Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3056Under construction407 units

Me Do Re 2 مي دو ري 2 Al Thanyah Fifth · DMCC Master Community by Me Do Re Developments DMCCAll phases of DMCC Master Community 97.8% built (DLD register as of 1 November 2026) DLD end date Dec 2025 past its DLD end date by 10 months DLD register as of 1 November 2026. DLD still lists the project as under construction.

Jumeirah Lake Towers skyline beside Sheikh Zayed Road
Area photo: Jumeirah Lake Towers, not this project
% built
97.8%
DLD register, 1 November 2026
Period elapsed
116%
Oct 2020 → Dec 2025
Past the DLD end date
10 months
No end-date change in the exports we hold
Developer
1 past end date
of 1 under construction with an end date

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
97.8%Elapsed
116%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 97.8% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 97.8% built on 9 March 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
9 March 2026 97.8% DLD inspection
20 May 2025 95.5% DLD inspection
12 May 2024 80% DLD register, archived export
1 May 2024 80.5% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Changes in the DLD register

1 Nov 2026Construction completed: 97.8% → 97.8%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Final works.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
332250
Issued
1 April 2020
Work start
11 October 2020
Expected completion
10 October 2022
Consultant · contractor
ARCHITECTURE & PLANING GROUP L.L.C · DUBAI CIVIL ENGINEERING(LLC)
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Final works1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3056
Escrow agent
Commercial Bank of Dubai(PSC)
Zoning authority
Dubai Municipality
Master project
DMCC Master Community
DLD area
Al Thanyah Fifth
Units · villas
407 · 0
Start → DLD end
Oct 2020 → Dec 2025
Registered unitsStudio 68 · 1 bed 204 · 2 bed 103 · 3 bed 19 · 4 bed 2; sizes 905–1,216 sqft

Also registered: shops and showrooms 11.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: 4B+1UB+G+39Floor+1 Mech Floor+Roof+Upper Roof Residential Building located on Plot No. 26, Cluster G, Jumeirah Lakes Towers, Dubai, UAE

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
2,227 AED/sqft
Median of 127 off-plan sales in the 90 days from the first one (Aug 2024)
Latest registered sales
2,482 AED/sqft
Median of 10 home sales in the last 12 months, ready and off-plan

Dubai Statistics Center residential price index (flats), 2024-Q3 to 2026-Q2: +7.1%.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 18 — —
1 BR 141 — —
2 BR 62 — —
3 BR 16 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2024-Q3 → 2026-Q3

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Al Thanyah Fifth, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Al Thanyah Fifth

New Ejari rent contracts for apartments across DLD area Al Thanyah Fifth, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 58,000 1,004 -3.3%
1 BR AED 82,000 2,305 -3.5%
2 BR AED 120,000 1,149 -4%
3 BR AED 165,000 270 -2.9%
4 BR AED 250,000 20 +8.7%
5 BR AED 490,000 9 —

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Service charges

What owners pay a year in completed buildings of the project’s master community, from their owners’ association budgets. A building’s own charge is set by its own budget.

Apartment buildings’ budgets; villa and townhouse budgets are left out.
16.76 AED/sqft a year
DMCC Master Community: median of 32 developments’ owners’ association budgets, 2026

Median AED per sq ft a year of residential owners’ association budgets, each development counted once, in the newest budget year with at least 10 developments. Plots, shared areas and hotel rooms are left out. A budget is not any one owner’s bill.

Source: Dubai Land Department, owners’ association budgets (service charges).

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 10 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
24 September 2026off-planApartment · 3 BR 2,010 4,626,000 2,301
3 September 2026off-planApartment · Studio 427 1,260,000 2,951
8 July 2026off-planApartment · 2 BR 1,311 2,812,000 2,145
29 June 2026off-planApartment · Studio 427 1,060,000 2,482
19 March 2026off-planApartment · Studio 427 1,245,000 2,916
16 March 2026off-planApartment · 1 BR 1,230 2,772,000 2,254
30 January 2026off-planApartment · 2 BR 1,217 3,000,000 2,465
21 November 2025off-planApartment · 1 BR 1,241 3,176,000 2,559
13 November 2025off-planApartment · 1 BR 991 2,700,000 2,725
6 November 2025off-planApartment · 2 BR 1,000 2,495,000 2,495

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Me Do Re 2 or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Not enough registered off-plan sales for an estimate (at least 5 of one bedroom count in 12 months).

