DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3140Under construction258 units

South Garden B B ساوث غاردن Jabal Ali First · Wasl Gate by Jag Development L.L.CAll phases of Wasl Gate 16.2% built (DLD register as of 1 November 2026) DLD end date Dec 2027 13 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
16.2%
DLD register, 1 November 2026
Period elapsed
61%
Jan 2025 → Dec 2027
Latest sales
1,357 AED/sqft
29 sales
1 BR estimate
1.17–1.24 M AED
Automated estimate, not a valuation
Developer
15 projects
3 completed · 605 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
16.2%Elapsed
61%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 16.1% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 16.1% built on 7 September 2026 (inspections: 4).
Every DLD inspection and every change in the register %, newest first
Date % built Source
7 September 2026 16.1% DLD inspection
24 February 2026 8% DLD inspection
21 July 2025 0.6% DLD inspection
6 August 2024 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
1 pt/month
8% on 24 February 2026 → 16.1% on 1 November 2026
At the register date
16.1%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedDec 2024 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 21 September 2022 to 15 March 2025; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 16.2% → 16.1%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Structure.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
317343
Issued
10 October 2024
Work start
1 May 2025
Consultant · contractor
BURO KLING ARCHITECTURAL ENGINEERING CONSULTANTS · TEAM ENGINEERING ENTERPRISES LTD. (DUBAI BRANCH)
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Structure1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3140
Escrow agent
Emirates Nbd Bank (P.J.S.C)
Zoning authority
Dubai Municipality
Master project
Wasl Gate
DLD area
Jabal Ali First
Units · villas
258 · 0
Start → DLD end
Jan 2025 → Dec 2027
Registered unitsStudio 43 · 1 bed 64 · 2 bed 134 · 3 bed 15; sizes 858–1,230 sqft

Also registered: shops and showrooms 2.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: B+G+2 Podium+12 Floors Residential & commercial building.The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,343 AED/sqft
Median of 50 off-plan sales in the 90 days from the first one (Jan 2025)
Latest registered sales
1,357 AED/sqft
Median of 29 home sales in the last 12 months, ready and off-plan
Change
+2.5%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q1 to 2026-Q2: +2.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
2 BR 1,343 (24) 1,394 (5) +3.8%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 38 — —
1 BR 62 1,357 (10) Nov 2025 – Nov 2026
2 BR 122 1,394 (5) May 2026 – Nov 2026
3 BR 14 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Skyline Index

Registered sale prices, rents and yields for South Garden B, from DLD records.

South Garden B: registered prices and rents on Skyline Index ↗

Median AED/sqft by quarter

2025-Q1 → 2026-Q3

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Jabal Ali First, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Jabal Ali First

New Ejari rent contracts for apartments across DLD area Jabal Ali First, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 45,500 3,592 -2.2%
1 BR AED 67,000 3,120 -1.5%
2 BR AED 93,000 1,583 -7%
3 BR AED 135,000 373 +8%
4 BR AED 142,500 53 —

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 29 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
24 September 2026off-planApartment · 2 BR 1,297 1,984,000 1,530
23 September 2026off-planApartment · 2 BR 1,236 1,832,000 1,482
31 August 2026off-planApartment · 2 BR 1,230 1,715,000 1,394
19 August 2026off-planApartment · 1 BR 858 1,048,000 1,221
12 August 2026off-planApartment · 2 BR 1,230 1,666,000 1,354
14 July 2026off-planApartment · 1 BR 945 1,333,000 1,411
9 July 2026off-planApartment · 2 BR 1,190 1,606,000 1,350
6 May 2026off-planApartment · 1 BR 858 1,048,000 1,221
5 May 2026off-planApartment · 1 BR 944 1,281,000 1,357
1 May 2026off-planApartment · 1 BR 944 1,203,000 1,274

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in South Garden B or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 1,170,000 – 1,240,000 10 sales, 12 months This project
2 BR 1,570,000 – 1,740,000 17 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in South Garden B? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in South Garden B? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationJabal Ali First · Dubai Municipality community

Park · 670 mEnergy Metro Station · 920 mOasis Supermarket · 1 kmShakland 4 Supermarket · 1 kmFestival Plaza · 1.1 kmFestival Plaza · 1.1 kmJabel Ali Star · 1.1 kmLifeline Hospital · 1.3 kmJebel Ali Primary School · 1.3 kmMall · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationEnergy Metro Station · Red Metro line · 920 m
MallFestival Plaza · 1.1 km
SupermarketOasis Supermarket · 1 km
HospitalLifeline Hospital · 1.3 km
SchoolJebel Ali Primary School · 1.3 km
ParkPark · 670 m
BeachBeach · 2.5 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 20, with 5,876 units and villas.

2027: 1,4322028: 1,7102029: 9442030: 717No end date: 1,073

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Jabal Ali First: 76

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Taiyo Residences 12.1% Dec 2027 1,596 356
SPARKLZ by Danube 7.8% May 2028 1,688 330
South Garden C 16.2% Dec 2027 1,220 255
Hills View at Wasl Gate 9.1% Jun 2028 1,425 255
South Garden A 16.2% Dec 2027 1,313 243
Sola Residences 23.6% Sep 2027 1,380 242
South Garden E 8% May 2028 1,443 223
Havelock Residences 11.4% Dec 2026 1,383 219
South Garden D 5.7% May 2028 1,425 216
Bellavion by Sunrise 10.3% Dec 2027 1,414 161
999 Residences by Reef Luxury Development 13.2% Jun 2027 1,547 135
Avenue Residence 7 By Nabni 17.3% Oct 2027 1,493 126

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Jabal Ali First

Developer in DLD data Jag Development L.L.C · DLD developer no. 1233

Projects registered
15
3 completed · 8 under construction · 4 not started
Units delivered
605
3,770 in the pipeline
Median build time
44 months
completed projects measured: 3
Past the DLD end date
0
of 5 under construction with a DLD end date

Completed a month or more after their DLD end date: 1 of 3 completed projects with both dates. In 2 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Wasl Gate

DLD lists 22 projects in the master project Wasl Gate.

Sola ResidencesUnder construction · 23.6% · Sep 2027
Bellavion by SunriseUnder construction · 10.3% · Dec 2027
South Garden AUnder construction · 16.2% · Dec 2027
South Garden CUnder construction · 16.2% · Dec 2027
Taiyo ResidencesUnder construction · 12.1% · Dec 2027
South Garden DUnder construction · 5.7% · May 2028
South Garden EUnder construction · 8% · May 2028
Hills View at Wasl GateUnder construction · 9.1% · Jun 2028
Hammock ParkUnder construction · 82.1% · —
Hillside Residences 2Under construction · 18.5% · —
Hillside Residences 1Under construction · 26.3% · —
Hillside Residences 3Under construction · 12.9% · —

Questions about South Garden B

When is South Garden B's handover?

DLD lists an end date of Dec 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is South Garden B past its DLD end date?

No. Its DLD end date is Dec 2027, 13 months after the register of 1 November 2026.

How far along is South Garden B?

16.2% built in the DLD register of 1 November 2026.

Who is the developer of South Garden B?

Jag Development L.L.C, as registered with DLD.

What is the DLD project number of South Garden B?

3140.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error