Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4016Under construction370 units

Sol Luxe سول لوكس Trade Center First by S O L Properties Development L.L.C 2% built (DLD register as of 1 November 2026) DLD end date Mar 2029 28 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Towers along Sheikh Zayed Road above the road interchange
Area photo: Sheikh Zayed Road, not this project
% built
2%
DLD register, 1 November 2026
Period elapsed
31%
Oct 2025 → Mar 2029
Latest sales
3,177 AED/sqft
-9.5% on launch 36 sales
1 BR estimate
2.46–2.85 M AED
Automated estimate, not a valuation
Developer
11 projects
5 completed · 999 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
2%Elapsed
31%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 2% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 2% built on 30 June 2026 (inspections: 2).
Every DLD inspection and every change in the register %, newest first
Date % built Source
30 June 2026 2% DLD inspection
11 August 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 2% → 2%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
4016
Escrow agent
Mashreq Bank PSC
Zoning authority
Dubai Municipality
DLD area
Trade Center First
Units · villas
370 · 0
Start → DLD end
Oct 2025 → Mar 2029
Registered units1 bed 140 · 2 bed 118 · 3 bed 30; sizes 784–1,256 sqft

Also registered: offices 79 · shops and showrooms 3.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: ((B+G+63+R)) Mixed Used (Residential Tower + Commercial + Retail)

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
3,397 AED/sqft
Median of 40 off-plan sales in the 90 days from the first one (Feb 2026)
Latest registered sales
3,177 AED/sqft
Median of 36 home sales after the launch window, in the last 12 months
Change
-9.5%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2026-Q1 to 2026-Q2: -3.2%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 3,389 (26) 3,040 (25) -10.3%
2 BR 3,433 (13) 3,191 (11) -7%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 50 3,040 (25) May 2026 – Nov 2026
2 BR 23 3,191 (11) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2026-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Trade Center First, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Trade Center First

New Ejari rent contracts for apartments across DLD area Trade Center First, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 80,000 67 +14.3%
1 BR AED 95,000 302 0%
2 BR AED 127,743 623 -1.7%
3 BR AED 150,000 382 +4.7%
4 BR AED 750,000 7 —

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 76 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
15 October 2026off-planApartment · 1 BR 784 3,340,000 4,260
25 September 2026off-planApartment · 2 BR 1,103 3,500,000 3,173
1 September 2026off-planApartment · 1 BR 788 3,253,114 4,128
11 August 2026off-planApartment · 1 BR 866 2,178,450 2,516
3 August 2026off-planApartment · 1 BR 866 2,132,000 2,462
29 July 2026off-planApartment · 2 BR 1,256 4,740,000 3,774
29 July 2026off-planApartment · 1 BR 788 2,744,000 3,482
24 July 2026off-planApartment · 2 BR 1,103 3,520,000 3,191
23 July 2026off-planApartment · 1 BR 788 3,320,000 4,213
22 July 2026off-planApartment · 1 BR 783 2,880,900 3,679

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Sol Luxe or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 2,460,000 – 2,850,000 50 sales, 12 months This project
2 BR 3,820,000 – 4,420,000 23 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Sol Luxe? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Mar 2029); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Mar 2029
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Sol Luxe? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationTrade Center First · Dubai Municipality community

Financial Centre Metro Station · 180 mBuymode · 180 mHospital · 200 mGEMS Wellington Primary School · 240 mUnion Coop Hypermarket · 270 mUnion COOP · 310 mAl Satwa Park 3 · 450 mThe Gate Avenue · 470 mSalma al Ansaria School · 600 mAl Khazzan Park · 920 mEmirates Towers Metro Station · 930 mAl Shhaab Schol for Basic Edication · 950 mPark · 1 kmBurj Khalifa/ Dubai Mall Metro Station · 1.1 kmBusiness Time Centre · 1.4 kmShiseido · 1.4 kmMediclinic · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationFinancial Centre Metro Station · Red Metro line · 180 m
MallThe Gate Avenue · 470 m
SupermarketBuymode · 180 m
HospitalHospital · 200 m
SchoolGEMS Wellington Primary School · 240 m
ParkAl Satwa Park 3 · 450 m
BeachMandarin Oriental · 2.5 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 29, with 4,917 units and villas.

2025: 562026: 8812027: 6112028: 1,1342029: 6002030: 7542031: 5742032: 0No end date: 307

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Trade Center First: 2

Open projects in the same DLD area with a DLD end year from 2028 to 2030, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Burj Azizi 7.5% Aug 2030 — 7

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Trade Center First

Developer in DLD data S O L Properties Development L.L.C · DLD developer no. 999

Projects registered
11
5 completed · 3 under construction · 3 not started
Units delivered
999
1,538 in the pipeline
Median build time
26 months
completed projects measured: 5
Past the DLD end date
0
of 3 under construction with a DLD end date

Completed a month or more after their DLD end date: 0 of 5 completed projects with both dates. In 1 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Sol Luxe

When is Sol Luxe's handover?

DLD lists an end date of Mar 2029 (register of 1 November 2026); the SPA sets the handover terms.

Is Sol Luxe past its DLD end date?

No. Its DLD end date is Mar 2029, 28 months after the register of 1 November 2026.

How far along is Sol Luxe?

2% built in the DLD register of 1 November 2026.

Who is the developer of Sol Luxe?

S O L Properties Development L.L.C, as registered with DLD.

What is the DLD project number of Sol Luxe?

4016.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error