Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3083Under construction750 units

350 Riverside Crescent ريفرسايد كريسنت 350 Bukadra by Sobha L.L.C 57.9% built (DLD register as of 1 November 2026) no DLD end date registered DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Rendering of the 350 Riverside Crescent towers and terraced podiums around the lagoon at Sobha Hartland II
Developer's image Sobha Realty
% built
57.9%
DLD register, 1 November 2026
Latest sales
2,401 AED/sqft
63 sales
1 BR estimate
1.38–1.87 M AED
Automated estimate, not a valuation
Developer
45 projects
17 completed · 7,444 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built

1 November 2026
Built
57.9%
Latest DLD register reading: 57.9% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 57.9% built on 18 August 2026 (inspections: 8).
Every DLD inspection and every change in the register %, newest first
Date % built Source
18 August 2026 57.9% DLD inspection
13 May 2026 50.1% DLD inspection
30 January 2026 39.1% DLD inspection
18 September 2025 32.2% DLD inspection
9 May 2025 22.1% DLD inspection
11 February 2025 14.2% DLD inspection
5 November 2024 10.7% DLD inspection
14 May 2024 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedAug 2023 ± 6 months
Structure risingJan 2025 ± 6 months
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 30 April 2022 to 25 May 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 57.9% → 57.9%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Finishes.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
425155
Issued
30 April 2024
Work start
12 May 2024
Expected completion
14 May 2026
Consultant · contractor
P N C ARCHITECTS · SOBHA CONSTRUCTIONS L.L.C
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Finishes1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
Developer
DLD project number
3083
Escrow agent
Emirates Nbd Bank (P.J.S.C)
Zoning authority
Dubai Municipality
DLD area
Bukadra
Units · villas
750 · 0
Start → DLD end
May 2024 → —
Registered units1 bed 473 · 2 bed 265 · 3 bed 4; sizes 712–1,174 sqft

Also registered: shops and showrooms 8.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Proposed 2Basement + Ground + 4 Podiums + 59 Floors + Roof, Commercial (Retail) and Residential Development.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
2,350 AED/sqft
Median of 423 off-plan sales in the 90 days from the first one (Jul 2024)
Latest registered sales
2,401 AED/sqft
Median of 63 home sales in the last 12 months, ready and off-plan
Change
+0.6%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2024-Q3 to 2026-Q2: +7.1%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 2,414 (225) 2,401 (27) -0.5%
2 BR 2,310 (198) 2,374 (9) +2.8%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 202 2,401 (27) May 2026 – Nov 2026
2 BR 36 2,374 (9) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2024-Q3 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Bukadra, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Bukadra

New Ejari rent contracts for apartments across DLD area Bukadra, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
2 BR AED 110,000 13 -4.3%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 63 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
30 October 2026off-planApartment · 2 BR 1,179 3,006,654 2,550
27 October 2026off-planApartment · 1 BR 717 1,792,725 2,500
23 October 2026off-planApartment · 1 BR 529 1,406,103 2,658
23 October 2026off-planApartment · 1 BR 527 1,348,557 2,559
21 October 2026off-planApartment · 2 BR 1,178 3,063,086 2,600
8 October 2026off-planApartment · 1 BR 851 2,034,392 2,391
28 September 2026off-planApartment · 1 BR 843 1,980,886 2,350
25 September 2026off-planApartment · 1 BR 704 1,661,841 2,361
22 September 2026off-planApartment · 1 BR 594 1,620,337 2,728
16 September 2026off-planApartment · 2 BR 1,179 2,200,000 1,866

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in 350 Riverside Crescent or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 1,380,000 – 1,870,000 50 sales, 12 months This project
2 BR 2,620,000 – 2,860,000 13 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in 350 Riverside Crescent? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. DLD has no end date for this project, so handover starts a year from now; move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Nov 2027
No end date registered
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in 350 Riverside Crescent? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationBu Kadra · Dubai Municipality community

City Line Grocery · 920 mLiv minimart · 980 mMOUNT WAY MINIMART · 980 mEden Park · 1.3 kmCentral Park · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationCreek Metro Station · Green Metro line · 5.2 km
MallSobha Mall (Under Construction) · 2.3 km
SupermarketCity Line Grocery · 920 m
HospitalHospital · 2.1 km
SchoolNorth London Collegiate School · 1.9 km
ParkEden Park · 1.3 km
BeachBeach · 2.4 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 53, with 21,592 units and villas.

2025: 4552026: 5532027: 6,9282028: 3,2082029: 3,1762030: 3,275No end date: 3,997

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Bu Kadra: 31

Open projects in the same DLD area, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Skyvue 10.5% Mar 2030 2,989 2,104
Skyscape 38.3% Dec 2029 2,426 1,473
Claydon House By Ellington 15.7% Dec 2027 2,008 400
310 Riverside Crescent 50.2% — 2,494 382
Parkway By Prestige One 10.9% Jan 2028 1,955 263
340 Riverside Crescent 55% — 2,359 252
The Highgrove 7% Dec 2028 2,453 229
360 Riverside Crescent 50.7% — 2,500 225
Imtiaz Symphony Tower 6.3% Jun 2029 2,450 221
320 Riverside Crescent 56.7% — 2,374 221
330 Riverside Crescent 67.8% — 2,335 221
Belmore Residences 6.5% Dec 2027 2,211 181

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Bu Kadra

Developer in DLD data Sobha L.L.C · DLD developer no. 966

Projects registered
45
17 completed · 22 under construction · 6 not started
Units delivered
7,444
30,108 in the pipeline
Median build time
41 months
completed projects measured: 17
Past the DLD end date
0
of 13 under construction with a DLD end date

Completed a month or more after their DLD end date: 2 of 17 completed projects with both dates. In 10 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Sobha L.L.C is one of 6 DLD-registered developers we list together as Sobha. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about 350 Riverside Crescent

When is 350 Riverside Crescent's handover?

DLD lists no end date for it (register of 1 November 2026); the SPA sets the handover terms.

How far along is 350 Riverside Crescent?

57.9% built in the DLD register of 1 November 2026.

Who is the developer of 350 Riverside Crescent?

Sobha L.L.C, as registered with DLD.

What is the DLD project number of 350 Riverside Crescent?

3083.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error