DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 2374Under construction511 units

Damac City داماك سيتي Al Wasl · Dubai Water Canal by J A Parks L.L.CAll phases of Dubai Water Canal 72.8% built (DLD register as of 1 November 2026) DLD end date Dec 2025 past its DLD end date by 10 months DLD register as of 1 November 2026. DLD still lists the project as under construction.

% built
72.8%
DLD register, 1 November 2026
Period elapsed
123%
Jun 2022 → Dec 2025
Past the DLD end date
10 months
No end-date change in the exports we hold
Developer
1 past end date
of 1 under construction with an end date

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

28 October 2026
Built
72.8%Elapsed
123%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 72.8% built on 28 October 2026 (register readings: 3). Latest DLD inspection: 72.8% built on 30 September 2026 (inspections: 13).
Every DLD inspection and every change in the register %, newest first
Date % built Source
30 September 2026 72.8% DLD inspection
15 July 2026 68.7% DLD inspection
24 March 2026 58.8% DLD inspection
15 November 2025 42.1% DLD inspection
4 July 2025 37.9% DLD inspection
1 February 2025 23.7% DLD inspection
18 October 2024 20% DLD inspection
20 June 2024 13.4% DLD inspection
12 May 2024 6% DLD register, archived export
25 March 2024 10.1% DLD inspection
15 August 2023 6.2% DLD inspection
31 May 2023 6% DLD inspection
24 January 2023 4.1% DLD inspection
26 September 2022 0.1% DLD inspection
5 August 2022 0% DLD register, archived export

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 5 August 2022, 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Recent pace
1.6 pt/month
68.7% on 15 July 2026 → 72.8% on 30 September 2026
At the register date
74.5%
1 November 2026

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJan 2022 ± 6 months
Structure risingSep 2024 ± 6 months
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 8 May 2020 to 25 May 2026; method imagery-v1.

Changes in the DLD register

No change to the end date, status or % built across the register exports we hold.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

2 of 2 buildings

Buildings on the project’s plots: 2, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Finishes.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
2
1 on construction permits
Permit status
Open
374897
Issued
5 July 2022
Work start
24 August 2022
Expected completion
25 June 2023
Consultant · contractor
AE SEVEN MORSE ARCHITECTURE & ENGINEERING CONSULTANCIES CO L.L.C · UNITED ENGINEERING CONSTRUCTION CO (L.L.C) UNEC
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Finishes2

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
2374
Escrow agent
Emirates Nbd Bank (P.J.S.C)
Zoning authority
Dubai Municipality
Master project
Dubai Water Canal
DLD area
Al Wasl
Units · villas
511 · 0
Start → DLD end
Jun 2022 → Dec 2025
Registered units1 bed 205 · 2 bed 249 · 3 bed 45 · 4 bed 8 · 5+ bed 2; sizes 839–1,792 sqft

Also registered: shops and showrooms 2.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: Tower(A):G+ 4P + 57 Tower(B):G+ 4P + 40 Residential, The project designed to have a concrete structure and block with internal and external finishes.

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
2,205 AED/sqft
Median of 314 off-plan sales in the 90 days from the first one (May 2022)
Latest registered sales
2,232 AED/sqft
Median of 48 home sales in the last 12 months, ready and off-plan
Change
+4%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2022-Q2 to 2026-Q2: +34.5%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
1 BR 2,161 (134) 2,482 (8) +14.9%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 44 2,482 (8) May 2026 – Nov 2026
2 BR 61 2,329 (22) Nov 2025 – Nov 2026
3 BR 11 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2022-Q2 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Al Wasl, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Al Wasl

