DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 4228Under construction60 units

MIORAH By Zoya ميورا باي زويا Madinat Al Mataar · Dubai South Residential District by Zoya One Real Estate Developments L.L.CAll phases of Dubai South Residential District 16.1% built (DLD register as of 1 November 2026) DLD end date Aug 2027 9 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
16.1%
DLD register, 1 November 2026
Period elapsed
52%
Dec 2025 → Aug 2027
Latest sales
1,411 AED/sqft
-7.2% on launch 24 sales
Studio estimate
0.62–0.66 M AED
Automated estimate, not a valuation
Developer
14 projects
0 completed · 0 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
16.1%Elapsed
52%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 16.1% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 16.1% built on 20 July 2026 (inspections: 3).
Every DLD inspection and every change in the register %, newest first
Date % built Source
20 July 2026 16.1% DLD inspection
6 May 2026 6.9% DLD inspection
26 November 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedMay 2025 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 28 April 2023 to 7 June 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 16.1% → 16.1%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
4228
Escrow agent
Emirates Nbd Bank (P.J.S.C)
Zoning authority
Dubai South
Master project
Dubai South Residential District
DLD area
Madinat Al Mataar
Units · villas
60 · 0
Start → DLD end
Dec 2025 → Aug 2027
Registered unitsStudio 28 · 2 bed 32; sizes 399–968 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: G+4+R RESIDENTIAL VERTICAL BUILDING

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft
Launch price
1,419 AED/sqft
Median of 15 off-plan sales in the 90 days from the first one (Jan 2026)
Latest registered sales
1,411 AED/sqft
Median of 24 home sales after the launch window, in the last 12 months
Change
-7.2%
Same home types on both sides, weighted by the later sales

Dubai Statistics Center residential price index (flats), 2026-Q1 to 2026-Q2: -3.2%.

Prices are over apartments, the type most sales in this project are.

Median AED/sqft (number of sales) by bedroom count, where both periods have at least 5 sales
Bedrooms Launch price Latest registered sales Change
Studio 1,636 (6) 1,608 (5) -1.7%
2 BR 1,400 (9) 1,202 (9) -14.1%
Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
Studio 18 1,608 (5) May 2026 – Nov 2026
2 BR 21 1,202 (9) May 2026 – Nov 2026

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2026-Q1 → 2026-Q2

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Madinat Al Mataar, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Madinat Al Mataar

New Ejari rent contracts for apartments across DLD area Madinat Al Mataar, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 41,000 818 +2.5%
1 BR AED 56,500 1,084 +0.9%
2 BR AED 85,000 1,080 0%
3 BR AED 120,000 182 0%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 39 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
16 June 2026off-planApartment · 2 BR 1,047 1,234,465 1,179
16 June 2026off-planApartment · 2 BR 1,047 1,202,340 1,148
9 June 2026off-planApartment · 2 BR 1,047 1,258,264 1,202
9 June 2026off-planApartment · 2 BR 1,047 1,258,264 1,202
9 June 2026off-planApartment · 2 BR 968 1,149,623 1,188
9 June 2026off-planApartment · 2 BR 795 1,121,714 1,411
9 June 2026off-planApartment · 2 BR 795 1,027,521 1,292
9 June 2026off-planApartment · 2 BR 865 1,003,154 1,160
9 June 2026off-planApartment · Studio 406 586,670 1,445
9 June 2026off-planApartment · Studio 405 544,217 1,344

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in MIORAH By Zoya or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Estimated value range
Bedrooms Range, AED Based on Compared at
Studio 620,000 – 660,000 18 sales, 12 months This project
2 BR 1,090,000 – 1,260,000 21 sales, 12 months This project
Automated estimate, not a valuation

Estimate as of 5 November 2026 Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in MIORAH By Zoya? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Aug 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Aug 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in MIORAH By Zoya? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationMadinat Al Mataar · Dubai Municipality community

Mag 5 Park area · 560 mPark · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationEXPO Metro Station · Red Metro line · 8.1 km
MallRijat Retail Mall-12 · 4.6 km
SupermarketSupermarket · 1.6 km
HospitalNMC dip · 9.2 km
ParkMag 5 Park area · 560 m

Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 82, with 6,412 units and villas.

2019: 1082020: 2092025: 1132026: 5592027: 1,6012028: 2,5112029: 1,0212030: 290No end date: 0

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Madinat Al Mataar: 167

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Azizi Venice 14 30.3% May 2026 1,649 2,546
Azizi Venice 6 11.6% Dec 2027 2,032 1,302
Azizi Venice 7 29.2% Jan 2026 1,849 1,180
Azizi Venice 15 0% May 2027 1,715 904
azizi venice 13 45.9% Sep 2027 1,675 797
azizi venice 12 21.6% Sep 2027 1,685 753
Azizi Venice 11 25.9% Aug 2027 1,667 696
South Square 2.6% Jun 2028 1,473 428
Expo City Sidr Residences 25% Mar 2028 2,088 423
Azizi Venice 16 0% Jun 2027 1,898 310
Expo City Al Waha Residences 01 65.8% Jun 2027 2,515 286
Expo City Al Waha Residences 02 61.4% Jun 2027 2,550 273

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Madinat Al Mataar

Developer in DLD data Zoya One Real Estate Developments L.L.C · DLD developer no. 1816

Projects registered
14
0 completed · 3 under construction · 11 not started
Units delivered
0
1,168 in the pipeline
Past the DLD end date
0
of 3 under construction with a DLD end date

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Dubai South Residential District

DLD lists 119 projects in the master project Dubai South Residential District.

South LivingUnder construction · 88.8% · Feb 2020
South Bay 1Under construction · 93.7% · Mar 2025
The HarmonyUnder construction · 97.8% · Oct 2025
Orchid Residence 1Under construction · 48.5% · Mar 2026
South Bay 2Under construction · 93.8% · May 2026
Bling Avenue 1Under construction · 68.3% · Jul 2026
Views VII by Golden WoodsUnder construction · 90.4% · Jul 2026
Cresswell PlazaUnder construction · 60.1% · Sep 2026
VOI Residence by HVM LivingUnder construction · 15.6% · Sep 2026
Lincoln Star ResidenceUnder construction · 47.2% · Sep 2026
The SereneUnder construction · 46.3% · Oct 2026
The Eighty ThreeUnder construction · 60% · Dec 2026

Questions about MIORAH By Zoya

When is MIORAH By Zoya's handover?

DLD lists an end date of Aug 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is MIORAH By Zoya past its DLD end date?

No. Its DLD end date is Aug 2027, 9 months after the register of 1 November 2026.

How far along is MIORAH By Zoya?

16.1% built in the DLD register of 1 November 2026.

Who is the developer of MIORAH By Zoya?

Zoya One Real Estate Developments L.L.C, as registered with DLD.

What is the DLD project number of MIORAH By Zoya?

4228.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error