DLD register · 1 Nov 20261,801 not completed1,239 under construction227 past DLD end date · median 7 mo238 registered to end in 2026487,805 units in pipeline
AED · sqft
Sign inTrack your unit

Have the DLD project number from your SPA or Oqood? Type it, for example 3334.

Menu

Account

Track my unit, freeSign in

E-mail and a 6-digit code. No password.

Language

Currency and area unit

Display and privacy

CraneScore is not part of, or affiliated with, the Dubai Land Department. Nobody can pay to change a figure. Contact · Privacy · Terms

Dubai Municipality communityDLD area Palm DeiraPalm Deira

Nakhlat Deira نخلة ديره 134 projects not yet completed · 14,885 units · 8,073 sales in 24 months DLD projects register as of 1 November 2026 · sales to 5 November 2026

Nakhlat Deira has 134 projects not yet completed in the Dubai Land Department projects register as of 1 November 2026, with 14,885 units and villas; its projects had 8,073 registered sales in the last 24 months.

Projects not yet completed
134
of 137 DLD projects here
Units not yet completed
14,885
units and villas
Sales, 24 mo
8,073
registered with DLD

Source: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026.

Projects on the map100 of the 100 projects listed have a map pin.

Hado By Beyond · Not started · Approximate project locationThe Meriva Collection · Not started · Approximate project locationEllington Sands I · Not started · Project locationEllington Sands Ii · Not started · Project locationBay Grove Residences C - Dubai Islands · Under construction · Project locationBay Grove Residences, Dubai Islands · Under construction · Project locationBay Grove Residences D - Dubai Islands · Under construction · Project locationFlora Isle · Under construction · Project locationBay Grove Residences B - Dubai Islands · Under construction · Project locationEdgewater Residences 3 · Under construction · Project locationWynwood Residences By Imtiaz · Under construction · Project locationCotier House 1 By Imtiaz · Under construction · Project locationSilena Residences · Under construction · Project locationOcean Bay by Samana Developers · Under construction · Project locationCotier House 2 By Imtiaz · Under construction · Project locationLiv Oceanside · Under construction · Project locationBeach Walk Grand 2 By Imtiaz · Under construction · Project locationBeach Walk Grand By Imtiaz · Under construction · Project locationEsme' Beach Residences · Under construction · Project locationVilla Del Divos Residences · Under construction · Project locationOCTA ISLE Interiors by MISSONI · Under construction · Project locationSunset Bay Grand By Imtiaz · Under construction · Project locationElle Residences · Not started · Project locationAyamore Residence · Under construction · Project locationSeacliff by Imtiaz · Under construction · Project locationEdgewater Residences 2 · Under construction · Project locationOcean Pearl 2 By SD · Under construction · Project locationShoaq · Under construction · Project locationHaven Bay Residences · Under construction · Project locationSeaside by Prestige One · Under construction · Project locationSunset Bay One By Imtiaz · Under construction · Project locationSunset Bay Two By Imtiaz · Under construction · Project locationCoastal Haven by Prestige Harbour Real Estate Development · Under construction · Project locationSunset Bay Three By Imtiaz · Under construction · Project locationSunset Bay Four By Imtiaz · Under construction · Project locationRena · Under construction · Project locationBeach Walk Residences 4 by Imtiaz · Under construction · Project locationZephyra Residences · Under construction · Project locationBonds Avenue Residences · Under construction · Project locationVilla del Gavi Residences · Under construction · Project locationNuvana by Wadan · Under construction · Project locationLia · Under construction · Project locationOcean Pearl By SD · Under construction · Project locationArya Residences by Citi Developers · Under construction · Project locationAllegro Residences · Under construction · Project locationLuxury Canal Residences · Under construction · Project locationSUNSET BAY FIVE by Imtiaz · Under construction · Project locationArka Enclave Residences · Under construction · Project locationWhitecliffs Residences · Under construction · Project locationHatimi Residences By Fakhruddin · Under construction · Project locationTreppan Serenique Residences · Under construction · Project locationMeriden Beach by Green Horizon · Under construction · Project locationHermina By Casagrand Gallantee Real Estate · Under construction · Project locationIsolana Residences · Under construction · Project locationDreamlife Residences · Under construction · Project locationMackerel Tower · Under construction · Project locationHouse Of Well · Under construction · Project locationWellington Ocean Walk · Under construction · Project locationVilla dell Arte · Not started · Project locationBeach Walk Residences 3 By Imtiaz · Under construction · Project locationFlora Shore by Calgary Properties · Under construction · Project locationAvida Residences · Under construction · Project locationVestoria Bay · Under construction · Project locationAgua Residences by Citi Developers - Tower 1 · Under construction · Project locationAzura Residences · Under construction · Project locationTomorrow 166 · Under construction · Project locationBeach Residences Dubai Islands · Under construction · Project locationAgua Residences by Citi Developers - Tower 2 · Under construction · Project locationSea Legend One By Mvs Real Estate · Under construction · Project locationWellington Ocean by ANK Motiwala Developments · Under construction · Project locationCapital Horizon Terraces · Under construction · Project locationIluka Residences · Under construction · Project locationFlow Residences · Under construction · Project locationLuzora Residences · Under construction · Project locationNautis Residences · Under construction · Project locationAllegro Park by Mill Hill Riviera Development · Under construction · Project locationNatuzzi Harmony Residences by Peace Homes · Under construction · Project locationEdgewater Residences · Under construction · Project locationBayview Boulevard · Under construction · Project locationFloarea Breeze · Under construction · Project locationOcean Tower · Under construction · Project locationAquora by Casa Vista Development · Under construction · Project location997 Residences by Reef Luxury Development · Under construction · Project locationBlue Marina Residence by Shakirov Developments · Under construction · Project locationFiroza · Not started · Project location241 Waterside · Not started · Project locationBay Residences Dubai Islands · Under construction · Approximate project locationSea Coral By Next Realty · Under construction · Project locationSea View Residence By Sama Mayas · Under construction · Project locationVilla Del Brunello Residences · Under construction · Project locationLiora · Not started · Project locationKaia · Not started · Project locationOcean Crest by SD · Under construction · Project locationHelvetia Marine · Not started · Project locationVue Doree · Under construction · Project locationTivanno Residence · Under construction · Project locationSoma Residences · Not started · Project locationMarea · Under construction · Project locationMaravea Residences · Not started · Project locationThe Tides By Amis · Not started · Project locationDubai Municipality · Makani
Under construction Not started Approximate project locations

