Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3589Under construction32 units

Casa Ahs كاسا ا يه اتش ا س Al Wasl · Dubai Water Canal by Ahs Canal Three Development L.L.CAll phases of Dubai Water Canal 16.1% built (DLD register as of 1 November 2026) DLD end date May 2027 6 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
16.1%
DLD register, 1 November 2026
Period elapsed
71%
Jun 2025 → May 2027
Latest sales
4,422 AED/sqft
12 sales
5 BR estimate
47.00–51.98 M AED
Automated estimate, not a valuation
Developer
1 project
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
16.1%Elapsed
71%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 16.1% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 16.1% built on 24 September 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
24 September 2026 16.1% DLD inspection
17 March 2026 9.2% DLD inspection
14 March 2025 2% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
0.9 pt/month
9.2% on 17 March 2026 → 16.1% on 1 November 2026
At the register date
16.1%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 16.1% → 16.1%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Foundations.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
425156
Issued
23 September 2024
Work start
20 October 2024
Expected completion
31 December 2027
Consultant · contractor
KEO INTERNATIONAL CONSULTANTS L.L.C · DARWISH ENGINEERING EMIRATES (L.L.C)
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Foundations1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3589
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai Municipality
Master project
Dubai Water Canal
DLD area
Al Wasl
Units · villas
32 · 0
Start → DLD end
Jun 2025 → May 2027
Registered units3 bed 10 · 4 bed 8 · 5+ bed 14; sizes 6,384–10,756 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Project consists of 4B + G + 16 building comprising of residential units. it is designed to have a concrete structure and block with internal and external finishes

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

Fewer than 5 sales with a size were registered in the first 90 days, so no launch price is shown.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
5 BR 6 4,464 (5) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2025-Q3 → 2026-Q2

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Al Wasl, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Al Wasl

New Ejari rent contracts for apartments across DLD area Al Wasl, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 135,000 394 -14%
2 BR AED 215,000 448 -6.5%
3 BR AED 315,000 146 -13.7%
4 BR AED 464,814 12 -28.5%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 12 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
6 May 2026off-planApartment · 5 BR 10,402 46,000,000 4,422
4 May 2026off-planApartment · 6 BR 21,211 101,200,000 4,771
4 May 2026off-planApartment · 5 BR 10,829 51,975,000 4,800
30 April 2026off-planApartment · 3 BR 5,973 24,000,000 4,018
6 April 2026off-planApartment · 5 BR 10,482 55,000,000 5,247
2 April 2026off-planApartment · 3 BR 6,316 25,000,000 3,958
2 April 2026off-planApartment · 3 BR 6,468 24,700,000 3,819
1 April 2026off-planApartment · 5 BR 10,528 47,000,000 4,464
1 April 2026off-planApartment · 5 BR 10,714 47,000,000 4,387
13 March 2026off-planApartment · 4 BR 7,563 35,000,000 4,628

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Casa Ahs or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
5 BR 47,000,000 – 51,980,000 5 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Casa Ahs? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (May 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
May 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Casa Ahs? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationAl Wasl · Dubai Municipality community

Safa Park · 240 mSchool · 370 mHorizon English School · 510 mMedCare Hospital · 570 mAl Safa High School · 620 mUnion Cooperative Supermarket · 670 mChoithram's Supermarket · 700 mJSS School · 830 mJumeirah English Speaking School · 890 mMedcare Orthopaedics & Spine Hospital · 930 mA Mart Supermarket · 1.1 kmPark · 1.2 kmSamaa Medical Centre · 1.2 kmLa Plage · 1.3 kmBeach park plaza hotel · 1.4 kmFamily Hub · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationBusiness Bay Metro Station · Red Metro line · 1.5 km
MallLa Plage · 1.3 km
SupermarketUnion Cooperative Supermarket · 670 m
HospitalMedCare Hospital · 570 m
SchoolSchool · 370 m
ParkSafa Park · 240 m
BeachBeach · 1.8 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 17, with 7,556 units and villas.

2025: 6622026: 1,7532027: 1,7792028: 3972029: 1,0882030: 2082031: 1862032: 684No end date: 799

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Al Wasl: 19

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Eden House The Park 63.6% Feb 2027 3,958 317
City Walk Crestlane 2 6.8% Dec 2028 — 202
City Walk Crestlane 3 4.6% Dec 2028 — 195
MR.C Residences Downtown 73.2% Jan 2027 3,926 82
Muraba Veil 7.6% Dec 2028 — 39
Verve City Walk 13.7% Sep 2028 3,068 35
Central Park Plaza 43.7% Oct 2026 — 10

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Al Wasl

Developer in DLD data Ahs Canal Three Development L.L.C · DLD developer no. 1865

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
32 in the pipeline
Past the DLD end date
0
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai Water Canal

DLD lists 18 projects in the master project Dubai Water Canal.

One CanalUnder construction · 87.7% · May 2025
Cavalli CoutureUnder construction · 19.7% · May 2025
The RingsUnder construction · 35.1% · Dec 2025
Damac CityUnder construction · 72.8% · Dec 2025
The MelgranoUnder construction · 42.8% · Dec 2026
Eden House The ParkUnder construction · 63.6% · Feb 2027
Sea Mirror ResidencesUnder construction · 10.4% · Dec 2027
Muraba VeilUnder construction · 7.6% · Dec 2028
Damac City 2Under construction · 5.7% · —
Casa CanalUnder construction · 38.3% · —
Amali ResidencesNot started · 0% · Dec 2030
Private Residences DubaiCompleted · 100% · Sep 2022

Questions about Casa Ahs

When is Casa Ahs's handover?

DLD lists an end date of May 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Casa Ahs past its DLD end date?

No. Its DLD end date is May 2027, 6 months after the register of 1 November 2026.

How far along is Casa Ahs?

16.1% built in the DLD register of 1 November 2026.

Who is the developer of Casa Ahs?

Ahs Canal Three Development L.L.C, as registered with DLD.

What is the DLD project number of Casa Ahs?

3589.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error