Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3257Under construction1,072 units

Burj Azizi برج عزيزى Trade Center First by Azizi Developments L.L.C 7.5% built (DLD register as of 1 November 2026) DLD end date Aug 2030 45 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Towers along Sheikh Zayed Road above the road interchange
Area photo: Sheikh Zayed Road, not this project
% built
7.5%
DLD register, 1 November 2026
Period elapsed
36%
Aug 2024 → Aug 2030
Latest sales
6,871 AED/sqft
5 sales
1 BR estimate
5.50–5.86 M AED
Automated estimate, not a valuation
Developer
150 projects
91 completed · 20,380 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
7.5%Elapsed
36%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 7.5% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 7.5% built on 3 September 2026 (inspections: 2).
Every DLD inspection and every change in the register %, newest first
Date % built Source
3 September 2026 7.5% DLD inspection
27 August 2024 0.5% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
0.3 pt/month
0.5% on 27 August 2024 → 7.5% on 1 November 2026
At the register date
7.5%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 7.5% → 7.5%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Foundations.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
236414
Issued
20 October 2014
Work start
29 October 2014
Expected completion
25 December 2029
Consultant · contractor
AE SEVEN MORSE ARCHITECTURE & ENGINEERING CONSULTANCIES CO L.L.C · GARDINIA BUILDING CONTRACTING L.L.C
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Foundations1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3257
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai Municipality
DLD area
Trade Center First
Units · villas
1,072 · 0
Start → DLD end
Aug 2024 → Aug 2030
Registered units1 bed 825 · 2 bed 156 · 3 bed 45 · 4 bed 30 · 5+ bed 15; sizes 961–1,194 sqft

Also registered: other units 1.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: G+130+RMIXED UESED TOWER WITH 9B +G+10P

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

Fewer than 5 sales with a size were registered in the first 90 days, so no launch price is shown.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 7 6,871 (5) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Trade Center First

New Ejari rent contracts for apartments across DLD area Trade Center First, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 80,000 67 +14.3%
1 BR AED 95,000 302 0%
2 BR AED 127,743 623 -1.7%
3 BR AED 150,000 382 +4.7%
4 BR AED 750,000 7 —

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 7 of 5 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
15 October 2026off-planApartment · 1 BR 801 5,503,680 6,871
12 October 2026off-planApartment · 1 BR 1,093 5,860,800 5,362
30 September 2026off-planApartment · 1 BR 789 5,455,000 6,914
3 September 2026off-planApartment · 1 BR 801 5,840,192 7,291
20 August 2026off-planApartment · 1 BR 1,093 5,911,180 5,408
25 August 2025off-planApartment · 1 BR 871 6,564,240 7,536
1 May 2025off-planApartment · 1 BR 781 7,856,100 10,059

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Burj Azizi or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 5,500,000 – 5,860,000 5 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Burj Azizi? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Aug 2030); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Aug 2030
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Burj Azizi? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationTrade Center First · Dubai Municipality community

Invisible Braces Dental And Skin Polyclinic · 180 mFair Trade · 210 mWorld Trade Centre Metro Station · 250 mZoom · 290 mFicus Gardens · 470 mEmirates Towers Metro Station · 820 mAl Tawasoul Grocery · 820 mPark · 1.1 kmAl Diyafa Shopping Center · 1.3 kmAl Satwa Park 3 · 1.3 kmAl Jafiliya Metro Station · 1.4 kmAl Hana Centre · 1.5 kmIranian Hospital Dubai · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationWorld Trade Centre Metro Station · Red Metro line · 250 m
MallAl Diyafa Shopping Center · 1.3 km
SupermarketFair Trade · 210 m
HospitalInvisible Braces Dental And Skin Polyclinic · 180 m
SchoolSchool · 1.5 km
ParkFicus Gardens · 470 m
BeachBeach · 2.4 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 48, with 9,305 units and villas.

2025: 562026: 1,4892027: 1,1342028: 2,4172029: 2722030: 1,5682031: 0No end date: 2,369

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Trade Center First: 2

Open projects in the same DLD area with a DLD end year from 2029 to 2031, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Trump Tower 3.8% Dec 2031 3,894 381
Sol Luxe 2% Mar 2029 3,177 76

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Trade Center First

Developer in DLD data Azizi Developments L.L.C · DLD developer no. 1002

Projects registered
150
91 completed · 43 under construction · 16 not started
Units delivered
20,380
40,083 in the pipeline
Median build time
56 months
completed projects measured: 91
Past the DLD end date
10
of 38 under construction with a DLD end date

Completed a month or more after their DLD end date: 13 of 90 completed projects with both dates. In 65 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Azizi Developments L.L.C is one of 3 DLD-registered developers we list together as Azizi. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Burj Azizi

When is Burj Azizi's handover?

DLD lists an end date of Aug 2030 (register of 1 November 2026); the SPA sets the handover terms.

Is Burj Azizi past its DLD end date?

No. Its DLD end date is Aug 2030, 45 months after the register of 1 November 2026.

How far along is Burj Azizi?

7.5% built in the DLD register of 1 November 2026.

Who is the developer of Burj Azizi?

Azizi Developments L.L.C, as registered with DLD.

What is the DLD project number of Burj Azizi?

3257.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error