Projects not yet completed (100)Projects not yet completed in Nakhlat Deira, by registered sales in 24 months

Projects not yet completed in Nakhlat Deira, by registered sales in 24 months
Project Developer DLD status Built DLD end date Past DLD end date Sales, 24 mo
Hado By Beyond4210 · Palm DeiraSandy Shores Real Estate L.L.C S.O.C Not started 0% Jun 2029 31 mo to go— 629
The Meriva Collection4346 · Palm DeiraCrestarc Developers L.L.C Not started 0.1% Dec 2031 61 mo to go— 511
Ellington Sands I4139 · Palm DeiraEllington Properties Development L.L.C Not started 0.4% Dec 2028 25 mo to go— 434
Ellington Sands Ii4140 · Palm DeiraEllington Properties Development L.L.C Not started 0.4% Dec 2028 25 mo to go— 428
Bay Grove Residences C - Dubai Islands3415 · Palm DeiraDubai Islands L.L.C Under construction 7.3% Apr 2028 17 mo to go— 369
Bay Grove Residences, Dubai Islands3293 · Palm DeiraDubai Islands L.L.C Under construction 12.3% Mar 2028 16 mo to go— 307
Bay Grove Residences D - Dubai Islands3785 · Palm DeiraDubai Islands L.L.C Under construction 3.7% Sep 2028 22 mo to go— 258
Flora Isle3440 · Palm DeiraFlora Isle Real Estate Development L.L.C Under construction 11.3% Jan 2028 14 mo to go— 242
Bay Grove Residences B - Dubai Islands3631 · Palm DeiraDubai Islands L.L.C Under construction 7.6% Sep 2028 22 mo to go— 242
Edgewater Residences 33177 · Palm DeiraM G S Development L.L.C Under construction 30.4% Jan 2027 2 mo to go— 147
Wynwood Residences By Imtiaz3784 · Palm DeiraImtiaz Gi Real Estate Development L.L.C Under construction 26.3% Sep 2027 10 mo to go— 139
Cotier House 1 By Imtiaz3394 · Palm DeiraImtiaz Ghd Real Estate Development L.L.C Under construction 43.5% Jan 2027 2 mo to go— 136
Silena Residences3808 · Palm DeiraAvenew Real Estate Development L.L.C Under construction 3.8% May 2028 18 mo to go— 123
Ocean Bay by Samana Developers3881 · Palm DeiraSamana Platinum Real Estate Development L.L.C Under construction 3.2% Jun 2028 19 mo to go— 114
Cotier House 2 By Imtiaz3671 · Palm DeiraImtiaz Ug Real Estate Development L.L.C Under construction 20.2% Apr 2027 5 mo to go— 110
Liv Oceanside4191 · Palm DeiraLiv Island Real Estate Development L.L.C Under construction 14.1% Nov 2027 12 mo to go— 109
Beach Walk Grand 2 By Imtiaz3724 · Palm DeiraImtiaz Ghd Real Estate Development L.L.C Under construction 23.5% Dec 2027 13 mo to go— 107
Beach Walk Grand By Imtiaz3367 · Palm DeiraImtiaz Bwg Real Estate Development L.L.C Under construction 53.2% Dec 2026 1 mo to go— 106
Esme' Beach Residences3410 · Palm DeiraElysian Luxury Real Estate Development L.L.C Under construction 14.4% Apr 2027 5 mo to go— 104
Villa Del Divos Residences3489 · Palm DeiraDivo Home Real Estate Development L.L.C Under construction 51.9% Jun 2027 7 mo to go— 101
OCTA ISLE Interiors by MISSONI3793 · Palm DeiraOcta Di Development CO. L.L.C Under construction 6.2% Sep 2027 10 mo to go— 94
Sunset Bay Grand By Imtiaz3868 · Palm DeiraImtiaz Ghd Real Estate Development L.L.C Under construction 16.3% Feb 2028 15 mo to go— 83
Elle Residences4065 · Palm DeiraAnax Developments L.L.C Not started 0% Sep 2027 10 mo to go— 83
Ayamore Residence3561 · Palm DeiraAyat Real Estate Development L.L.C Under construction 67.6% Mar 2027 4 mo to go— 81
