Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3021Under construction244 units

Riwa رِوى Um Suqaim Third by Jumeirah Hills Development L.L.C 12.5% built (DLD register as of 1 November 2026) no DLD end date registered DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

Madinat Jumeirah waterways with the Burj Al Arab, Umm Suqeim
Area photo: Umm Suqeim, not this project
% built
12.5%
DLD register, 1 November 2026
Latest sales
—
Fewer than 5 recent sales
Developer
10 projects
7 completed · 2,184 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built

1 November 2026
Built
12.5%
Latest DLD register reading: 12.5% built on 1 November 2026 (register readings: 3). Latest DLD inspection: 30% built on 3 November 2026 (inspections: 9).
Every DLD inspection and every change in the register %, newest first
Date % built Source
3 November 2026 30% DLD inspection
20 July 2026 12.5% DLD inspection
30 April 2026 6.5% DLD inspection
23 January 2026 3.3% DLD inspection
23 October 2025 0.2% DLD inspection
31 July 2025 0% DLD inspection
7 May 2025 0% DLD inspection
12 February 2025 0% DLD inspection
28 March 2024 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Earlier readings: archived DLD projects exports of 12 May 2024. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJan 2023 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 18 April 2022 to 7 June 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 12.5% → 12.5%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3021
Escrow agent
First Abu Dhabi Bank P.J.S.C.
Zoning authority
Dubai Development Authority (DDA)
DLD area
Um Suqaim Third
Units · villas
244 · 0
Start → DLD end
Sep 2024 → —
Registered units1 bed 103 · 2 bed 110 · 3 bed 30 · 4 bed 1; sizes 742–1,722 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: 3 Residential Buildings comprising of 244 Residential units (1Bedrooms =103, 2Bed rooms=110, 3Bed room =30, 4Bed room=1) Riwa Building 1 : B+G+10+R (86 Resi.Units) Riwa Building 2 : B+G+10+R (79 Resi.Units) Riwa Building 3 : B+G+10+R (79 Resi.Units)

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

Fewer than 5 home sales after the launch window in the last 12 months, so no comparison is shown.

Dubai Statistics Center residential price index (flats), 2024-Q2 to 2026-Q2: +10.2%.

Prices are over apartments, the type most sales in this project are.

Registered sales of apartments by bedroom count over the last 24 months, and the median AED/sqft of the latest off-plan sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
1 BR 7 — —
3 BR 19 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2024-Q2 → 2026-Q3

Median AED/sqft of registered sales per quarter (apartments). Source: DLD. Grey dashed line: DLD area Um Suqaim Third, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents in DLD area Um Suqaim Third

New Ejari rent contracts for apartments across DLD area Um Suqaim Third, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 115,000 313 -10.2%
2 BR AED 190,000 194 -11.6%
3 BR AED 275,000 43 -16.7%
4 BR AED 415,000 12 -17%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 2 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
29 September 2026off-planApartment · 2 BR 1,255 3,326,000 2,650
22 June 2026off-planApartment · 3 BR 1,222 321,300 263
6 October 2025off-planApartment · 3 BR 2,001 6,130,000 3,063
23 July 2025off-planApartment · 2 BR 1,737 4,241,000 2,442
26 June 2025off-planApartment · 3 BR 2,327 6,426,000 2,761
26 May 2025off-planApartment · 3 BR 2,030 6,355,000 3,131
15 May 2025off-planApartment · 3 BR 2,001 6,189,000 3,093
25 March 2025off-planApartment · 3 BR 2,030 6,418,000 3,162
14 February 2025off-planApartment · 3 BR 1,990 6,434,000 3,233
24 December 2024off-planApartment · 1 BR 742 2,481,000 3,344

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Looking for a unit in this or similar projects?

Tell us what you are looking for in Riwa or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Not enough registered off-plan sales for an estimate (at least 5 of one bedroom count in 12 months).

Automated estimate, not a valuation

Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Riwa? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. DLD has no end date for this project, so handover starts a year from now; move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Nov 2027
No end date registered
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Riwa? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationUmm Suqeim Third · Dubai Municipality community

Kings' Dubai · 630 mRaffles International School · 730 mAswaaq · 790 mThe Emirates Academy Of Hospitality Management · 890 mPark · 1 kmPark · 1.1 kmSouk Madinat Jumeirah · 1.1 kmMall of the Emirates Metro Station · 1.1 kmRaffles World Academy · 1.2 kmFMC medical centre · 1.2 kmThe Mall · 1.2 kmGetchecked Clinic · 1.2 kmFirst Abu Dhabi Bank Metro Station · 1.3 kmPark · 1.3 kmBeach · 1.3 kmStandard Medical Clinic · 1.3 kmCarrefour · 1.3 kmCentre for Musical Arts · 1.4 kmMall of The Emirates · 1.4 kmWaitrose · 1.4 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Metro and tram Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationMall of the Emirates Metro Station · Red Metro line · 1.1 km
MallSouk Madinat Jumeirah · 1.1 km
SupermarketAswaaq · 790 m
HospitalFMC medical centre · 1.2 km
SchoolKings' Dubai · 630 m
ParkPark · 1 km
BeachBeach · 1.3 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 2, with 474 units and villas.

2026: 2382029: 236

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Umm Suqeim Third: 2

Open projects in the same DLD area, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Nourelle 4% Mar 2029 4,204 220
Elara 64.3% Nov 2026 2,570 13

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Umm Suqeim Third

Developer in DLD data Jumeirah Hills Development L.L.C · DLD developer no. 1076

Projects registered
10
7 completed · 3 under construction · 0 not started
Units delivered
2,184
718 in the pipeline
Median build time
38 months
completed projects measured: 7
Past the DLD end date
0
of 2 under construction with a DLD end date

Completed a month or more after their DLD end date: 3 of 7 completed projects with both dates. In 3 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Riwa

When is Riwa's handover?

DLD lists no end date for it (register of 1 November 2026); the SPA sets the handover terms.

How far along is Riwa?

12.5% built in the DLD register of 1 November 2026.

Who is the developer of Riwa?

Jumeirah Hills Development L.L.C, as registered with DLD.

What is the DLD project number of Riwa?

3021.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error