DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2784Under construction1,752 units

Reportage Village 1 ريبورتاج فيلدج 1 Wadi Al Safa 7 by Reportage Prime Properties L.L.C 25% built (DLD register as of 1 November 2026) DLD end date Dec 2027 13 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Reportage Village townhouses along a landscaped street, Dubailand, Dubai, developer render
Developer's image Reportage Properties
% built
25%
DLD register, 1 November 2026
Period elapsed
71%
Dec 2023 → Dec 2027
Latest sales
1,240 AED/sqft
208 sales
2 BR estimate
1.01–1.40 M AED
Automated estimate, not a valuation
Developer
10 projects
1 completed · 378 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
25%Elapsed
71%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 25% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 25% built on 20 August 2026 (inspections: 5).
Every DLD inspection and every change in the register %, newest first
Date % built Source
20 August 2026 25% DLD inspection
5 May 2026 20.7% DLD inspection
10 February 2026 18.1% DLD inspection
11 November 2025 11.1% DLD inspection
11 April 2025 2% DLD inspection
12 May 2024 0% DLD register, archived export

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedOct 2023 ± 6 months
Structure risingMar 2026 ± 6 months
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 14 September 2021 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 25% → 25%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
2784
Escrow agent
Arab Bank for Investment & Foreign Trade Almasref P.J.S.C.
Zoning authority
Dubai Development Authority (DDA)
DLD area
Wadi Al Safa 7
Units · villas
0 · 1,752
Start → DLD end
Dec 2023 → Dec 2027
Registered units2 bed 1,275 · 3 bed 170 · 4 bed 307; sizes 1,146–1,501 sqft

Homes: villas 1,752.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: 1752 nos (G+2F+R)&(G+1F+R) residential Villa.The project is designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
982 AED/sqft
Median of 87 off-plan sales in the 90 days from the first one (Feb 2024)
Latest registered sales
1,240 AED/sqft
Median of 208 home sales in the last 12 months, ready and off-plan
Change
+25.5%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (villas), 2024-Q1 to 2026-Q2: +23.4%.

Prices are over villas and townhouses, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
2 BR 977 (58) 1,162 (79) +18.9%
4 BR 1,391 (28) 1,755 (7) +26.2%
Registered sales of villas and townhouses by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
2 BR 827 1,162 (79) May 2026 – Nov 2026
3 BR 114 956 (19) Nov 2025 – Nov 2026
4 BR 160 1,755 (7) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2024-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (villas and townhouses). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 7, median AED/sqft of off-plan sales of villas and townhouses by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Wadi Al Safa 7

New Ejari rent contracts for villas and townhouses across DLD area Wadi Al Safa 7, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 70,000 291 0%
2 BR AED 119,678 211 +4.1%
3 BR AED 165,445 405 -8.1%
4 BR AED 290,000 229 0%
5 BR AED 350,000 53 -1.4%
6 BR AED 550,000 9 -8.3%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 209 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
28 October 2026off-planVilla · 2 BR 947 1,317,015 1,391
26 October 2026off-planVilla · 2 BR 947 928,926 981
19 October 2026off-planVilla · 2 BR 1,628 1,320,000 811
19 October 2026off-planVilla · 2 BR 947 914,163 965
15 October 2026off-planVilla · 4 BR 948 2,021,790 2,133
15 October 2026off-planVilla · 2 BR 947 1,521,518 1,607
15 October 2026off-planVilla · 2 BR 977 1,050,000 1,075
15 October 2026off-planVilla · 2 BR 1,446 695,000 481
7 October 2026off-planVilla · 2 BR 474 625,000 1,319
5 October 2026off-planVilla · 4 BR 948 1,460,000 1,540

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Reportage Village 1 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
2 BR 1,010,000 – 1,400,000 173 sales, 12 months This project
3 BR 980,000 – 1,800,000 19 sales, 12 months This project
4 BR 1,330,000 – 1,580,000 16 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Reportage Village 1? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Reportage Village 1? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWadi Al Safa 7 · Dubai Municipality community

Park · 1.2 kmPark · 1.3 kmPark · 1.4 kmGems Metropole School · 1.5 kmSpinneys · 1.5 kmApproximate project location© OpenStreetMap contributors · Dubai Municipality · Makani
Approximate project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallArabian Ranches Community Center · 2.1 km
SupermarketSpinneys · 1.5 km
HospitalKings Hospital · 8.2 km
SchoolGems Metropole School · 1.5 km
ParkPark · 1.2 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 4, with 484 units and villas.

2022: 112027: 02028: 473No end date: 0

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 7: 5

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
The Acres 2 & Estates 2 14.9% May 2028 — 208
The Acres 3 & Estates 14.9% Nov 2027 — 152
Mayfair Nexus by Seven Mayfair 0.6% Dec 2028 1,473 23

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 7

Developer in DLD data Reportage Prime Properties L.L.C · DLD developer no. 1277

Projects registered
10
1 completed · 8 under construction · 1 not started
Units delivered
378
4,814 in the pipeline
Past the DLD end date
4
of 7 under construction with a DLD end date

Completed a month or more after their DLD end date: 0 of 1 completed projects with both dates. In 1 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Reportage Prime Properties L.L.C is one of 7 DLD-registered developers we list together as Reportage. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Reportage Village 1

When is Reportage Village 1's handover?

DLD lists an end date of Dec 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Reportage Village 1 past its DLD end date?

No. Its DLD end date is Dec 2027, 13 months after the register of 1 November 2026.

How far along is Reportage Village 1?

25% built in the DLD register of 1 November 2026.

Who is the developer of Reportage Village 1?

Reportage Prime Properties L.L.C, as registered with DLD.

What is the DLD project number of Reportage Village 1?

2784.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error