Seacliff by Imtiaz4306 · Palm DeiraImtiaz Luxury Real Estate Development L.L.C Under construction 7.7% Aug 2028 21 mo to go— 80
Edgewater Residences 23011 · Palm DeiraM G S Development L.L.C Under construction 54.7% Aug 2026 2 mo past2 mo 78
Ocean Pearl 2 By SD3238 · Palm DeiraSamana Star Real Estate Development L.L.C Under construction 23.3% Mar 2027 4 mo to go— 76
Shoaq3630 · Palm DeiraAvenew Real Estate Development L.L.C Under construction 8.6% Oct 2027 11 mo to go— 75
Haven Bay Residences3101 · Palm DeiraMetac Properties L.L.C Under construction 82.9% Jun 2026 4 mo past4 mo 68
Seaside by Prestige One3119 · Palm DeiraPrestige The Seaside Real Estate Development L.L.C Under construction 43% Dec 2026 1 mo to go— 67
Sunset Bay One By Imtiaz3460 · Palm DeiraImtiaz Sunset Real Estate Development L.L.C Under construction 78% Dec 2026 1 mo to go— 66
Sunset Bay Two By Imtiaz3570 · Palm DeiraImtiaz Real Estate Investment & Development L.L.C Under construction 70.2% Feb 2027 3 mo to go— 66
Coastal Haven by Prestige Harbour Real Estate Development3544 · Palm DeiraPrestige Harbour Real Estate Development L.L.C Under construction 33% Nov 2027 12 mo to go— 64
Sunset Bay Three By Imtiaz3604 · Palm DeiraImtiaz Sunset Real Estate Development L.L.C Under construction 60% Mar 2027 4 mo to go— 64
Sunset Bay Four By Imtiaz3714 · Palm DeiraImtiaz Sunset Real Estate Development L.L.C Under construction 53% May 2027 6 mo to go— 64
Rena3447 · Palm DeiraAvenew Real Estate Development L.L.C Under construction 31.8% May 2027 6 mo to go— 61
Beach Walk Residences 4 by Imtiaz3707 · Palm DeiraImtiaz Real Estate Investment & Development L.L.C Under construction 42.9% Apr 2027 5 mo to go— 61
Zephyra Residences3252 · Palm DeiraArsenal East Real Estate Development L.L.C Under construction 30.5% Dec 2027 13 mo to go— 60
Bonds Avenue Residences3276 · Palm DeiraAmirah Living Developer L.L.C Under construction 6.9% Dec 2026 1 mo to go— 59
Villa del Gavi Residences3751 · Palm DeiraMr Eight Real Estate Development L.L.C Under construction 37.6% Dec 2027 13 mo to go— 59
Nuvana by Wadan3885 · Palm DeiraWadan Real Estate Development L.L.C Under construction 24.9% Sep 2027 10 mo to go— 58
Lia4195 · Palm DeiraAvenew Real Estate Development L.L.C Under construction 4.1% May 2028 18 mo to go— 57
Ocean Pearl By SD3167 · Palm DeiraSamana Star Real Estate Development L.L.C Under construction 25.1% Dec 2026 1 mo to go— 56
Arya Residences by Citi Developers3874 · Palm DeiraCiti Developers Real Estate Development L.L.C Under construction 3% Dec 2027 13 mo to go— 56
Allegro Residences3404 · Palm DeiraMill Hill Riviera Development L.L.C Under construction 84.5% Apr 2026 6 mo past6 mo 55
Luxury Canal Residences3568 · Palm DeiraPrestige Harbour Real Estate Development L.L.C Under construction 28.9% Nov 2027 12 mo to go— 55
SUNSET BAY FIVE by Imtiaz3811 · Palm DeiraImtiaz Ug Real Estate Development L.L.C Under construction 44.5% Oct 2027 11 mo to go— 55
Arka Enclave Residences3799 · Palm DeiraManodev Real Estate Development L.L.C Under construction 3.5% Dec 2027 13 mo to go— 53
Whitecliffs Residences3384 · Palm DeiraAgp Builders Real Estate Development L.L.C Under construction 17.5% Dec 2027 13 mo to go— 49
