DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 1915Completed60 units

Grenland Residence By arloid جرينلاد ريزيدنس من ارلويد Wadi Al Safa 3 · Mohammed Bin Rashid AL Maktoum District 11 by Arloid Real Estate Development L.L.C FZAll phases of Mohammed Bin Rashid AL Maktoum District 11 Completed 10 August 2021 (DLD) DLD end date Aug 2021 DLD register as of 1 November 2026 DLD register as of 1 November 2026. Dates are the ones registered with DLD.

Completed projects cannot be added to My units.

Completed
Aug 2021
DLD end date Aug 2021
Build time
68 months
Dec 2015 → Aug 2021
Latest sales
—
Fewer than 5 recent sales
2 BR rent
110,000 AED/yr
9 leases, 12 months
Developer
1 project
1 completed · 60 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built

28 October 2026
Built
100%
Latest DLD register reading: 100% built on 28 October 2026 (register readings: 3). Latest DLD inspection: 100% built on 10 August 2021 (inspections: 8).
Every DLD inspection and every change in the register %, newest first
Date % built Source
10 August 2021 100% DLD inspection
15 March 2021 98.6% DLD inspection
1 November 2020 98.2% DLD inspection
9 June 2020 95.1% DLD inspection
23 October 2019 90.6% DLD inspection
27 November 2018 85.1% DLD inspection
21 June 2018 65.3% DLD inspection
28 December 2017 50.3% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 5 August 2022, 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗

Site timeline

± 6 months
Works startedJul 2016 ± 6 months
Structure risingFeb 2017 ± 6 months
Topped outOct 2020 ± 6 months
FinishedAug 2021 ± 6 months

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 1 October 2013 to 25 May 2026; method imagery-v1.

Registered period and actual build

Registered period
68 monthsActual build
68 months
Start date
20 December 2015
DLD end date
10 August 2021
Completion date
10 August 2021
Completion vs DLD end date
On the date

Source: DLD projects register. Build time: our calculation from DLD’s start and completion dates.

Changes in the DLD register

No change to the end date, status or % built across the register exports we hold.

Source: DLD projects register exports, compared by CraneScore. Planned dates against DLD's completion date. In 69% of completed projects in the register the completion date and the DLD end date are the same day, which suggests DLD sets the end date at completion, so this comparison can show no gap where there was one.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Completed.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Closed
283404
Issued
15 June 2016
Work start
26 June 2016
Completion
6 July 2021
Consultant · contractor
ARCHEN ENGINEERING CONSULTANTS L.L.C · AL AHMADIAH INTERNATIONAL CONTRACTING L.L.C
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Completed1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
1915
Escrow agent
Dubai Islamic Bank (Public Joint Stock Company)
Zoning authority
Dubai Municipality
Master project
Mohammed Bin Rashid AL Maktoum District 11
DLD area
Wadi Al Safa 3
Units · villas
60 · 0
Start → DLD end
Dec 2015 → Aug 2021
Registered units1 bed 10 · 2 bed 40 · 3 bed 8; sizes 1,412–1,668 sqft

Also registered: shops and showrooms 2 · other units 1.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: B+G+5+R Residential Building on plot C05-C06, Parcel: C-D11, 58 Units(10-1BHK, 40-2BHK and 8-3BHK). Retail Shops 2 Units. In addition amenities like Swimming Pool and Health Club are available

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

Fewer than 5 sales with a size were registered in the first 90 days, so no launch price is shown.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
2 BR 6 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2020-Q4 → 2026-Q4

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 3, median AED/sqft of ready sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents and gross yield

New Ejari rent contracts for apartments in this project, 12 months to 5 November 2026, against the 12 months before. Fewer than 10 ready sales per bedroom count in those 12 months, so no yield is shown.

Bedrooms Median annual rent New contracts Change on a year earlier
2 BR AED 110,000 9 -8.3%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Mortgage registrations

Home mortgages DLD has registered on units in this project, per quarter, in the 12 quarters to 5 November 2026.

Mortgage registrations on homes per quarter. Source: DLD.

Mortgage registrations in the last 4 quarters (2026-Q1 to 2026-Q4): 6; registered amount AED 8.5M.

Since the first registration in 2021-Q4: 51 in all.

