Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2459Under construction95 units

Cavalli Couture كفالي كوتور Al Wasl · Dubai Water Canal by Damac Business Real Estate CO. L.L.CAll phases of Dubai Water Canal 19.7% built (DLD register as of 1 November 2026) DLD end date May 2025 past its DLD end date by 17 months DLD register as of 1 November 2026. DLD still lists the project as under construction.

% built
19.7%
DLD register, 1 November 2026
Period elapsed
166%
Mar 2023 → May 2025
Past the DLD end date
17 months
No end-date change in the exports we hold
Developer
1 past end date
of 1 under construction with an end date

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

28 October 2026
Built
19.7%Elapsed
166%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 19.7% built on 28 October 2026 (register readings: 2). Latest DLD inspection: 19.7% built on 8 April 2026 (inspections: 9).
Every DLD inspection and every change in the register %, newest first
Date % built Source
8 April 2026 19.7% DLD inspection
23 December 2025 14.9% DLD inspection
30 May 2025 10.9% DLD inspection
5 July 2024 5.9% DLD inspection
29 May 2024 3.6% DLD inspection
12 May 2024 3% DLD register, archived export
15 November 2023 3.3% DLD inspection
4 July 2023 2.3% DLD inspection
11 April 2023 0.7% DLD inspection
15 September 2022 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
1.4 pt/month
14.9% on 23 December 2025 → 19.7% on 8 April 2026
At the register date
29%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

No change to the end date, status or % built across the register exports we hold.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Masonry.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
384311
Issued
21 June 2022
Work start
28 August 2022
Expected completion
29 October 2027
Consultant · contractor
CONSOLIDATED ENGINEERING CO. (KHATIB & ALAMI) (L.L.C) · ENGINEERING CONSTRUCTION & RECONSTRUCTION CO L.L.C
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Masonry1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
2459
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai Municipality
Master project
Dubai Water Canal
DLD area
Al Wasl
Units · villas
95 · 0
Start → DLD end
Mar 2023 → May 2025
Registered units3 bed 57 · 4 bed 24 · 5+ bed 14; sizes 4,133–5,856 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: The project consists of apartments building of 2B+G+1M+14+2P+2R located in Dubai Water Canal Area. The building is designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
4,211 AED/sqft
Median of 14 off-plan sales in the 90 days from the first one (May 2023)
Latest registered sales
5,306 AED/sqft
Median of 7 home sales in the last 12 months, ready and off-plan
Change
+22.7%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2023-Q2 to 2026-Q2: +17.7%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
3 BR 4,325 (7) 5,306 (7) +22.7%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
3 BR 15 5,306 (7) Nov 2025 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2023-Q2 → 2026-Q3

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Al Wasl, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Al Wasl

New Ejari rent contracts for apartments across DLD area Al Wasl, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 135,000 394 -14%
2 BR AED 215,000 448 -6.5%
3 BR AED 315,000 146 -13.7%
4 BR AED 464,814 12 -28.5%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 7 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
21 August 2026off-planApartment · 3 BR 4,145 22,233,000 5,364
22 April 2026off-planApartment · 3 BR 4,229 22,439,000 5,306
30 March 2026off-planApartment · 3 BR 4,274 21,792,355 5,099
16 March 2026off-planApartment · 3 BR 4,129 21,023,100 5,092
17 February 2026off-planApartment · 3 BR 4,219 21,059,760 4,992
10 November 2025off-planApartment · 3 BR 4,545 24,904,000 5,479
10 November 2025off-planApartment · 3 BR 4,093 22,322,000 5,454
7 October 2025off-planApartment · 3 BR 4,649 21,136,080 4,546
8 September 2025off-planApartment · 3 BR 4,146 20,007,680 4,826
19 August 2025off-planApartment · 5 BR 7,917 36,128,490 4,563

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Cavalli Couture or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
3 BR 20,380,000 – 22,230,000 7 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Cavalli Couture? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (May 2025); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2026
DLD end date has passed
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Cavalli Couture? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationAl Wasl · Dubai Municipality community

Union Cooperative Supermarket · 430 mChoithram's Supermarket · 490 mSafa Park · 490 mSchool · 630 mMedCare Hospital · 650 mHorizon English School · 740 mAl Safa High School · 810 mLa Plage · 950 mAl Ittihad Private School · 950 mJSS School · 1 kmEmirate Hospital · 1 kmNeuro Spinal Hospital · 1 kmBeach park plaza hotel · 1.1 kmPark · 1.2 kmAl Nabib Grocery · 1.2 kmBeach · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationBusiness Bay Metro Station · Red Metro line · 1.8 km
MallLa Plage · 950 m
SupermarketUnion Cooperative Supermarket · 430 m
HospitalMedCare Hospital · 650 m
SchoolSchool · 630 m
ParkSafa Park · 490 m
BeachBeach · 1.5 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 17, with 6,355 units and villas.

2025: 5672026: 1,7532027: 1,8112028: 4582029: 752030: 2082032: 684No end date: 799

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Al Wasl: 19

Open projects in the same DLD area with a DLD end year from 2024 to 2026, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Damac City 72.8% Dec 2025 2,232 118
Central Park Plaza 43.7% Oct 2026 — 10
One Canal 87.7% May 2025 — 8

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Al Wasl

Developer in DLD data Damac Business Real Estate CO. L.L.C · DLD developer no. 1414

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
95 in the pipeline
Past the DLD end date
1
of 1 under construction with a DLD end date

Damac Business Real Estate CO. L.L.C is one of 21 DLD-registered developers we list together as Damac. See the group

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai Water Canal

DLD lists 18 projects in the master project Dubai Water Canal.

One CanalUnder construction · 87.7% · May 2025
The RingsUnder construction · 35.1% · Dec 2025
Damac CityUnder construction · 72.8% · Dec 2025
The MelgranoUnder construction · 42.8% · Dec 2026
Eden House The ParkUnder construction · 63.6% · Feb 2027
Casa AhsUnder construction · 16.1% · May 2027
Sea Mirror ResidencesUnder construction · 10.4% · Dec 2027
Muraba VeilUnder construction · 7.6% · Dec 2028
Damac City 2Under construction · 5.7% · —
Casa CanalUnder construction · 38.3% · —
Amali ResidencesNot started · 0% · Dec 2030
Private Residences DubaiCompleted · 100% · Sep 2022

Questions about Cavalli Couture

When is Cavalli Couture's handover?

DLD lists an end date of May 2025 (register of 1 November 2026); the SPA sets the handover terms.

Is Cavalli Couture past its DLD end date?

Yes. Its DLD end date is May 2025, 17 months before the register of 1 November 2026.

How far along is Cavalli Couture?

19.7% built in the DLD register of 1 November 2026.

Who is the developer of Cavalli Couture?

Damac Business Real Estate CO. L.L.C, as registered with DLD.

What is the DLD project number of Cavalli Couture?

2459.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error