Hatimi Residences By Fakhruddin2981 · Palm DeiraFakhruddin Properties Development L.L.C Under construction 50.8% Oct 2026 under 1 mo past— 48
Treppan Serenique Residences3718 · Palm DeiraFakhruddin Properties Development L.L.C Under construction 5.2% Oct 2027 11 mo to go— 47
Meriden Beach by Green Horizon4010 · Palm DeiraGreen Horizon Real Estate Development L.L.C Under construction 1.4% Dec 2027 13 mo to go— 46
Hermina By Casagrand Gallantee Real Estate4152 · Palm DeiraCasagrand Gallantee Real Estate L.L.C Under construction 4.7% Oct 2029 35 mo to go— 46
Isolana Residences3640 · Palm DeiraHayaat Ikhlaq Developments L.L.C Under construction 5.5% Mar 2027 4 mo to go— 45
Dreamlife Residences3683 · Palm DeiraNova Power Real Estate L.L.C Under construction 31% Jan 2027 2 mo to go— 45
Mackerel Tower3351 · Palm DeiraTarrad Development L.L.C Under construction 56.6% Apr 2026 7 mo past7 mo 44
House Of Well4072 · Palm DeiraWell Concept Real Estate Development L.L.C Under construction 6.7% May 2027 6 mo to go— 44
Wellington Ocean Walk4026 · Palm DeiraWellington Ocean Real Estate Development L.L.C Under construction 20.8% Dec 2028 25 mo to go— 43
Villa dell Arte4251 · Palm DeiraAmberton Residences Real Estate L.L.C Not started 0% Dec 2027 13 mo to go— 42
Beach Walk Residences 3 By Imtiaz3285 · Palm DeiraImtiaz Real Estate Investment & Development L.L.C Under construction 97.3% Jun 2026 4 mo past4 mo 41
Flora Shore by Calgary Properties3626 · Palm DeiraCalgary Properties L.L.C Under construction 2.2% Sep 2027 10 mo to go— 41
Avida Residences4066 · Palm DeiraSerene Marina Real Estate Development L.L.C Under construction 6.8% Dec 2027 13 mo to go— 40
Vestoria Bay3858 · Palm DeiraAhmadyar Real Estate Development L.L.C Under construction 3.6% Nov 2027 12 mo to go— 39
Agua Residences by Citi Developers - Tower 13872 · Palm DeiraCiti Developers Real Estate Development L.L.C Under construction 5% Dec 2027 13 mo to go— 39
Azura Residences3080 · Palm DeiraDigo Real Estate Development (Br Of Invest Group Overseas (L L C) ) Under construction 69.1% — — 38
Tomorrow 1663638 · Palm DeiraTomorrow World Real Estate Development L.L.C Under construction 1.7% May 2027 6 mo to go— 35
Beach Residences Dubai Islands2811 · Palm DeiraNakheel And Excelsior Real Estate L.L.C Under construction 28.8% — — 33
Agua Residences by Citi Developers - Tower 23756 · Palm DeiraCiti Developers Real Estate Development L.L.C Under construction 3.1% Dec 2027 13 mo to go— 33
Sea Legend One By Mvs Real Estate3265 · Palm DeiraM V S Real Estate Development L.L.C Under construction 22.2% Nov 2026 0 mo to go— 31
Wellington Ocean by ANK Motiwala Developments3452 · Palm DeiraA N K Motiwala Real Estate Development L.L.C Under construction 33.1% Dec 2027 13 mo to go— 31
Capital Horizon Terraces3401 · Palm DeiraCapital International Real Estate Developer L.L.C Under construction 4.4% Oct 2026 under 1 mo past— 30
Iluka Residences3042 · Palm DeiraMs Homes Developers L.L.C Under construction 57.2% Aug 2026 2 mo past2 mo 29
Flow Residences3830 · Palm DeiraMain Realty Real Estate L.L.C Under construction 4.1% Oct 2027 11 mo to go— 28
