Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3474Under construction2,965 units

Azizi Venice 6 عزيزي فينيس 6 Madinat Al Mataar · Dubai World Central by Azizi Developments L.L.CAll phases of Dubai World Central 11.6% built (DLD register as of 1 November 2026) DLD end date Dec 2027 13 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Azizi Venice apartment buildings around the lagoon, Dubai South, developer render
Developer's image Azizi Developments
% built
11.6%
DLD register, 1 November 2026
Period elapsed
61%
Dec 2024 → Dec 2027
Latest sales
2,032 AED/sqft
1,000 sales
1 BR estimate
1.06–1.23 M AED
Automated estimate, not a valuation
Developer
150 projects
91 completed · 20,380 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
11.6%Elapsed
61%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 11.6% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 11.6% built on 8 May 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
8 May 2026 11.6% DLD inspection
9 December 2025 8.2% DLD inspection
26 December 2024 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedOct 2023 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 25 February 2022 to 15 March 2025; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 11.6% → 11.6%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3474
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai South
Master project
Dubai World Central
DLD area
Madinat Al Mataar
Units · villas
2,965 · 0
Start → DLD end
Dec 2024 → Dec 2027
Registered unitsStudio 1,949 · 1 bed 827 · 2 bed 109 · 3 bed 4; sizes 354–749 sqft

Also registered: shops and showrooms 76.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Building A : 4B+G +13+Roof Building B : 4B+G +14+Roof Building C : 4B+G +14+Roof Building D : 4B+G +13+Roof Building E : 4B+G +11+Roof Building F : 4B+G +11+Roof Building G: 4B+G +11+Roof Building H: 4 B+G +11+Roof

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,938 AED/sqft
Median of 118 off-plan sales in the 90 days from the first one (Jan 2025)
Latest registered sales
2,032 AED/sqft
Median of 1,000 home sales in the last 12 months, ready and off-plan
Change
+3.4%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2025-Q1 to 2026-Q2: +2.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
Studio 1,938 (112) 2,062 (741) +6.4%
1 BR 1,737 (5) 1,597 (191) -8.1%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 1,043 2,062 (741) May 2026 – Nov 2026
1 BR 244 1,597 (191) May 2026 – Nov 2026
2 BR 13 1,856 (10) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Madinat Al Mataar, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Madinat Al Mataar

New Ejari rent contracts for apartments across DLD area Madinat Al Mataar, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 41,000 818 +2.5%
1 BR AED 56,500 1,084 +0.9%
2 BR AED 85,000 1,080 0%
3 BR AED 120,000 182 0%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 1,000 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
5 November 2026off-planApartment · Studio 353 750,000 2,125
5 November 2026off-planApartment · Studio 352 742,020 2,108
5 November 2026off-planApartment · Studio 356 706,500 1,985
4 November 2026off-planApartment · Studio 354 777,780 2,197
4 November 2026off-planApartment · Studio 357 720,000 2,017
4 November 2026off-planApartment · Studio 348 672,320 1,932
4 November 2026off-planApartment · Studio 354 672,320 1,899
3 November 2026off-planApartment · Studio 357 745,000 2,087
3 November 2026off-planApartment · Studio 353 702,960 1,991
2 November 2026off-planApartment · Studio 353 687,600 1,948

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Azizi Venice 6 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
Studio 620,000 – 700,000 6,125 sales, 12 months This project
1 BR 1,060,000 – 1,230,000 2,212 sales, 12 months This project
2 BR 1,680,000 – 2,150,000 252 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Azizi Venice 6? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Azizi Venice 6? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationMadinat Al Mataar · Dubai Municipality community

Project location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

HospitalShifa International Hospitals DWC · 8.2 km

Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 24, with 18,991 units and villas.

2025: 1,8942026: 5,7142027: 7,3202028: 2492029: 995No end date: 2,819

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Madinat Al Mataar: 167

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Azizi Venice 14 30.3% May 2026 1,649 2,546
Azizi Venice 7 29.2% Jan 2026 1,849 1,180
Azizi Venice 15 0% May 2027 1,715 904
azizi venice 13 45.9% Sep 2027 1,675 797
azizi venice 12 21.6% Sep 2027 1,685 753
Azizi Venice 11 25.9% Aug 2027 1,667 696
South Square 2.6% Jun 2028 1,473 428
Expo City Sidr Residences 25% Mar 2028 2,088 423
Azizi Venice 16 0% Jun 2027 1,898 310
Expo City Al Waha Residences 01 65.8% Jun 2027 2,515 286
Expo City Al Waha Residences 02 61.4% Jun 2027 2,550 273
AVENEW888-LOOM 1.6% Mar 2028 1,478 228

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Madinat Al Mataar

Developer in DLD data Azizi Developments L.L.C · DLD developer no. 1002

Projects registered
150
91 completed · 43 under construction · 16 not started
Units delivered
20,380
40,083 in the pipeline
Median build time
56 months
completed projects measured: 91
Past the DLD end date
10
of 38 under construction with a DLD end date

Completed a month or more after their DLD end date: 13 of 90 completed projects with both dates. In 65 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Azizi Developments L.L.C is one of 3 DLD-registered developers we list together as Azizi. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai World Central

DLD lists 72 projects in the master project Dubai World Central.

Discovery DunesUnder construction · 70% · Dec 2023
Azizi Venice 5Under construction · 63.5% · Oct 2025
Azizi Venice 4Under construction · 62.2% · Dec 2025
Azizi Venice 2Under construction · 57.2% · Dec 2025
Azizi Venice 1Under construction · 67.4% · Dec 2025
Azizi Venice 3Under construction · 76% · Dec 2025
Azizi Venice 7Under construction · 29.2% · Jan 2026
Expo City ValleyUnder construction · 66% · Jan 2026
Azizi Venice 14Under construction · 30.3% · May 2026
Fairway Villas 2Under construction · 92.2% · Dec 2026
Azizi Venice 11Under construction · 25.9% · Aug 2027
azizi venice 13Under construction · 45.9% · Sep 2027

Questions about Azizi Venice 6

When is Azizi Venice 6's handover?

DLD lists an end date of Dec 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Azizi Venice 6 past its DLD end date?

No. Its DLD end date is Dec 2027, 13 months after the register of 1 November 2026.

How far along is Azizi Venice 6?

11.6% built in the DLD register of 1 November 2026.

Who is the developer of Azizi Venice 6?

Azizi Developments L.L.C, as registered with DLD.

What is the DLD project number of Azizi Venice 6?

3474.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error