Skip to content
DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3998Completed185 units

Al Waha ?????? Wadi Al Safa 7 · Al Waha Villas by Dubai Land Residences (L.L.C) Completed (DLD) DLD end date Sep 2009 DLD register as of 1 November 2026 DLD register as of 1 November 2026. Dates are the ones registered with DLD.

Completed projects cannot be added to My units.

Completed
—
DLD end date Sep 2009
Latest sales
1,156 AED/sqft
5 sales
3 BR rent
200,000 AED/yr
17 leases, 12 months
Developer
3 projects
3 completed · 188 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built

28 October 2026
Built
100%

Fewer than two dated readings so far, so there is no chart yet.

DLD has no site-inspection readings for this project in our copy.

Every DLD inspection and every change in the register %, newest first
Date % built Source
28 October 2026 100% DLD register

Source: Dubai Land Department projects register, as of 1 November 2026.

Site timeline

± 6 months

Our imagery reading holds no milestone for this project yet.

Our reading of historical satellite imagery

Registered period and actual build

Registered period
36 months
Start date
1 September 2006
DLD end date
1 September 2009
Completion date
—
Completion vs DLD end date
—

Source: DLD projects register. Build time: our calculation from DLD’s start and completion dates.

Changes in the DLD register

No change to the end date, status or % built across the register exports we hold.

Source: DLD projects register exports, compared by CraneScore. Planned dates against DLD's completion date. In 69% of completed projects in the register the completion date and the DLD end date are the same day, which suggests DLD sets the end date at completion, so this comparison can show no gap where there was one.

Building permits

1 of 1 buildings

Buildings on the project’s plots: 1, on construction permits: 1, as Dubai Municipality lists them.

Furthest stage reached: Completed.

Work not started
Site works
Foundations
Structure
Masonry
Finishes
Final works
Completed
Buildings
1
1 on construction permits
Permit status
Open
274734
Issued
30 December 2015
Work start
31 December 2015
Consultant · contractor
ARKAN ENGINEERING CONSULTANCY L.L.C · NOVA WAY CONTRACTING L.L.C
Buildings by the furthest work stage Dubai Municipality lists
Work stage Buildings
Completed1

Source: Dubai Municipality building permits, export of 26 October 2026. These dates and stages are Dubai Municipality’s records, not DLD’s register.

DLD registration

DLD services ↗
DLD project number
3998
Zoning authority
Dubai Development Authority (DDA)
Master project
Al Waha Villas
DLD area
Wadi Al Safa 7
Units · villas
0 · 185
Start → DLD end
Sep 2006 → Sep 2009
Registered unitsStudio 42 · 1 bed 33 · 2 bed 56 · 3 bed 167 · 4 bed 82; sizes 1,416–3,473 sqft

Homes: flats 195 · villas 185.

Also registered: offices 14.

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: residential gated community contains 655 villas

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

This project's first registered off-plan sale is before 1 March 2020, near the start of our sales data, so its launch may be older and no launch price is shown.

Prices are over villas and townhouses, the type most sales in this project are.

Registered sales of villas and townhouses by bedroom count over the last 24 months, and the median AED/sqft of the latest ready sales (number of sales)
Bedrooms Sales, 24 months Latest median AED/sqft Latest sales
3 BR 5 — —

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Median AED/sqft by quarter

2020-Q1 → 2026-Q4

Median AED/sqft of registered sales per quarter (villas and townhouses). Source: DLD. Grey dashed line: DLD area Wadi Al Safa 7, median AED/sqft of ready sales of villas and townhouses by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Registered sales per quarter

Registered sales per quarter, off-plan and ready units. Source: DLD.

Rents and gross yield

New Ejari rent contracts for villas and townhouses in this project, 12 months to 5 November 2026, against the 12 months before. Fewer than 10 ready sales per bedroom count in those 12 months, so no yield is shown.

Bedrooms Median annual rent New contracts Change on a year earlier
3 BR AED 200,000 17 -2.4%
4 BR AED 225,000 6 -11.8%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Mortgage registrations

Home mortgages DLD has registered on units in this project, per quarter, in the 12 quarters to 5 November 2026.

Mortgage registrations on homes per quarter. Source: DLD.

Mortgage registrations in the last 4 quarters (2026-Q1 to 2026-Q4): 25; registered amount AED 71.3M.

Since the first registration in 2010-Q3: 258 in all.

Counts DLD's mortgage registrations on homes in this project, including pre-registrations on off-plan units and lease-to-own registrations; portfolio and developer mortgages are left out. Amounts are the values DLD registers, shown for 5 registrations or more. A registration says nothing about the lender or the terms.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Registered sales

The newest sales DLD has registered in this project, as DLD publishes them.

The newest 10 of 15 registered sales in the 12 months to 5 November 2026
DateMarketType Size (sqft) Price (AED) AED/sqft
26 October 2026readyVilla 5,261 4,200,004 798
21 August 2026readyVilla · 4 BR 3,581 4,999,999 1,396
21 August 2026readyVilla · 3 BR 1,951 4,000,000 2,050
23 July 2026readyVilla 6,153 4,425,000 719
3 June 2026readyVilla 4,822 5,575,000 1,156
4 May 2026readyVilla 5,264 4,980,000 946
30 March 2026readyVilla 4,248 5,200,000 1,224
5 March 2026readyVilla 6,056 4,575,000 755
25 February 2026readyVilla 5,840 5,500,000 942
2 February 2026readyVilla 5,402 4,950,000 916

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

LocationWadi Al Safa 7 · Dubai Municipality community

West Zone Supermarket · 220 mChoitram · 360 mSpinneys · 430 mPark · 520 mPark · 530 mPark · 530 mGems Metropole School · 630 mRanches Primary School · 1.3 kmSchool · 1.3 kmApproximate project location© OpenStreetMap contributors · Dubai Municipality · Makani
Approximate project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

MallArabian Ranches Community Center · 3.5 km
SupermarketWest Zone Supermarket · 220 m
HospitalKings Hospital · 9.8 km
SchoolGems Metropole School · 630 m
ParkPark · 520 m

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors

New homes within 1.5 km

Open projects within 1.5 km of the pin: 6, with 2,141 units and villas.

2022: 112028: 02029: 02030: 2,130

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Wadi Al Safa 7: 6

Open projects in the same DLD area, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Reportage Village 1 25% Dec 2027 1,240 1,101
The Acres 2 & Estates 2 14.9% May 2028 — 208
The Acres 3 & Estates 14.9% Nov 2027 — 152
The Acres 25.2% — — 107
Mayfair Nexus by Seven Mayfair 0.6% Dec 2028 1,473 23
Palmarosa 97.8% Oct 2022 — 11

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Wadi Al Safa 7

Developer in DLD data Dubai Land Residences (L.L.C) · DLD developer no. 899

Projects registered
3
3 completed · 0 under construction · 0 not started
Units delivered
188
0 in the pipeline

Completed a month or more after their DLD end date: 0 of 2 completed projects with both dates. In 0 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Questions about Al Waha

When was Al Waha completed?

Al Waha is recorded as completed, without a completion date (DLD register of 1 November 2026).

Who is the developer of Al Waha?

Dubai Land Residences (L.L.C), as registered with DLD.

What is the DLD project number of Al Waha?

3998.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error