Luzora Residences3620 · Palm DeiraD I A Homes Real Estate Development L.L.C Under construction 21.3% Jan 2027 2 mo to go— 27
Nautis Residences3654 · Palm DeiraStamn Real Estate Development L.L.C Under construction 0.9% Aug 2027 9 mo to go— 26
Allegro Park by Mill Hill Riviera Development4077 · Palm DeiraMill Hill Riviera Development L.L.C Under construction 4.2% Apr 2027 5 mo to go— 26
Natuzzi Harmony Residences by Peace Homes3223 · Palm DeiraPeace Homes Real Estate L.L.C Under construction 43.7% Sep 2026 1 mo past1 mo 25
Edgewater Residences2930 · Palm DeiraM G S Development L.L.C Under construction 47.8% — — 24
Bayview Boulevard3251 · Palm DeiraAb Developers L.L.C Under construction 55.2% Apr 2027 5 mo to go— 24
Floarea Breeze4061 · Palm DeiraMashriq Elite Real Estate Development L.L.C Under construction 3.8% Jun 2028 19 mo to go— 23
Ocean Tower3149 · Palm DeiraAhmed Alansari Real Estate Development L.L.C Under construction 30.3% Sep 2026 1 mo past1 mo 22
Aquora by Casa Vista Development4014 · Palm DeiraCasa Vista Development L.L.C Under construction 2.7% Oct 2028 23 mo to go— 22
997 Residences by Reef Luxury Development3837 · Palm DeiraReef Luxury Development L.L.C Under construction 4.9% Mar 2028 16 mo to go— 20
Blue Marina Residence by Shakirov Developments3867 · Palm DeiraShakirov Developments L.L.C Under construction 13.4% Oct 2027 11 mo to go— 19
Firoza3887 · Palm DeiraEver Glory Real Estate Development L.L.C Not started 0% Oct 2027 11 mo to go— 18
241 Waterside4093 · Palm DeiraLegacy Star Real Estate Development L.L.C Not started 0% Jun 2028 19 mo to go— 17
Bay Residences Dubai Islands2719 · Palm DeiraNakheel And Excelsior Real Estate L.L.C Under construction 47.9% Oct 2026 under 1 mo past— 16
Sea Coral By Next Realty3062 · Palm DeiraNext Realty Real Estate L.L.C Under construction 10.7% Aug 2027 9 mo to go— 16
Sea View Residence By Sama Mayas3721 · Palm DeiraSama Mayas Real Estate Development L.L.C Under construction 12.7% Sep 2027 10 mo to go— 15
Villa Del Brunello Residences4011 · Palm DeiraDivo Home Real Estate Development L.L.C Under construction 2.2% Nov 2027 12 mo to go— 14
Liora4276 · Palm DeiraJaiedco Real Estate Development L.L.C Not started 0% Jan 2028 14 mo to go— 14
Kaia4418 · Palm DeiraDyar Amwaj Real Estate Development L.L.C Not started 0.2% Dec 2028 25 mo to go— 14
Ocean Crest by SD3878 · Palm DeiraSamana Platinum Real Estate Development L.L.C Under construction 1.4% Jun 2028 19 mo to go— 12
Helvetia Marine4157 · Palm DeiraD H G Property Development L.L.C Not started 0% Mar 2028 16 mo to go— 11
Vue Doree4194 · Palm DeiraCrystal Bay Azure Development L.L.C Under construction 1.3% Nov 2028 24 mo to go— 10
Tivanno Residence4284 · Palm DeiraA Y S Property Development Under construction 5.3% Dec 2027 13 mo to go— 9
Soma Residences4453 · Palm DeiraOrigami Development L.L.C Not started 0% Sep 2028 22 mo to go— 7
Marea3879 · Palm DeiraSharafi Real Estate Development L.L.C Under construction 5.3% Jun 2027 7 mo to go— 6
Maravea Residences4189 · Palm DeiraEnzo Prime Real Estate Development L.L.C S.O.C Not started 0% Apr 2028 17 mo to go— 5
The Tides By Amis4224 · Palm DeiraAmis Aurum Real Estate Development L.L.C Not started 0% Apr 2028 17 mo to go— 5

