DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

DLD project no. 3674Under construction48 units

Al Warsan Star نجمة ورسان Al Warsan First · Warsan First Development by Rose Homes Investment (L.L.C)All phases of Warsan First Development 7.5% built (DLD register as of 1 November 2026) DLD end date Feb 2027 3 months to go DLD register as of 1 November 2026. The end date is the one registered with DLD, not a handover forecast.

% built
7.5%
DLD register, 1 November 2026
Period elapsed
79%
Oct 2025 → Feb 2027
Latest sales
—
Fewer than 5 recent sales
Developer
5 projects
3 completed · 855 units delivered

CompletionDLD readings of % built, beside the share of the planned period gone

% built and period elapsed

1 November 2026
Built
7.5%Elapsed
79%

Two separate measures: one is DLD's % built, the other is time on the calendar.

Latest DLD register reading: 7.5% built on 1 November 2026 (register readings: 2). Latest DLD inspection: 7.5% built on 18 June 2026 (inspections: 2).
Every DLD inspection and every change in the register %, newest first
Date % built Source
18 June 2026 7.5% DLD inspection
26 September 2025 0% DLD inspection

Source: Dubai Land Department projects register, as of 1 November 2026. Source: Dubai Land Department, Project Status inspections (dates and % only), collected on 7 November 2026. DLD Project Status ↗ Period elapsed: our calculation from DLD’s start and end dates.

Our completion calculation

Pace since the last two DLD readings: —

Our calculation from DLD readings. It describes the recent pace only; it is not a forecast of the completion date.

Site timeline

± 6 months
Works startedJul 2025 ± 6 months
Structure risingNot seen yet
Topped outNot seen yet
FinishedNot seen yet

Each date is ± 6 months. This is our reading, not DLD's; no image is shown. Read from imagery dated 28 April 2023 to 18 February 2026; method imagery-v1.

Changes in the DLD register

1 Nov 2026Construction completed: 7.5% → 7.5%.

Source: DLD projects register exports, compared by CraneScore. Dates and progress are those in the Dubai Land Department projects register on each register date, not inspection dates. DLD can revise the end date; we keep every register reading from 28 October 2026 on and list the changes here.

Inspection photos and reports

DLD’s Project Status service (Mashrooi) shows inspection details and site photos. Look the project up by its number.

CraneScore links to DLD and does not copy or host its photos or reports.

DLD registration

DLD services ↗
DLD project number
3674
Escrow agent
Abu Dhabi Commercial Bank
Zoning authority
Dubai Development Authority (DDA)
Master project
Warsan First Development
DLD area
Al Warsan First
Units · villas
48 · 0
Start → DLD end
Oct 2025 → Feb 2027
Registered units1 bed 36 · 2 bed 12; sizes 825–1,332 sqft

Counts from DLD's units register; villas from its buildings register. Sizes: the middle half of the homes' registered areas (25th to 75th percentile), villas by built-up area. Source: Dubai Land Department open data (units and buildings registers, export of 5 November 2026), under the Dubai Data Open Data Licence.

Description in the DLD register: G+1P+6 Building

DLD's own services for this project, including the Dubai REST app: dubailand.gov.ae

Price historyRegistered sale prices for this project, in AED per sq ft, with the number of sales in each figure.

AED · sqft

No off-plan sales are registered for this project since 2020, so there is no launch price.

Launch price: median AED/sqft of the project's off-plan home sales in the 90 days from its first one, for a first sale on or after 1 March 2020; Skyline Index uses the same rule. Latest: home sales of the last 12 months after the launch window, ready and off-plan; the change compares the same home types. The bedroom table compares the launch window with the last 6 months (12 when 6 have fewer than 5 sales). Off-plan registrations include developer sales and resales; DLD open data does not tell them apart. Sales more than 4 times off the median are left out.

Rents in DLD area Al Warsan First

New Ejari rent contracts for apartments across DLD area Al Warsan First, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
Studio AED 31,700 4,304 +5.7%
1 BR AED 43,000 4,107 +4.9%
2 BR AED 60,000 827 +7.1%
3 BR AED 105,000 156 +5%

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Looking for a unit in this or similar projects?

Tell us what you are looking for in Al Warsan Star or similar projects. We reply by e-mail, and your request stays with CraneScore.

We send a 6-digit code to confirm it.
Bedrooms

Estimated value range

Not enough registered off-plan sales for an estimate (at least 5 of one bedroom count in 12 months).

Automated estimate, not a valuation

Track this unit

Automated estimate from registered off-plan sales (developer sales and resales mixed); not a valuation by a registered valuer; not for mortgage or court use.

Resale asking prices against the original price

Fewer than 5 resale offers with an original price are tracked for this project.

Across all Dubai off-plan resale offers we track: -3.9% (1,105 offers).

Median asking premium by share of the price already paid (number of offers); shown from 5 offers
Paid to the developer This project All Dubai
0–30% paid—0% (9)
30–50% paid—-5% (51)
50–70% paid—-1.5% (65)
70% paid or more—-3.5% (45)

Asking prices of off-plan resale offers we track, compared with each offer's original price, with the 4% DLD fee removed on both sides. A negative value means asking below the original price. Only aggregates of at least 5 offers are shown; no individual offer, seller or agent is.

Thinking of selling your unit?

