Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3417Under construction335 units

API- Barsha Residential Tower إيه بي آي- برشاء ريزيدنشال تاور Al Barsha First by Dubai General Properties L.L.C 92.6% built (DLD register as of 1 November 2026) DLD end date Oct 2025 past its DLD end date by 12 months DLD register as of 1 November 2026. DLD still lists the project as under construction.

% built
92.6%
DLD register, 1 November 2026
Period elapsed
124%
Aug 2021 → Oct 2025
Past the DLD end date
12 months
No end-date change in the exports we hold
Developer
2 past end date
of 2 under construction with an end date

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
92.6%Elapsed
124%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 92.6% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 92.6% built on 17 February 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
17 February 2026 92.6% DLD inspection
23 September 2025 87.7% DLD inspection
27 December 2024 78.6% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 92.6% → 92.6%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 2 buildings

Buildings on the project’s plots: 2, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Final works.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
2
1 on construction permits
Permit status
Open
318900
Issued
19 May 2019
Work start
11 April 2019
Expected completion
17 February 2024
Consultant · contractor
BURO KLING ARCHITECTURAL ENGINEERING CONSULTANTS · THE SECOND CONSTRUCTION CO. LTD OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU (DUBAI BRANCH)
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Foundations1
Final works1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3417
Escrow agent
Emirates Nbd Bank (P.J.S.C)
Zoning authority
Dubai Municipality
DLD area
Al Barsha First
Units · villas
335 · 0
Start → DLD end
Aug 2021 → Oct 2025
Registered units1 bed 62 · 2 bed 190 · 3 bed 76; sizes 1,250–1,838 sqft

Homes: flats 110 · hotel apartments and rooms 218.

Also registered: shops and showrooms 7.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: سكني+ شقق فندقية (1 سرداب+ أرضي+ 16 طابق+ سطح

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,653 AED/sqft
Median of 37 off-plan sales in the 90 days from the first one (Apr 2025)
Latest registered sales
1,778 AED/sqft
Median of 13 home sales in the last 12 months, ready and off-plan
Change
+6.9%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q2 to 2026-Q2: +1.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
3 BR 1,578 (15) 1,687 (9) +6.9%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
2 BR 46 — —
3 BR 40 1,687 (9) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q2 → 2026-Q3

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Al Barsha First, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Al Barsha First

New Ejari rent contracts for apartments across DLD area Al Barsha First, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 47,000 256 +2.2%
1 BR AED 65,000 2,359 -4.4%
2 BR AED 90,125 1,602 -3.1%
3 BR AED 130,000 195 -3.7%
4 BR AED 141,000 9 +8.5%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 13 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
2 September 2026off-planApartment · 2 BR 1,456 2,800,824 1,924
11 June 2026off-planApartment · 3 BR 1,838 3,100,000 1,687
13 May 2026off-planApartment · 2 BR 1,456 2,868,460 1,970
22 April 2026off-planApartment · 2 BR 1,456 2,944,900 2,023
10 February 2026off-planApartment · 3 BR 1,838 3,402,560 1,851
10 February 2026off-planApartment · 3 BR 2,026 3,101,700 1,531
19 December 2025off-planApartment · 3 BR 2,185 3,509,444 1,606
15 December 2025off-planApartment · 3 BR 2,185 3,624,890 1,659
15 December 2025off-planApartment · 3 BR 2,185 3,525,390 1,613
15 December 2025off-planApartment · 3 BR 1,914 3,403,540 1,778

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in API- Barsha Residential Tower or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
3 BR 3,290,000 – 3,480,000 9 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in API- Barsha Residential Tower? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Oct 2025); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2026
DLD end date has passed
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in API- Barsha Residential Tower? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationAl Barsha First · Dubai Municipality community

Madenat Al Khair Grocery · 150 mCare Plus Supermarket · 150 mAl Maya · 200 mAl Arqam Private School · 310 mMashreq Metro Station · 430 mAl Barsha 1 Park 1 · 520 mDubai National School (Al Barsha Branch) · 560 mGEMS Wellington International School · 600 mPark · 860 mPark · 1 kmAl Zahra Hospital · 1.1 kmThe B1 Mall · 1.1 kmAl Noor Training Centre for Persons with Disabilities · 1.2 kmDubai American Academy · 1.2 kmMall of The Emirates · 1.4 kmAmerican School of Dubai ELC - Gate 4 · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationMashreq Metro Station · Red Metro line · 430 m
Tram stopAl Sufouh · Tram line · 2.5 km
MallThe B1 Mall · 1.1 km
SupermarketMadenat Al Khair Grocery · 150 m
HospitalAl Zahra Hospital · 1.1 km
SchoolAl Arqam Private School · 310 m
ParkAl Barsha 1 Park 1 · 520 m
BeachBeach · 2.6 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 6, with 1,736 units and villas.

2024: 2422026: 7192028: 02029: 775

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Al Barsha First: 1

Open projects in the same DLD area with a DLD end year from 2024 to 2026, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
MAS Barsha Residency 26.3% Nov 2026 1,800 60

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Al Barsha First

Developer in DLD data Dubai General Properties L.L.C · DLD developer no. 1767

Projects registered
2
0 completed · 2 under construction · 0 not started
Units delivered
0
335 in the pipeline
Past the DLD end date
2
of 2 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about API- Barsha Residential Tower

When is API- Barsha Residential Tower's handover?

DLD lists an end date of Oct 2025 (register of 1 November 2026); the SPA sets the handover terms.

Is API- Barsha Residential Tower past its DLD end date?

Yes. Its DLD end date is Oct 2025, 12 months before the register of 1 November 2026.

How far along is API- Barsha Residential Tower?

92.6% built in the DLD register of 1 November 2026.

Who is the developer of API- Barsha Residential Tower?

Dubai General Properties L.L.C, as registered with DLD.

What is the DLD project number of API- Barsha Residential Tower?

3417.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error