Source: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026.

Units not yet completed, by DLD end year

134 phases
2025: 1202026: 1,7002027: 4,9822028: 4,8142029: 1,4122030: 3572031: 939No end date: 561

Units · phases. “None”: no DLD end date registered yet. Source: DLD projects register, export of 1 November 2026.

More on Nakhlat Deira

Own a unit in one of these projects? Track it free

Area prices

2022-Q1 – 2026-Q4

Median AED/sqft of off-plan sales of apartments by quarter in DLD area Palm Deira, where most of the community’s projects are registered.

DLD area Palm Deira, median AED/sqft of off-plan sales of apartments by quarter. A quarter with fewer than 5 sales is left as a gap. The last quarter runs to 5 November 2026.

Source: Dubai Land Department transactions, on Dubai Data.

Rents in DLD area Palm Deira

New Ejari rent contracts for apartments across DLD area Palm Deira, 12 months to 5 November 2026, against the 12 months before: the rent level around this project. No yield is shown before the project is completed.

Bedrooms Median annual rent New contracts Change on a year earlier
1 BR AED 100,000 9 —
2 BR AED 117,684 8 —

New single-unit contracts only; renewals and contracts over several units are left out. A bedroom count shows from 5 contracts, a change needs 5 in both years and a yield 10 ready sales.

Source: Dubai Land Department open data (Ejari rent contracts and registered sales), under the Dubai Data Open Data Licence.

Registered sales in DLD area Palm Deira

The newest home sales DLD has registered in DLD area Palm Deira, as DLD publishes them, with the project where DLD names one.

The newest 10 of 4,366 registered sales in the 12 months to 5 November 2026
DateProjectMarketType Size (sqft) Price (AED) AED/sqft
5 November 2026Villa Del Brunello Residencesoff-planApartment · 2 BR 1,423 5,746,000 4,038
5 November 2026The Meriva Collectionoff-planApartment · 2 BR 1,278 4,024,828 3,149
5 November 2026Elle Residencesoff-planApartment · 2 BR 976 3,088,777 3,165
5 November 2026The Meriva Collectionoff-planApartment · 1 BR 837 2,802,828 3,349
4 November 2026Meriden Beach by Green Horizonoff-planApartment · 2 BR 1,365 2,913,406 2,134
4 November 2026Nautis Residencesoff-planApartment · 2 BR 961 2,114,711 2,201
4 November 2026Azura Residencesoff-planApartment · 1 BR 873 1,779,731 2,039
3 November 2026Silena Residencesoff-planPenthouse 12,512 58,000,000 4,636
3 November 2026The Meriva Collectionoff-planApartment · 3 BR 1,764 6,389,828 3,622
3 November 2026Beach Walk Residences 2readyApartment · 3 BR 2,523 4,937,880 1,957

The newest 10 of 4,366 registered sales in the 12 months to 5 November 2026

Each sale as DLD registers it. Off-plan registrations include developer sales and resales, which DLD open data does not tell apart. DLD publishes no buyer or seller names. Shown on this page only, not as a download.

Source: Dubai Land Department open data, published on Dubai Data under the Dubai Data Open Data Licence. DLD Transactions dataset · Licence

Places inside the community

Places inside the Dubai Municipality outline of the community, by kind.

Supermarkets
1
Beaches
10

Metro and tram stations: Roads and Transport Authority (RTA) via Dubai Data. Other places: © OpenStreetMap contributors.

Data: DLD projects register, export of 1 November 2026; DLD sales register to 5 November 2026; Dubai Municipality community outlines. Methodology