Counts DLD's mortgage registrations on homes in this project, including pre-registrations on off-plan units and lease-to-own registrations; portfolio and developer mortgages are left out. Amounts are the values DLD registers, shown for 5 registrations or more. A registration says nothing about the lender or the terms.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 4 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
9 October 2026readyApartment · 2 BR 1,413 1,480,000 1,047
29 April 2026readyApartment · 2 BR 1,413 1,800,000 1,274
16 February 2026readyApartment · 2 BR 1,413 1,750,000 1,238
12 February 2026readyApartment · 2 BR 1,503 1,875,000 1,248
1 May 2025readyApartment · 2 BR 1,642 2,050,000 1,248
10 April 2025readyApartment · 2 BR 1,412 1,950,000 1,381
11 October 2024readyApartment · 3 BR 2,250 2,000,000 889
2 October 2024readyApartment · 1 BR 844 1,000,000 1,185
1 October 2024readyApartment · 2 BR 1,642 1,700,000 1,035
17 September 2024readyApartment · 2 BR 1,503 1,500,000 998

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

LocationWadi Al Safa 3 · Dubai Municipality community

Kent College · 370 mPark · 540 maswaaq · 860 mPark · 950 mProject location© OpenStreetMap contributors · Dubai Municipality · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallAvenue mall · 2.1 km
Supermarketaswaaq · 860 m
HospitalHLG Umar · 3.2 km
SchoolKent College · 370 m
ParkPark · 540 m
BeachBeach · 2.8 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 39, with 2,164 units and villas.

2026: 1862027: 1,4822028: 496No end date: 0

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 3: 95

Open projects in the same DLD area, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Binghatti Vintage 0% Mar 2027 1,842 1,522
Binghatti Skyflame 1 0% Dec 2027 1,400 913
Binghatti Titania 0% Feb 2027 1,609 727
Samana Barari Heights 4% Oct 2028 1,826 693
Samana Barari Lagoons 16.5% Mar 2028 1,585 524
Binghatti Skyflame 2 0% Dec 2027 1,404 480
Rabdan Gates 5.2% Jun 2028 1,207 428
The Wilds 3 3.1% May 2029 — 399
Living Legends Phase 5 48.9% Mar 2025 1,430 360
Taormina Village 1 20.4% Dec 2027 2,415 300
The Wilds 2 5.7% Feb 2029 — 255
Lazord By Lapis 27.6% Dec 2026 1,458 252

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 3

Developer in DLD data Arloid Real Estate Development L.L.C FZ · DLD developer no. 1156

Projects registered
1
1 completed · 0 under construction · 0 not started
Units delivered
60
0 in the pipeline

Completed a month or more after their DLD end date: 0 of 1 completed projects with both dates. In 1 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Mohammed Bin Rashid AL Maktoum District 11

DLD lists 43 projects in the master project Mohammed Bin Rashid AL Maktoum District 11.

Lua ResidencesUnder construction · 64.4% · Mar 2026
The Woodland ResidencesUnder construction · 75.4% · Apr 2026
The Waterside Villas By EllingtonUnder construction · 45% · Jun 2026
The Lakeview Villas By EllingtonUnder construction · 20.1% · Aug 2026
The Beachfront Villas By EllingtonUnder construction · 47.4% · Aug 2026
Koyo Residence by Fuji PropertiesUnder construction · 30.7% · Sep 2026
High Best TowerUnder construction · 90.6% · Nov 2026
Numa ReserveUnder construction · 10.3% · Dec 2026
The Cube Quarter ResidencesUnder construction · 57% · Dec 2026
Wadi Villas by AristaUnder construction · 60.4% · Dec 2026
Mira Villas designed by Bentley HomeUnder construction · 31.8% · Dec 2026
Nineteen Riviera LagoonUnder construction · 34.1% · Feb 2027

Questions about Grenland Residence By arloid

When was Grenland Residence By arloid completed?

Grenland Residence By arloid is recorded as completed on 10 August 2021 (DLD register of 1 November 2026).

Who is the developer of Grenland Residence By arloid?

Arloid Real Estate Development L.L.C FZ, as registered with DLD.

What is the DLD project number of Grenland Residence By arloid?

1915.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error