Automated estimate, not a valuation

Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Portal asking median for off-plan units here: 2,590 AED/sqft (41 asks, last 30 days), against 2,482 AED/sqft in the latest registered sales.

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Me Do Re 2? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Dec 2025); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Dec 2026
DLD end date has passed
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Me Do Re 2? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationAl Thanyah Fifth · Dubai Municipality community

KP Mart · 90 mSunrise Supermarket JLT · 90 mEdelweiss Market · 130 mJumeirah Lakes Towers Park · 440 mDMCC Metro Station · 560 mDubai Marina Mall · 610 mJumeirah Lakes Towers · 650 mDubai Marina Mall · 720 mPark · 770 mPark · 1 kmDAMAC Properties Metro Station · 1 kmLux Aeterna Clinic · 1.3 kmEmirates International School - Meadows · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationDMCC Metro Station · Red Metro line · 560 m
Tram stopDubai Marina Mall · Tram line · 610 m
MallDubai Marina Mall · 720 m
SupermarketKP Mart · 90 m
HospitalLux Aeterna Clinic · 1.3 km
SchoolEmirates International School - Meadows · 1.4 km
ParkJumeirah Lakes Towers Park · 440 m
BeachMarina Beach Dubai · 1.6 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 28, with 17,035 units and villas.

2023: 9262025: 2,6662026: 3,2772027: 2,2302028: 1,6492029: 1,7052030: 2,956No end date: 1,626

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Al Thanyah Fifth: 22

Open projects in the same DLD area with a DLD end year from 2024 to 2026, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Seven City Jlt 28.4% Nov 2025 — 325
Uh West By Ellington 83.7% Mar 2026 1,921 127
Uh East By Ellington 62.8% Mar 2026 1,905 102
Viewz 2 By Danube 65% Jun 2026 2,412 64
Viewz 1 By Danube 66.5% Jun 2026 2,153 58
Project 3296, Al Thanyah Fifth 30% Mar 2025 — 0
Project 459, Al Thanyah Fifth 0% Dec 2026 — 0

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Al Thanyah Fifth

Developer in DLD data Me Do Re Developments DMCC · DLD developer no. 1295

Projects registered
1
0 completed · 1 under construction · 0 not started
Units delivered
0
407 in the pipeline
Past the DLD end date
1
of 1 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in DMCC Master Community

DLD lists 68 projects in the master project DMCC Master Community.

The Wind Tower IUnder construction · 74.6% · Jun 2023
The Wind Tower IiUnder construction · 84.5% · Jun 2023
Uh West By EllingtonUnder construction · 83.7% · Mar 2026
Uh East By EllingtonUnder construction · 62.8% · Mar 2026
Viewz 1 By DanubeUnder construction · 66.5% · Jun 2026
Viewz 2 By DanubeUnder construction · 65% · Jun 2026
MBL SignatureUnder construction · 60.1% · Mar 2027
Saba 4Under construction · 30.4% · Jun 2027
Verde by SobhaUnder construction · 85% · Jun 2027
Mercer HouseUnder construction · 18.1% · Jul 2027
Signature Lifestyle ResidencesUnder construction · 8.1% · Dec 2028
ME DO RE BusinessUnder construction · 24.5% · Sep 2029

Questions about Me Do Re 2

When is Me Do Re 2's handover?

DLD lists an end date of Dec 2025 (register of 1 November 2026); the SPA sets the handover terms.

Is Me Do Re 2 past its DLD end date?

Yes. Its DLD end date is Dec 2025, 10 months before the register of 1 November 2026.

How far along is Me Do Re 2?

97.8% built in the DLD register of 1 November 2026.

Who is the developer of Me Do Re 2?

Me Do Re Developments DMCC, as registered with DLD.

What is the DLD project number of Me Do Re 2?

3056.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error