New Ejari rent contracts for apartments across DLD area Al Wasl, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 135,000 394 -14%
2 BR AED 215,000 448 -6.5%
3 BR AED 315,000 146 -13.7%
4 BR AED 464,814 12 -28.5%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 49 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
12 October 2026off-planApartment · 1 BR 839 1,873,000 2,232
12 October 2026off-planApartment · 1 BR 838 1,811,000 2,161
9 October 2026off-planApartment · 1 BR 1,167 2,896,320 2,482
1 September 2026off-planApartment · 3 BR 2,119 5,369,000 2,534
9 June 2026off-planApartment · 1 BR 839 2,303,000 2,745
8 June 2026off-planApartment · 1 BR 839 1,839,000 2,192
18 May 2026off-planApartment · 2 BR 1,704 4,592,000 2,695
18 May 2026off-planApartment · 1 BR 839 2,320,000 2,765
14 May 2026off-planApartment · 2 BR 2,171 4,555,240 2,098
14 May 2026off-planApartment · 2 BR 1,598 4,273,000 2,674

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Damac City or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
1 BR 2,120,000 – 2,370,000 170 sales, 12 months This project
2 BR 3,260,000 – 4,030,000 72 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Damac City? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2025); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2026
DLD end date has passed
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Damac City? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationAl Wasl · Dubai Municipality community

Medcare Orthopaedics & Spine Hospital · 350 mSafa Park · 490 mA Mart Supermarket · 560 mMedCare Hospital · 630 mJumeirah English Speaking School · 630 mSchool · 750 mAl Ittihad Private School · 800 mSafa British School · 870 mHorizon English School · 870 mSouk Extra · 890 mLuLu Express · 890 mAl Faris Mall · 1.1 kmChoithram's Supermarket · 1.1 kmAl Quoz Park 2 · 1.1 kmNexx Home Healthcare Services · 1.1 kmFamily Hub · 1.2 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationBusiness Bay Metro Station · Red Metro line · 1.6 km
MallSouk Extra · 890 m
SupermarketA Mart Supermarket · 560 m
HospitalMedcare Orthopaedics & Spine Hospital · 350 m
SchoolJumeirah English Speaking School · 630 m
ParkSafa Park · 490 m
BeachBeach · 2.5 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 20, with 8,392 units and villas.

2025: 6182026: 1,7532027: 2,0902028: 8022029: 1,2522030: 2082031: 1862032: 684No end date: 799

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Al Wasl: 19

Open projects in the same DLD area with a DLD end year from 2024 to 2026, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Cavalli Couture 19.7% May 2025 5,306 17
Central Park Plaza 43.7% Oct 2026 — 10
One Canal 87.7% May 2025 — 8

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Al Wasl

Developer in DLD data J A Parks L.L.C · DLD developer no. 1359

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
511 in the pipeline
Past the DLD end date
1
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai Water Canal

DLD lists 18 projects in the master project Dubai Water Canal.

One CanalUnder construction · 87.7% · May 2025
Cavalli CoutureUnder construction · 19.7% · May 2025
The RingsUnder construction · 35.1% · Dec 2025
The MelgranoUnder construction · 42.8% · Dec 2026
Eden House The ParkUnder construction · 63.6% · Feb 2027
Casa AhsUnder construction · 16.1% · May 2027
Sea Mirror ResidencesUnder construction · 10.4% · Dec 2027
Muraba VeilUnder construction · 7.6% · Dec 2028
Damac City 2Under construction · 5.7% · —
Casa CanalUnder construction · 38.3% · —
Amali ResidencesNot started · 0% · Dec 2030
Private Residences DubaiCompleted · 100% · Sep 2022

Questions about Damac City

When is Damac City's handover?

DLD lists an end date of Dec 2025 (register of 1 November 2026); the SPA sets the handover terms.

Is Damac City past its DLD end date?

Yes. Its DLD end date is Dec 2025, 10 months before the register of 1 November 2026.

How far along is Damac City?

72.8% built in the DLD register of 1 November 2026.

Who is the developer of Damac City?

J A Parks L.L.C, as registered with DLD.

What is the DLD project number of Damac City?

2374.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error