → Oct 2022
Past the DLD end date
48 months
End-date changes in the exports we hold: 1
Developer
1 past end date
of 1 under construction with an end date

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
97.8%Elapsed
128%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 97.8% built on 1 November 2026 (register readings: 4). Latest DLD inspection: 97.8% built on 8 January 2026 (inspections: 16).
Every DLD inspection and every change in the register %, newest first
Date % built Source
8 January 2026 97.8% DLD inspection
15 May 2024 96.7% DLD inspection
6 November 2023 95% DLD inspection
18 August 2022 94.1% DLD inspection
5 August 2022 93% DLD register, archived export
7 February 2022 93.3% DLD inspection
24 October 2021 92% DLD inspection
10 November 2020 92% DLD inspection
26 March 2020 89.1% DLD inspection
24 October 2019 88.2% DLD inspection
1 July 2018 87.2% DLD inspection
18 July 2017 76.6% DLD inspection
10 November 2016 70.3% DLD inspection
26 May 2016 64.2% DLD inspection
5 January 2015 58.2% DLD inspection
7 October 2013 21.1% DLD inspection
4 February 2013 14.9% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 5 August 2022, 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 97.8% → 97.8%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

10 of 93 buildings

Buildings on the project’s plots: 93, on construction permits: 29, as Dubai Municipality lists them.

Furthest stage reached: Foundations.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
93
29 on construction permits
Permit status
Open
255129
Issued
27 March 2017
Work start
6 April 2017
Expected completion
1 January 2026
Consultant · contractor
C V TEC CONSULTING ENGINEERS · DUBAI CIVIL ENGINEERING(LLC)
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Site works65
Foundations10
No stage listed18

Buildings with work suspended (site backfilled): 19, as Dubai Municipality lists them.

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
158
Escrow agent
Dubai Islamic Bank (Public Joint Stock Company)
Zoning authority
Dubai Development Authority (DDA)
Master project
The Palmarosa
DLD area
Wadi Al Safa 7
Units · villas
11 · 285
Start → DLD end
Oct 2008 → Oct 2022
Registered units3 bed 11 · 4 bed 197 · 5+ bed 32 · no bedroom count 56; sizes 3,004–3,010 sqft

Homes: flats 11 · villas 285.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: FResidental Villas located at Wadi Al Safa 7 - Dubai .which consist of 192 Nos. of villas desigend as a Ground +1, Clubhouses, Community Facility Building, and Infrastructure.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

Fewer than 5 sales with a size were registered in the first 90 days, so no launch price is shown.

Prices are over villas and townhouses, the type most sales in this project are.

Registered sales of villas and townhouses by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
4 BR 10 855 (6) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 7

New Ejari rent contracts for villas and townhouses across DLD area Wadi Al Safa 7, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 70,000 291 0%
2 BR AED 119,678 211 +4.1%
3 BR AED 165,445 405 -8.1%
4 BR AED 290,000 229 0%
5 BR AED 350,000 53 -1.4%
6 BR AED 550,000 9 -8.3%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 6 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
5 November 2026readyVilla · 4 BR 3,329 2,950,000 886
16 October 2026readyVilla · 4 BR 2,925 2,500,000 855
15 October 2026readyVilla · 4 BR 3,132 2,951,000 942
29 September 2026readyVilla · 4 BR 3,298 2,000,000 606
4 February 2026off-planVilla · 4 BR 3,480 3,500,000 1,006
17 November 2025off-planVilla · 4 BR 3,700 2,000,000 541
16 September 2025off-planVilla · 4 BR 3,195 4,138,574 1,295
22 May 2025off-planVilla · 4 BR 6,330 3,910,000 618
26 February 2025off-planVilla · 5 BR 7,911 5,500,000 695
25 December 2024off-planVilla · 4 BR 2,990 3,400,000 1,137

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Palmarosa or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Not enough registered off-plan sales for an estimate (at least 5 of one bedroom count in 12 months).

Automated estimate, not a valuation

Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Palmarosa? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Oct 2022); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2026
DLD end date has passed
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Palmarosa? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 7 · Dubai Municipality community

Park · 590 mGems Metropole School · 720 mArabian Ranches II Park · 840 mPark · 870 mSpinneys · 900 mWest Zone Supermarket · 1.2 kmSchool · 1.3 kmRanches Primary School · 1.3 kmGrandiose Supermarket · 1.3 kmApproximate project location© OpenStreetMap contributors · Dubai Municipality · Makani
Approximate project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallArabian Ranches Community Center · 2.1 km
SupermarketSpinneys · 900 m
HospitalKings Hospital · 8.5 km
SchoolGems Metropole School · 720 m
ParkPark · 590 m

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 2, with 473 units and villas.

2027: 02028: 473

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Every project in Wadi Al Safa 7

Developer in DLD data Gulf Developers FZC · DLD developer no. 64

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
296 in the pipeline
Past the DLD end date
1
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Palmarosa

When is Palmarosa's handover?

DLD lists an end date of Oct 2022 (register of 1 November 2026); the SPA sets the handover terms.

Is Palmarosa past its DLD end date?

Yes. Its DLD end date is Oct 2022, 48 months before the register of 1 November 2026.

How far along is Palmarosa?

97.8% built in the DLD register of 1 November 2026.

Who is the developer of Palmarosa?

Gulf Developers FZC, as registered with DLD.

What is the DLD project number of Palmarosa?

158.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error