Thinking of reselling your unit in Al Warsan Star? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

Payment scenarioEnter the developer’s plan to see what you pay and when. Handover starts at the DLD end date (Feb 2027); move it with the slider.

A scenario from your own inputs, not this project's verified payment plan.

Common plans

Plan shares add up to 100% (must be 100%).

Handover
Feb 2027
Paid by handover
AED 1,045,000
Fees included
Price paid at handover
100%
Total cost
AED 1,045,000
Fees: AED 45,000

Payments per quarter

AED

Payments per quarter, AED, fees included. Illustration from your inputs.

The DLD fee (4% of the price) and the fees above are paid at booking. With a resale price, the unit is sold at handover and the buyer takes over any unpaid balance; agent fees, mortgage costs and service charges are left out. An illustration from your inputs, not financial advice.

Mortgage for a unit here

Questions about financing a unit in Al Warsan Star? Leave your details and we reply by e-mail. Your request stays with CraneScore.

We send a 6-digit code to confirm it.

LocationWarsan First · Dubai Municipality community

Sanad Al Madina Supermarket · 610 mFriendly Supermarket · 880 mmarket Fruits and vegetables · 1 kmPark · 1.1 kmPark · 1.4 kmSharjah American International School Dubai · 1.4 kmNewlands School · 1.5 kmProject location© OpenStreetMap contributors · Dubai Municipality · RTA · Makani
Project location Malls and supermarkets Schools and hospitals Parks and beaches

Places near the project

Straight-line distances from the project’s map pin, rounded to 10 m. The nearest place of each kind.

Metro stationRashidiya Metro Station · Red Metro line · 6.3 km
MallDragon Mart Sun Tour · 1.7 km
SupermarketSanad Al Madina Supermarket · 610 m
HospitalFakeeh University Hospital · 5.9 km
SchoolSharjah American International School Dubai · 1.4 km
ParkPark · 1.1 km
BeachBeach · 3.3 km

School ratings: KHDA’s school directory ↗ · Report a wrong location

Dubai Municipality · Makani · © OpenStreetMap contributors · RTA

New homes within 1.5 km

Open projects within 1.5 km of the pin: 9, with 1,581 units and villas.

2026: 602027: 5742028: 947

Open projects within 1.5 km of the pin, by DLD end year Highlighted: this project’s DLD end year.

Open projects in Warsan First: 12

Open projects in the same DLD area with a DLD end year from 2026 to 2028, by registered sales in 24 months.

Project Built DLD end date AED/sqft, 12 mo Sales, 24 mo
Ayami Residence, By Ayat Development 0.1% Dec 2028 1,266 221
Longford Residences by Devan Real Estate Development 32.7% May 2028 1,055 174
YIGO26 1.1% Dec 2027 1,176 128
Ryze by AUM 0.1% Jun 2028 1,128 64
Crystal Tower 0.3% Dec 2028 1,199 24
Listone Residence 0% Aug 2027 — 17
Lusin Residences by Ermax Development 35% Dec 2026 — 5
Tomorrow Commercial Tower 70% Jul 2026 — 0
Orbit Residences by Jewel 0% Aug 2027 — 0
Longfor International Center 1.6% Dec 2027 — 0
06 Life Residences 0% Dec 2028 — 0
Project 4590, Al Warsan First 0% Dec 2028 — 0

AED/sqft: median of the project’s registered home sales in the last 12 months, ready and off-plan; a dash with too few sales.

Every project in Warsan First

Developer in DLD data Rose Homes Investment (L.L.C) · DLD developer no. 126

Projects registered
5
3 completed · 2 under construction · 0 not started
Units delivered
855
168 in the pipeline
Median build time
36 months
completed projects measured: 3
Past the DLD end date
1
of 2 under construction with a DLD end date

Completed a month or more after their DLD end date: 0 of 3 completed projects with both dates. In 2 of them the completion date equals the DLD end date, which DLD may set at completion, so this count can understate the gap.

Source: DLD projects register, export of 1 November 2026. Medians: our calculation, 3 projects or more.

Other projects in Warsan First Development

DLD lists 7 projects in the master project Warsan First Development.

Longfor International CenterUnder construction · 1.6% · Dec 2027
Listone ResidenceNot started · 0% · Aug 2027
Ryze by AUMNot started · 0.1% · Jun 2028
Crystal TowerNot started · 0.3% · Dec 2028
Ayami Residence, By Ayat DevelopmentNot started · 0.1% · Dec 2028
Olivz ResidenceCompleted · 100% · Jul 2023
Petalz By DanubeCompleted · 100% · Oct 2025

Questions about Al Warsan Star

When is Al Warsan Star's handover?

DLD lists an end date of Feb 2027 (register of 1 November 2026); the SPA sets the handover terms.

Is Al Warsan Star past its DLD end date?

No. Its DLD end date is Feb 2027, 3 months after the register of 1 November 2026.

How far along is Al Warsan Star?

7.5% built in the DLD register of 1 November 2026.

Who is the developer of Al Warsan Star?

Rose Homes Investment (L.L.C), as registered with DLD.

What is the DLD project number of Al Warsan Star?

3674.

Source: Dubai Land Department open data: projects register (export of 1 November 2026) and registered sales to 5 November 2026; Dubai Statistics Center price index. Methodology · Report a data error